BLD-Final | 12/11/2018 | 12/12/2018 | 12/12/2018 | P | PASS |
Brandon Shaw
|
|
|
Alan Phone #: ###-####
|
DOC - Permit Finaled | 12/12/2018 | 12/12/2018 | 12/12/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Aging Inspection | 12/12/2018 | 12/12/2018 | 12/12/2018 | | CANC |
Brandon Shaw
|
|
|
|
BLD-Aging Inspection | 12/11/2018 | 12/11/2018 | 12/11/2018 | | CANC |
Brandon Shaw
|
|
|
|
PubWorks Occupancy Approval | 12/11/2018 | 12/11/2018 | 12/11/2018 | | DONE |
Melissa Jannusch
|
|
|
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Final | 11/5/2018 | 11/6/2018 | 11/6/2018 | A | PEND |
Brandon Shaw
|
|
|
Temporary occupancy OK'd for 30 days... Need PW approval... Need blower door results posted...
|
BLD-Wall cover | 7/27/2018 | 7/30/2018 | 7/30/2018 | A | PASS |
Brandon Shaw
|
|
|
Interior shear
|
BLD-Framing/Rough-in | 7/26/2018 | 7/27/2018 | 7/27/2018 | A | PASS |
Brandon Shaw
|
|
|
Soffits
|
BLD-Energy code compliance | 7/23/2018 | 7/24/2018 | 7/24/2018 | A | PASS |
Brandon Shaw
|
|
|
Alan Phone #: ###-####
|
BLD-Framing/Rough-in | 7/23/2018 | 7/24/2018 | 7/23/2018 | A | CANC |
Brandon Shaw
|
|
|
Alan Phone #: ###-#### Inspection cancelled from web by: Keeley Wilson
|
BLD-Wall Bracing | 7/20/2018 | 7/23/2018 | 7/23/2018 | A | PART |
Brandon Shaw
|
|
|
Exterior and hold downs only Interior shear- work in progress
|
BLD-Other | 7/20/2018 | 7/23/2018 | 7/23/2018 | A | FAIL |
Brandon Shaw
|
|
|
sofit- Alan Phone #: ###-####
|
BLD-Wall Bracing | 7/20/2018 | 7/20/2018 | 7/20/2018 | P | CANC |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 7/19/2018 | 7/20/2018 | 7/20/2018 | A | PASS |
Dave Hannah
|
|
|
Alan Phone #: ###-####
|
BLD-Foundation | 6/3/2018 | 6/4/2018 | 6/4/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Footing | 5/31/2018 | 6/1/2018 | 6/1/2018 | A | PASS |
Brandon Shaw
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Footing | 5/30/2018 | 5/31/2018 | 5/31/2018 | A | NR |
Brandon Shaw
|
|
|
Need Geo and P.W. approval
|
PubWorks Subgrade Approval | 5/31/2018 | 5/31/2018 | 5/31/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 5/25/2018 | | DONE |
|
|
|
|
(F) Reprint permit | | | 5/25/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 5/24/2018 | | |
|
|
|
|
Telephone call | | | 5/24/2018 | | DONE |
|
|
|
called Alan and told him permit is ready, fee due and need RP
|
Inspection Record Card- Bld | | | 5/24/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/24/2018 | | DONE |
Christina Prado
|
|
|
Need RP - met
|
Plan assigned to (BJM) | | 4/26/2018 | 5/23/2018 | | DONE |
Brian McGowan
|
|
|
1st review complete - 5-15 sfd L2 paper
|
Routing PW Grading-Hillside | 5/23/2018 | | 5/23/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
|
Routing - PUBLIC WORKS | 5/23/2018 | | 5/23/2018 | | PASS |
Rachael Beierle
|
|
|
|
Routing - PLAN CHECK | 5/23/2018 | | 5/23/2018 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 5/23/2018 | | DONE |
Brian McGowan
|
|
|
|
Plan resubmittals received | | | 5/23/2018 | | DONE |
|
|
|
received one copy of structural calcs (117 pgs); taken to Brian McGowan
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/23/2018 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLANNING | 5/23/2018 | | 5/23/2018 | | PASS |
Sue Cummings
|
|
|
Receiveed HR HOA approval 5/23/18
|
Plan resubmittals received | | | 5/18/2018 | | DONE |
|
|
|
received one copy of engineering calcs and two copies of plan sheets 2.0, 5.0, 6.0, 7.0; taken to Brian McGowan
|
Routing - PLAN CHECK | | | 5/15/2018 | | FAIL |
Brian McGowan
|
|
|
Need further WUI info, corrections to engineering.
|
1st review completed | | | 5/15/2018 | | FAIL |
Brian McGowan
|
|
|
Need further WUI info, corrections to engineering.
|
Plan Reviewer's activity | | | 5/15/2018 | | |
Brian McGowan
|
|
|
Took plans to PW for Melissa to review.
|
Plan resubmittals received | | | 5/10/2018 | | DONE |
|
|
|
PW received resubmittals-received 2 sets of Strat calcs-took to Brian MacGowan
|
Routing - FIRE | 5/2/2018 | 4/26/2018 | 5/7/2018 | | PASS |
Tim Frost
|
|
|
5/15 house
|
Routing - Erosion and Sediment | 5/1/2018 | | 5/2/2018 | | PASS |
Andy J. Long
|
|
|
ESC plan approved. Project needs certified RP to issue. Notified GC Adera Homes. Site preparation inspection required.
|
Routing PW Grading-Hillside | 4/27/2018 | | 5/1/2018 | | FAIL |
Melissa Jannusch
|
|
|
Needs geotech report
|
Routing PW Sewer Rating | 5/1/2018 | | 5/1/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing - PUBLIC WORKS | 4/26/2018 | | 5/1/2018 | | FAIL |
Rachael Beierle
|
|
|
see Hillside
|
Routing - MECHANICAL | 5/1/2018 | | 5/1/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | | | 5/1/2018 | | FAIL |
|
|
|
Needs Harris Ranch HOA approval letter,
|
Route to Impact Fee Review | 4/26/2018 | 4/29/2018 | 4/27/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Addressing | 4/26/2018 | | 4/27/2018 | | PASS |
Laura Hunter
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/26/2018 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/26/2018 | | DONE |
|
|
|
|
Intake Approval | | | 4/26/2018 | | PASS |
|
|
|
|
Intake Approval | | | 4/25/2018 | | FAIL |
|
|
|
Missing Rise and Tread for stairs
Told customer to call Melissa to find out if CATI or CATII
|
Application received | | 4/25/2018 | | | |
|
|
|
|