BLD-Final | 12/24/2018 | 12/24/2018 | 12/26/2018 | P | PASS |
Jim Storey
|
|
|
Jim spoke with Christina. since the bond is in there you may pass the final (if you're ok with that). Give me a call if you have quesitons. Brittany
|
DOC - Permit Finaled | 12/26/2018 | 12/26/2018 | 12/26/2018 | P | PASS |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 12/26/2018 | 12/26/2018 | 12/26/2018 | P | PASS |
Jim Storey
|
|
|
|
BLD-Blower Door Test Results | 12/26/2018 | 12/26/2018 | 12/26/2018 | P | DONE |
Jim Storey
|
|
|
Jim spoke with Christina. since the bond is in there you may pass the final (if you're ok with that). Give me a call if you have quesitons. Brittany 3.9
|
PubWorks Occupancy Approval | 12/26/2018 | 12/26/2018 | 12/26/2018 | | DONE |
Jason C. Taylor
|
|
|
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Final | 12/24/2018 | 12/24/2018 | 12/24/2018 | P | PART |
Jim Storey
|
|
|
Les Phone #: ###-#### final ok pending pw bonded per contractor no notes in case history.
|
BLD-Energy code compliance | 9/18/2018 | 9/19/2018 | 9/19/2018 | A | PASS |
Brandon Shaw
|
|
|
les Phone #: ###-####
|
BLD-Framing/Rough-in | 9/14/2018 | 9/17/2018 | 9/17/2018 | A | PASS |
Dave Hannah
|
|
|
les Phone #: ###-####
|
BLD-Other | 9/14/2018 | 9/17/2018 | 9/17/2018 | A | PASS |
Dave Hannah
|
|
|
air seal-les Phone #: ###-####
|
BLD-Other | 9/14/2018 | 9/17/2018 | 9/17/2018 | A | PASS |
Dave Hannah
|
|
|
sofits -les Phone #: ###-####
|
BLD-Wall Bracing | 8/8/2018 | 8/8/2018 | 8/8/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progrees- Blocking missed at a few panels
|
BLD-Foundation | 6/19/2018 | 6/19/2018 | 6/19/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Footing | 6/18/2018 | 6/18/2018 | 6/18/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
|
PubWorks Subgrade Approval | 6/11/2018 | 6/11/2018 | 6/11/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 6/1/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/1/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 5/18/2018 | | |
|
|
|
|
Plan assigned to (M_H) | 4/25/2018 | | 5/18/2018 | | DONE |
Michael Hanson
|
|
|
05/14 sfd L2 ePlan. 1st review completed - Structural deficiences and foundation and main floor plan do not align. MDH
|
Routing - PLAN CHECK | 5/15/2018 | | 5/18/2018 | | PASS |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/18/2018 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 5/18/2018 | | DONE |
|
|
|
met
|
Plan Reviewer's activity | | | 5/15/2018 | | DONE |
Michael Hanson
|
|
|
|
1st review completed | | | 5/15/2018 | | FAIL |
Michael Hanson
|
|
|
Structural deficiences and foundation and main floor plan do not align. MDH
|
Routing - PLAN CHECK | 4/25/2018 | | 5/15/2018 | | FAIL |
Michael Hanson
|
|
|
Structural deficiences and foundation and main floor plan do not align. MDH
|
Routing - FIRE | 4/25/2018 | 4/25/2018 | 4/27/2018 | | PASS |
Tim Frost
|
|
|
5/14 house
Fire Sprinklers are required due to single point access.
|
Routing - MECHANICAL | 4/25/2018 | | 4/27/2018 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 4/25/2018 | 4/28/2018 | 4/26/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing PW Grading-Hillside | 4/25/2018 | | 4/26/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
|
Routing - Erosion and Sediment | 4/25/2018 | | 4/26/2018 | | PASS |
Michael Zawacki
|
|
|
Foothills lot, site prep inspection required.
|
Routing - PLANNING | 4/25/2018 | | 4/25/2018 | | PASS |
Sue Cummings
|
|
|
|
Routing - Addressing | 4/25/2018 | | 4/25/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 4/25/2018 | | 4/25/2018 | | PASS |
Rachael Beierle
|
|
|
|
Intake Approval | | | 4/25/2018 | | FAIL |
|
|
|
Plan sheet A3.1 section needes to be reuploaded (can not read part of sheet)
|
Plans ACCEPTED BY PLAN TECH | | | 4/25/2018 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/25/2018 | | DONE |
|
|
|
|
Intake Approval | | | 4/25/2018 | | PASS |
|
|
|
|
Application received | | | 4/24/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 24 2018 9:34AM
|