Permit Information
Permit NumberBLD18-01454
StatusFinaled
Name HORNET CONSTRUCTION
Site Address 6405 W YORK ST
Project Name 
Customer Number 
ePlanReviewNo
Description
Permit for the construction of a new 945 sq. ft., one story single family dwelling with 2 bedrooms, 1 bathroom, approximately 120 sq. ft. of covered patio/porch per the approved plans and any notations. Prescriptive Energy Compliance. R-1C zoning and setbacks per planning. ***RDP***
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/25/201810/26/201810/26/2018APASS
DetailsMike Jordan
Chris Phone #: ###-####
DOC - Permit Finaled10/26/201810/26/201810/26/2018PPASS
DetailsMike Jordan
BLD-Energy code compliance7/24/20187/24/20187/24/2018PPASS
DetailsJim Sly
Chris Phone #: ###-####
BLD-Framing/Rough-in7/10/20187/11/20187/11/2018APASS
DetailsJim Sly
Chris Phone #: ###-####
BLD-Wall Bracing6/25/20186/26/20186/26/2018APASS
DetailsJim Sly
Chris Phone #: ###-####
BLD-Foundation5/9/20185/10/20185/10/2018PPASS
DetailsJim Sly
Matt Phone #: ###-####
BLD-Footing5/9/20185/9/20185/9/2018PPASS
DetailsJim Sly
Matt Phone #: ###-####
OVERRIDE  5/4/2018  
Inspection Record Card- Bld  5/4/2018 DONE
Telephone call  5/4/2018 DONE
Chris was here in the building dept so i told him it was ready and how much is owed
Issue PAID IN FULL permit  5/4/2018 DONE
Permit Ready to Issue  5/4/2018 DONE
Plan assigned to (RDP)4/24/20184/24/20185/3/2018 DONE
DetailsRob Patrick
5/7 sfd L1 Paper...5-1...Failed: Needs Porch post detail and hold downs
Plan resubmittals received  5/3/2018 DONE
Two copies of sheets 2 and 4 taken to Rob
Routing - PLAN CHECK5/3/2018 5/3/2018 PASS
DetailsRob Patrick
Case Summary (BLD)  5/3/2018 DONE
DetailsRob Patrick
PLANS/APPL TAKEN TO FRONT DESK  5/3/2018 DONE
DetailsRob Patrick
Routing - MECHANICAL5/2/2018 5/2/2018 PASS
DetailsTroy James
Plan Reviewer's activity  5/1/2018  
5-1...Returned package to Planning
Routing - Design Review5/1/2018 5/1/2018 PASS
DetailsAndrea Tuning
1st review completed  5/1/2018 FAIL
DetailsRob Patrick
5-1...Failed: Needs proch post detail and Braced wall hold down
Routing - PLAN CHECK  5/1/2018 FAIL
DetailsRob Patrick
5-1...Needs porch post detail and hold downs
Routing - MECHANICAL4/26/2018 5/1/2018 FAIL
DetailsChad Schwendiman
Address and floor plan doesn't match the submitted plans. Emailed designer.
Plan resubmittals received  4/30/2018 DONE
full new set of plans; sheets 1-4. Taken to Rob P
Routing - PLANNING4/26/2018 4/26/2018 FAIL
DetailsAndrea Tuning
Close the existing driveway on York Street with standard vertical curb, gutter and an attached 5-foot concrete sidewalk to match the surrounding improvements.

Provide the open air parking spaces to be a minimum of 18-feet wide and 20-feet deep. The parking spaces are required to be located outside of the required side and rear setbacks.
Routing - PUBLIC WORKS  4/26/2018 PASS
Routing - Addressing4/24/2018 4/25/2018 PASS
DetailsDoug Chausow
Plans ACCEPTED BY PLAN TECH  4/24/2018 DONE
Intake Approval  4/24/2018 PASS
Recd Pcfee & Taken To Pln CK  4/24/2018 DONE
Application received 4/24/2018