BLD-Final | 10/25/2018 | 10/26/2018 | 10/26/2018 | A | PASS |
Mike Jordan
|
|
|
Chris Phone #: ###-####
|
DOC - Permit Finaled | 10/26/2018 | 10/26/2018 | 10/26/2018 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Energy code compliance | 7/26/2018 | 7/27/2018 | 7/27/2018 | A | PASS |
Jim Sly
|
|
|
Chris Phone #: ###-####
|
BLD-Framing/Rough-in | 7/10/2018 | 7/11/2018 | 7/11/2018 | A | PASS |
Jim Sly
|
|
|
Chris Phone #: ###-####
|
BLD-Wall Bracing | 6/25/2018 | 6/26/2018 | 6/26/2018 | A | PASS |
Jim Sly
|
|
|
Chris Phone #: ###-####
|
BLD-Foundation | 5/9/2018 | 5/10/2018 | 5/10/2018 | P | PASS |
Jim Sly
|
|
|
Matt Phone #: ###-####
|
BLD-Footing | 5/9/2018 | 5/9/2018 | 5/9/2018 | P | PASS |
Jim Sly
|
|
|
Matt Phone #: ###-####
|
Issue PAID IN FULL permit | | | 5/4/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 5/3/2018 | | |
|
|
|
|
Plan assigned to (RDP) | 4/24/2018 | 4/24/2018 | 5/3/2018 | | DONE |
Rob Patrick
|
|
|
5/7 sfd L1 Paper...5-1...Failed: Needs porch post detail & Hold downs added
|
Plan resubmittals received | | | 5/3/2018 | | DONE |
|
|
|
Two copies of sheets 2 and 4 taken Rob
|
Routing - PLAN CHECK | 5/3/2018 | | 5/3/2018 | | PASS |
Rob Patrick
|
|
|
|
Case Summary (BLD) | | | 5/3/2018 | | DONE |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/3/2018 | | DONE |
Rob Patrick
|
|
|
|
Inspection Record Card- Bld | | | 5/3/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/3/2018 | | DONE |
|
|
|
|
Telephone call | | | 5/3/2018 | | DONE |
|
|
|
Left a voicemail to inform Chris the permit is ready and what fees are due.
|
Routing - MECHANICAL | 5/2/2018 | | 5/2/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 5/1/2018 | | 5/1/2018 | | PASS |
Andrea Tuning
|
|
|
|
1st review completed | | | 5/1/2018 | | FAIL |
Rob Patrick
|
|
|
5-1...Failed: Needs Hold Downs on Braced Wall & Detial of Covered Porch Post
|
Routing - PLAN CHECK | 5/1/2018 | | 5/1/2018 | | FAIL |
Rob Patrick
|
|
|
5-1...Failed.
|
Routing - MECHANICAL | 4/26/2018 | | 5/1/2018 | | FAIL |
Troy James
|
|
|
show window u-value as .32 and floor plan does not match the submitted plans floor drawing.
|
Plan resubmittals received | | | 4/30/2018 | | DONE |
|
|
|
full new set of plans; sheets 1-4. Taken to Rob P
|
Route to Impact Fee Review | 4/24/2018 | 4/27/2018 | 4/26/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PLANNING | 4/26/2018 | | 4/26/2018 | | FAIL |
Andrea Tuning
|
|
|
Provide an 18 to 20-foot front setback for the proposed home on 6409 York Street.
Close the existing driveway on York Street with standard vertical curb, gutter and an attached 5-foot concrete sidewalk to match the surrounding improvements.
Provide private open space that is configured as a15-feet by 25-feet rectangle located in the rear yard of each unit (between the home and the proposed parking pad). This space may include the required side yard setbacks).
Provide the open air parking spaces to be a minimum of 18-feet wide and 20-feet deep. The parking spaces are required to be located outside of the required side and rear setbacks.
|
Routing - PUBLIC WORKS | | | 4/26/2018 | | PASS |
|
|
|
|
Routing - Addressing | 4/24/2018 | | 4/25/2018 | | PASS |
Doug Chausow
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/24/2018 | | DONE |
|
|
|
|
Intake Approval | | | 4/24/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/24/2018 | | DONE |
|
|
|
|
Application received | | 4/24/2018 | | | |
|
|
|
|