BLD-Final | 10/25/2018 | 10/26/2018 | 10/26/2018 | A | PASS |
Mike Jordan
|
|
|
Chris Phone #: ###-####
|
DOC - Permit Finaled | 10/26/2018 | 10/26/2018 | 10/26/2018 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Energy code compliance | 7/24/2018 | 7/24/2018 | 7/24/2018 | P | PASS |
Jim Sly
|
|
|
Chris Phone #: ###-####
|
BLD-Framing/Rough-in | 7/10/2018 | 7/11/2018 | 7/11/2018 | A | PASS |
Jim Sly
|
|
|
Chris Phone #: ###-####
|
BLD-Wall Bracing | 6/25/2018 | 6/26/2018 | 6/26/2018 | A | PASS |
Jim Sly
|
|
|
Chris Phone #: ###-####
|
BLD-Foundation | 5/9/2018 | 5/10/2018 | 5/10/2018 | P | PASS |
Jim Sly
|
|
|
Matt Phone #: ###-####
|
BLD-Footing | 5/9/2018 | 5/9/2018 | 5/9/2018 | P | PASS |
Jim Sly
|
|
|
Matt Phone #: ###-####
|
OVERRIDE | | | 5/4/2018 | | |
|
|
|
|
Inspection Record Card- Bld | | | 5/4/2018 | | DONE |
|
|
|
|
Telephone call | | | 5/4/2018 | | DONE |
|
|
|
Chris was here in the building dept so i told him it was ready and how much is owed
|
Issue PAID IN FULL permit | | | 5/4/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/4/2018 | | DONE |
|
|
|
|
Plan assigned to (RDP) | 4/24/2018 | 4/24/2018 | 5/3/2018 | | DONE |
Rob Patrick
|
|
|
5/7 sfd L1 Paper...5-1...Failed: Needs Porch post detail and hold downs
|
Plan resubmittals received | | | 5/3/2018 | | DONE |
|
|
|
Two copies of sheets 2 and 4 taken to Rob
|
Routing - PLAN CHECK | 5/3/2018 | | 5/3/2018 | | PASS |
Rob Patrick
|
|
|
|
Case Summary (BLD) | | | 5/3/2018 | | DONE |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/3/2018 | | DONE |
Rob Patrick
|
|
|
|
Routing - MECHANICAL | 5/2/2018 | | 5/2/2018 | | PASS |
Troy James
|
|
|
|
Plan Reviewer's activity | | | 5/1/2018 | | |
|
|
|
5-1...Returned package to Planning
|
Routing - Design Review | 5/1/2018 | | 5/1/2018 | | PASS |
Andrea Tuning
|
|
|
|
1st review completed | | | 5/1/2018 | | FAIL |
Rob Patrick
|
|
|
5-1...Failed: Needs proch post detail and Braced wall hold down
|
Routing - PLAN CHECK | | | 5/1/2018 | | FAIL |
Rob Patrick
|
|
|
5-1...Needs porch post detail and hold downs
|
Routing - MECHANICAL | 4/26/2018 | | 5/1/2018 | | FAIL |
Chad Schwendiman
|
|
|
Address and floor plan doesn't match the submitted plans. Emailed designer.
|
Plan resubmittals received | | | 4/30/2018 | | DONE |
|
|
|
full new set of plans; sheets 1-4. Taken to Rob P
|
Routing - PLANNING | 4/26/2018 | | 4/26/2018 | | FAIL |
Andrea Tuning
|
|
|
Close the existing driveway on York Street with standard vertical curb, gutter and an attached 5-foot concrete sidewalk to match the surrounding improvements.
Provide the open air parking spaces to be a minimum of 18-feet wide and 20-feet deep. The parking spaces are required to be located outside of the required side and rear setbacks.
|
Routing - PUBLIC WORKS | | | 4/26/2018 | | PASS |
|
|
|
|
Routing - Addressing | 4/24/2018 | | 4/25/2018 | | PASS |
Doug Chausow
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/24/2018 | | DONE |
|
|
|
|
Intake Approval | | | 4/24/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/24/2018 | | DONE |
|
|
|
|
Application received | | 4/24/2018 | | | |
|
|
|
|