Second Notice | | 12/24/2018 | 1/8/2019 | | DONE |
|
|
|
mailed 1-11-19
|
First Notice | 11/14/2018 | 11/14/2018 | 12/14/2018 | | DONE |
Brandon Shaw
|
|
|
mailed 12-17
|
BLD-Final | 11/13/2018 | 11/14/2018 | 11/14/2018 | A | PASS |
Brandon Shaw
|
|
|
please call ahead plans are currently located in the drive up and go space left side of the store. ###-####
thanks Mike Teeter Phone #: ###-#### Inspection requested via web by Mike Teeter
|
DOC - Permit Finaled | 11/14/2018 | 11/14/2018 | 11/14/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Framing/Rough-in | 11/9/2018 | 11/13/2018 | 11/13/2018 | A | DONE |
Jim Sly
|
|
|
if you could please give me a call ahead of time that would be great ###-#### thanks. This should be for the Drive up and go Partition wall.
thanks Mike Teeter Inspection requested via web by Mike Teeter WIP
|
Plan assigned to (JG) | 4/26/2018 | 4/26/2018 | 4/26/2018 | | PASS |
Javier Guzman
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/26/2018 | | DONE |
|
|
|
|
Intake Approval | | | 4/26/2018 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 4/26/2018 | | DONE |
Christina Prado
|
|
|
|
Routing - PLAN CHECK | 4/26/2018 | | 4/26/2018 | | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 4/26/2018 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/26/2018 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 4/26/2018 | | DONE |
Javier Guzman
|
|
|
|
Case Summary (BLD) | | | 4/26/2018 | | DONE |
Javier Guzman
|
|
|
|
Permit Ready to Issue | | | 4/26/2018 | | DONE |
Christina Prado
|
|
|
Need:
GC Form - met
Cert of Value from GC for demo fee - met
**Plans on counter, not in drawer**
|
Telephone call | | | 4/26/2018 | | DONE |
Christina Prado
|
|
|
Called LE to advise permit is ready and gave requirements for issuance
|
Issue PAID IN FULL permit | | | 4/26/2018 | | DONE |
|
|
|
|
Application received | | 4/26/2018 | | | |
|
|
|
|