Letter of compliance/Occupancy | | | 4/17/2019 | | DONE |
|
|
|
|
BLD-Final | 4/12/2019 | 4/15/2019 | 4/15/2019 | A | PASS |
Brandon Shaw
|
|
|
Vedad Phone #: ###-####
|
DOC - Permit Finaled | 4/15/2019 | 4/15/2019 | 4/15/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 4/15/2019 | 4/15/2019 | 4/15/2019 | A | DONE |
Brandon Shaw
|
|
|
ACH50- 4.02
|
BLD-Energy code compliance | 8/29/2018 | 8/29/2018 | 8/29/2018 | P | PASS |
Jim Sly
|
|
|
|
BLD-Framing/Rough-in | 8/28/2018 | 8/29/2018 | 8/29/2018 | A | PASS |
Jim Sly
|
|
|
Vedad Phone #: ###-####
|
BLD-Framing/Rough-in | 8/24/2018 | 8/27/2018 | 8/27/2018 | P | PASS |
Jim Sly
|
|
|
Verdad Phone #: ###-####
|
BLD-Wall Bracing | 7/26/2018 | 7/27/2018 | 7/27/2018 | A | PASS |
Jim Sly
|
|
|
Vedad Phone #: ###-####
|
BLD-Foundation | 6/21/2018 | 6/22/2018 | 6/23/2018 | P | PASS |
Jim Sly
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo Lira
|
BLD-Footing | 6/19/2018 | 6/20/2018 | 6/20/2018 | P | PART |
Jim Sly
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo Lira Work in progress.....No string line pulled at rear property line. Pour at own risk.
|
OVERRIDE | | | 6/8/2018 | | |
|
|
|
|
Plan assigned to (RDP) | 5/25/2018 | 5/25/2018 | 6/8/2018 | | DONE |
Rob Patrick
|
|
|
6/7 sfd L1 ePlan...6/1: Failed...corrections required
|
Issue PAID IN FULL permit | | | 6/8/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/8/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/8/2018 | | 6/8/2018 | | PASS |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/8/2018 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 6/8/2018 | | DONE |
|
|
|
met
|
1st review completed | | | 6/1/2018 | | FAIL |
Rob Patrick
|
|
|
Corrections Required
|
Routing - PLAN CHECK | 5/25/2018 | | 6/1/2018 | | FAIL |
Rob Patrick
|
|
|
Corrections Required
|
Route to Impact Fee Review | 5/25/2018 | 5/28/2018 | 5/29/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 5/25/2018 | | 5/25/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 5/25/2018 | | 5/25/2018 | | PASS |
Jeff Lowe
|
|
|
maintain minimum 3FT buffer between edge of driveway and property line
|
Routing - Addressing | 5/25/2018 | | 5/25/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 5/25/2018 | | 5/25/2018 | | PASS |
Rachael Beierle
|
|
|
|
Intake Approval | | | 5/25/2018 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/25/2018 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/25/2018 | | DONE |
|
|
|
|
Intake Approval | | | 5/9/2018 | | FAIL |
Tisha Gallop
|
|
|
1. Please provide handrail height, guard height, guard opening requirements per 2015 IRC.
2. Provide Idaho stamped structural engineering for tall walls (balloon framed walls), including shear.
3. Please update code reference on site map to current code adopted by Boise City, 2015 IRC.
4. Please update prescriptive shear calcs to current standard wind speed for Boise City, 115 mph.
|
Intake Approval | | | 5/3/2018 | | FAIL |
|
|
|
MISSING
1)hand rail measurements
2)uploaded wrong way
3)incorrect file name
4) documents and drawings not minimum size
5)building cross section
6)connctors/anchor bolts
7)electrical page is too light to read/review
|
Application received | | | 4/23/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 23 2018 10:06PM
|