BLD-Final | 9/4/2018 | 9/4/2018 | 9/4/2018 | P | PASS |
Mike Jordan
|
|
|
garage code 7920 Phone #: ###-#### Inspection requested via web by Andy Thompson
|
DOC - Permit Finaled | 9/4/2018 | 9/4/2018 | 9/4/2018 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Blower Door Test Results | 9/4/2018 | 9/4/2018 | 9/4/2018 | P | DONE |
Mike Jordan
|
|
|
4.89ACH @50pa
|
BLD-Energy code compliance | 7/13/2018 | 7/13/2018 | 7/13/2018 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Andy Thompson
|
BLD-Framing/Rough-in | 7/13/2018 | 7/13/2018 | 7/13/2018 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Andy Thompson
|
BLD-Framing/Rough-in | 7/11/2018 | 7/12/2018 | 7/12/2018 | A | FAIL |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Andy Thompson. Complete lateral bracing on A3 and B1 trusses. Fireblock fur dowm in masterbedroom and mech chases upstairs. Provide attic access in livingroom/bedroom and aditional access in garage. Finish nailing off 3ply B2 attic truss. Correction notice posted.
|
BLD-Framing/Rough-in | 7/11/2018 | 7/11/2018 | 7/11/2018 | P | CANC |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Andy Thompson Inspection cancelled from web by: Andy Thompson
|
BLD-Wall Bracing | 6/26/2018 | 6/26/2018 | 6/26/2018 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Andy Thompson
|
BLD-Wall cover | 6/22/2018 | 6/25/2018 | 6/25/2018 | A | FAIL |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Andy Thompson. Provide the portal frame at arched window as shown on approved plans, complete 2nd. floor.
|
BLD-Footing | 5/24/2018 | 5/24/2018 | 5/24/2018 | P | PASS |
Mike Jordan
|
|
|
Andy- Matt Phone #: ###-####
|
OVERRIDE | | | 5/23/2018 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 5/23/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/23/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/23/2018 | | 5/23/2018 | | PASS |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/23/2018 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 5/23/2018 | | DONE |
Christina Prado
|
|
|
All requirements met
|
Plan assigned to (M_H) | 5/7/2018 | | 5/23/2018 | | DONE |
Michael Hanson
|
|
|
05/18 sfd L1 ePlan. 1st review completed - Wall bracing deficiencies. MDH
|
Routing - PLAN CHECK | 5/7/2018 | | 5/18/2018 | | FAIL |
Michael Hanson
|
|
|
Wall bracing deficiencies. MDH
|
Plan Reviewer's activity | | | 5/18/2018 | | DONE |
Michael Hanson
|
|
|
|
1st review completed | | | 5/18/2018 | | FAIL |
Michael Hanson
|
|
|
Wall bracing deficiencies. MDH
|
Route to Impact Fee Review | 5/7/2018 | 5/10/2018 | 5/8/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 5/7/2018 | | 5/8/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 5/7/2018 | | 5/7/2018 | | PASS |
Sue Cummings
|
|
|
|
Routing - Addressing | 5/7/2018 | | 5/7/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 5/7/2018 | | 5/7/2018 | | PASS |
Morgan Webb
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/7/2018 | | DONE |
|
|
|
|
Intake Approval | | | 5/7/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/7/2018 | | DONE |
|
|
|
|
Intake Approval | | | 5/4/2018 | | FAIL |
|
|
|
Two sheets facing the incorrect way and three sheet do not met minimum size requirement
|
Intake Approval | | | 5/4/2018 | | FAIL |
|
|
|
Two sheets facing the incorrect way and three sheet do not met minimum size requirement.
Spoke with Andy informing him he needs to do the minimum plan sheet size for 3 plans and rotate 2 plans
|
Intake Approval | | | 5/1/2018 | | FAIL |
|
|
|
need 2015 codes
|
Application received | | | 4/25/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 25 2018 1:53PM
|