BLD-Final | 8/12/2020 | 8/12/2020 | 8/12/2020 | P | NR |
Tell Riley
|
|
|
Joe *screened Phone #: ###-####//most corrections were made//need UL listing for alarms to meet code requirements//latch on outside of gate needs to be above 54" for code requirements//Joe will get info and lift latch//
|
BLD-Final | 7/27/2020 | 7/28/2020 | 7/28/2020 | A | FAIL |
Tell Riley
|
|
|
Joe - */Screened*/ Phone #: ###-####//see CN left with Joe for framing, alarms and landscaping// part of deck is existing, including the escape window and grate, part of original deck//
|
BLD-Conference | 7/1/2020 | 7/2/2020 | 7/2/2020 | A | DONE |
Tell Riley
|
|
|
Neighborhood complaint - Pool being used without final inspection. Phone #: ###-####//CN posted to obtain zoning and building approvals and inspections//certificate of compliance will need to be obtained prior to occupancy//
|
BLD-Aging Inspection | 3/19/2020 | 3/19/2020 | 3/20/2020 | | CANC |
Tell Riley
|
|
|
|
BLD-Aging Inspection | 10/31/2019 | 10/31/2019 | 11/5/2019 | | PASS |
Tell Riley
|
|
|
Still working on getting approved zoning and plans.....
|
BLD-Aging Inspection | 10/30/2019 | 10/30/2019 | 11/1/2019 | | CANC |
Tell Riley
|
|
|
|
Change Expiration Date Only | | | 10/1/2019 | | DONE |
|
|
|
reissued by mistake on 9/30/19
|
OVERRIDE | | | 9/30/2019 | | |
|
|
|
|
Routing Walk-In (BLD) | 9/30/2019 | 9/30/2019 | 9/30/2019 | P | DONE |
Josh Bogle
|
|
|
submitting additional plans
|
Routing - PLAN CHECK | 9/30/2019 | | 9/30/2019 | | PASS |
Josh Bogle
|
|
|
one hour plan mod fee
|
Case Summary (BLD) | | | 9/30/2019 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 9/30/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 9/30/2019 | | DONE |
Judith Amador
|
|
|
|
Plan resubmittals received | | | 9/11/2019 | | DONE |
|
|
|
paper plans 9 small sheets- site plan, elevation, framing and deck plans put on Josh's desk
|
Routing - PLAN CHECK | 9/11/2019 | | 9/11/2019 | | FAIL |
Josh Bogle
|
|
|
see e-mail to Scott
|
Routing Walk-In (Zoning) | 9/3/2019 | 9/3/2019 | 9/3/2019 | P | PASS |
Ethan Mansfield
|
|
|
plan modification to existing plans.
Discussed plans with Cody Riddle.
|
Routing Walk-In (BLD) | 9/3/2019 | 9/3/2019 | 9/3/2019 | P | FAIL |
Josh Bogle
|
|
|
applicant left paperwork, in file
|
BLD-Conference | 6/20/2019 | 6/20/2019 | 6/20/2019 | P | PEND |
Tell Riley
|
|
|
issued correction notice for property line issue. no work to continue until resolved.
|
BLD-Footing | 6/17/2019 | 6/18/2019 | 6/18/2019 | P | PART |
Tell Riley
|
|
|
Scott @ 208.716.0359//footings located at undisturebed soil level//24x24 footing with rebar// will be installing sono-tube above footings.// footings for interior deck supports only.//
|
BLD-Conference | 6/5/2019 | 6/5/2019 | 6/6/2019 | A | DONE |
Bob Archibald
|
|
|
Issued NOV to obtain required inspections and a Certificate of Completion. Phone conference with owner 6/6/19 project (handrails/guardrails) should be completed by end of July, Electrical inspection scheduled for 6/7/19
|
BLD-Conference | 3/28/2019 | 3/28/2019 | 3/28/2019 | P | DONE |
Jim Sly
|
|
|
|
BLD-Conference | 3/13/2019 | 3/15/2019 | 3/15/2019 | A | DONE |
Jim Sly
|
|
|
Issue CN to complete scope of work on BLD and ELE permits before expiration of permits on 4/26/19. A neighbor will also call prior to inspection to allow access to their rear yard to verify propery pins.
C/N....Complete scope of work and obtain final inspections for BLD18-01475 and ELE18-01587 before expiration of permits on 4/26/19. Call for inspection to verify setbacks for pool as soon as possible. Provide approved plans and locate property lines, prior to inspection. Need to locate original property pins, survey, or find other means to verify property lines.
|
BLD-Conference | 3/7/2019 | 3/7/2019 | 3/8/2019 | P | NR |
Jim Sly
|
|
|
|
Case Summary (BLD) | | | 3/8/2019 | | DONE |
|
|
|
|
BLD-Other | 7/26/2018 | 7/26/2018 | 7/26/2018 | P | DONE |
Jim Sly
|
|
|
as per neighbor-pool is done-water in pool-no barriers around pool-they''re concerned that someone could fall in drown Issued Correction Notice.......Do Not Occupy Pool prior to obtaining a Final and a Certificate Of Compliance.
|
OVERRIDE | | | 4/26/2018 | | |
|
|
|
|
Routing Walk-In (Zoning) | 4/26/2018 | 4/26/2018 | 4/26/2018 | A | PASS |
Jeff Lowe
|
|
|
no ADU propsed or approved with this permit. No kitchen proposed with this permit.
|
Routing Walk-In (BLD) | 4/26/2018 | 4/26/2018 | 4/26/2018 | A | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 4/26/2018 | | 4/26/2018 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 4/26/2018 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 4/26/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 4/26/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/26/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 4/26/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 4/26/2018 | | DONE |
|
|
|
|
CHANGE ISSUED DATE | | | 4/26/2018 | | DONE |
|
|
|
reissued by mistake on 9/30/19
|
Application received | | 4/26/2018 | | | |
|
|
|
|