BLD-Final | 9/20/2018 | 9/21/2018 | 9/21/2018 | A | PASS |
Jim Storey
|
|
|
Larry Phone #: ###-#### final ok
|
First Notice | | 10/1/2018 | 9/21/2018 | | DONE |
|
|
|
|
Print Statement | | | 9/21/2018 | | DONE |
|
|
|
|
Permanent Occupancy | | | 9/21/2018 | | DONE |
|
|
|
|
BLD-Final | 9/19/2018 | 9/20/2018 | 9/20/2018 | A | PART |
Jim Storey
|
|
|
Larry Phone #: ###-#### need hardware for sliding door to comply with ada acess.
|
Temporary Occupancy | 9/20/2018 | 12/19/2018 | 9/20/2018 | | DONE |
Tiffany Carson-Herker
|
|
|
|
FIRE-Final Inspection | 9/14/2018 | 9/17/2018 | 9/17/2018 | A | PASS |
Mike Jordan
|
|
|
Larry Phone #: ###-####. Life/safety ok
|
FIRE-Final Inspection | 9/11/2018 | 9/11/2018 | 9/11/2018 | P | FAIL |
Mike Jordan
|
|
|
Larry Phone #: ###-####. Provide current annual inspection fro fire extinguidhers. Provie ADA hardware on sliding doors. Coorection notice issued.
|
CHANGE STATUS TO (ISS) | | | 8/23/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 8/17/2018 | | |
|
|
|
|
Print Occupancy Form | | | 8/17/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 8/17/2018 | | 8/17/2018 | | PASS |
Michael Hanson
|
|
|
Plan mod with engineering for changes. MDH
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/17/2018 | | DONE |
Michael Hanson
|
|
|
Plan mod fee 1 hour. MDH
|
Permit Ready to Issue | | | 8/17/2018 | | DONE |
|
|
|
PLAN MOD
|
Plan Modification Accepted | | | 8/3/2018 | | DONE |
|
|
|
New Exterior door head and jamb installation
|
Plan assigned to (M_H) | 8/3/2018 | | 8/3/2018 | | DONE |
Michael Hanson
|
|
|
|
BLD-Framing/Rough-in | 7/17/2018 | 7/18/2018 | 7/19/2018 | P | PART |
Jim Storey
|
|
|
Larry- prefer late afternoon Phone #: ###-#### c/n to planreview/ walls ok to cover
|
Case Summary (BLD) | | | 6/6/2018 | | DONE |
Michael Hanson
|
|
|
|
Routing - PLAN CHECK | 6/6/2018 | | 6/6/2018 | | PASS |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/6/2018 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 6/6/2018 | | DONE |
|
|
|
Need:
RP
GC form-met
Cert of value from GC-met
|
Print Occupancy Form | | | 6/6/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 6/6/2018 | | DONE |
|
|
|
|
Pending Assignment by CDM | 4/26/2018 | | 6/6/2018 | | PASS |
Carl D Madsen
|
|
|
Plans are missing DR approval letter for the exterior modifications of the storefront, new exterior door and trash enclosure. E-mail sent to the applicant and the architect. 4/30/18 CDM
|
Plan assigned to (M_H) | 5/2/2018 | | 6/6/2018 | | DONE |
Michael Hanson
|
|
|
05/30 Veterinary Wellness Center L-3. 1st review completed - see plan review comments. MDH
|
Plan resubmittals received | | | 6/1/2018 | | DONE |
|
|
|
Two copies of sheet Five. Taken to Michael
|
Route to Impact Fee Review | 5/30/2018 | 6/2/2018 | 5/31/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - FIRE | 5/30/2018 | 5/30/2018 | 5/30/2018 | | PASS |
Erika Akin
|
|
|
Attached comments to case and plans
|
Routing - PLAN CHECK | 5/2/2018 | | 5/30/2018 | | FAIL |
Michael Hanson
|
|
|
Over allowed openings at north wall. MDH
|
1st review completed | | | 5/30/2018 | | FAIL |
Michael Hanson
|
|
|
Over allowed openings at north wall. MDH
|
Routing - MECHANICAL | 5/2/2018 | | 5/10/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 5/10/2018 | | 5/10/2018 | | PASS |
Bill VanDegrift
|
|
|
1) ASSE 1070 mixing valves at the lavs
2) provide a 3" hub drain at the 1 1/2" RP. mount rp over the hub drain.
3) additional cross connection protection ma be required
|
Routing - PLANNING | 5/9/2018 | | 5/9/2018 | | PASS |
David Moser
|
|
|
|
Routing - Erosion and Sediment | 5/2/2018 | | 5/9/2018 | | PASS |
Andy J. Long
|
|
|
ESC plan waiver approved. Project needs certified RP.
|
Routing - Design Review | 5/2/2018 | | 5/9/2018 | | PASS |
Katelyn Menuge
|
|
|
|
Routing PW Street Lights | 5/8/2018 | | 5/9/2018 | | PASS |
Tom Marshall
|
|
|
|
Routing PW Sewer Design | 5/7/2018 | | 5/8/2018 | | PASS |
DeAnn Brown
|
|
|
|
Routing PW Solid Waste | 5/7/2018 | | 5/8/2018 | | PASS |
Evan Carpenter
|
|
|
|
Plan resubmittals received | | | 5/7/2018 | | DONE |
|
|
|
received two copies of plan sheets two & five; taken to Michael Hanson
|
Routing - PUBLIC WORKS | 5/2/2018 | | 5/7/2018 | | PASS |
Rachael Beierle
|
|
|
|
Routing PW Environmental | 5/2/2018 | | 5/4/2018 | | PASS |
Rick Christenson
|
|
|
|
Routing PW Sewer Rating | 5/2/2018 | | 5/2/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing PW Drainage | 5/2/2018 | | 5/2/2018 | | PASS |
Brian Murphy
|
|
|
|
Routing - Addressing | 5/2/2018 | | 5/2/2018 | | PASS |
Doug Chausow
|
|
|
|
Intake Approval | | | 5/2/2018 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/26/2018 | | DONE |
|
|
|
|
Intake Approval | | | 4/26/2018 | | FAIL |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/26/2018 | | DONE |
|
|
|
|
Application received | | 4/26/2018 | | | |
|
|
|
|