Permit Information
Permit NumberBLD18-01491
StatusFinaled
Name PINNACLE BUILDERS INCORPORATED
Site Address 3711 S COUNCIL SPRING RD
Project NameCouncil Springs Apartments
Customer NumberBLD18-03242 CARPORTS
ePlanReviewYes
Description
(COUNCIL SPRINGS APARTMENTS) // 06-03-19 PLAN MOD TO CHANGE DRYERS TO DUCTLESS DRYERS AND ADD WALL GRILLES FOR VENTILATION. JAR // **Permit for the construction of a 3-story 11-unit wood framed apartment building with work to include general site work and construction of the new building per the approved plans. Carport to be constructed under separate permit, BLD18-03242. Special inspections required per attached Form 310. This building is fully fire sprinklered with an NFPA 13-R system as required for residential occupancy and story increase. **JAR**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/2/20201/3/20201/3/2020APASS
DetailsBrandon Shaw
Please call when you are on your way. ###-#### Phone #: ###-#### Inspection requested via web by Mark Roberts
DOC - Permit Finaled1/3/20201/3/20201/3/2020PPASS
DetailsBrandon Shaw
Permanent Occupancy  1/3/2020 DONE
Zoning Approval1/2/20201/2/20201/2/2020 PASS
DetailsKatelyn Menuge
FIRE-Final Inspection11/26/201911/27/201911/27/2019APASS
DetailsJim Page
Fire sprinkler inspection is complete, fire aalrm inspection is complete, fire extinguishers are placed with current inspection tags, knox box is located by the FDC. Final life fire safety inspection for area of work complete, signature card was destroyed, no signatures provided.

Please call when on route. Thank you Phone #: ###-#### Inspection requested via web by Mark Roberts
FIRE-Final Inspection11/19/201911/19/201911/19/2019PFAIL
DetailsJim Page
Site work for fire truck access is not complete, fire truck access must be complete before life fire safety can be signed off per note number 1 of building permit fire code review. Provide signage for fire sprinkler riser room as well as fire alarm control panel per note number 14. Provide address numbers on both east and south sides per boise municipal code 505.3. Fire sprinkler system requires a re-hydro due to the amount of corrections that were made.

Mark - Fire/Life Safety. Working with sprinkler contractor to get inspection for FIR19-00111 this afternoon as well. Phone #: ###-####
FIRE-Final Inspection11/15/201911/18/201911/18/2019ACANC
DetailsTroy Cobbley
Not ready for final due to the project related fire sprinkler permit not being finaled yet. Mark and I did discuss general life safety requirements. It appears the new fire extinguishers need annual inspection. Mark Phone #: ###-####
Print Occupancy Form  11/15/2019 DONE
BLD-Conference11/11/201911/12/201911/12/2019ADONE
DetailsBrandon Shaw
Pre final walk thru...
BLD-Aging Inspection11/12/201911/12/201911/12/2019 DEFR
DetailsBrandon Shaw
Work in progress...
Extend Permit 90/180 days11/12/201911/12/201911/12/2019PDONE
DetailsBrandon Shaw
BLD-Wall cover6/28/20197/1/20197/1/2019APASS
DetailsBrandon Shaw
Need to check that RC channel is approved for cover. Please call me when you''re on your way. Phone #: ###-#### Inspection requested via web by Mark Roberts
BLD-Other6/27/20196/28/20196/28/2019ANR
DetailsTony Young
Need to check that RC channel is approved for cover. Please call me when you''re on your way. Phone #: ###-#### Inspection requested via web by Mark Roberts
BLD-Energy code compliance6/24/20196/25/20196/25/2019APASS
DetailsBrandon Shaw
Corrections SAT...
BLD-Wall cover6/20/20196/21/20196/21/2019AFAIL
DetailsJim Storey
First floor inspection please. Phone #: ###-#### Inspection requested via web by Mark Roberts unable to contact missing rc and fire gyp unusable spaces and line sets not fire chalked/ stair glbs not alowed to bear on concrete.
BLD-Wall cover6/19/20196/20/20196/20/2019APASS
DetailsBrandon Shaw
Second floor only please. Thank you Phone #: ###-#### Inspection requested via web by Mark Roberts
BLD-Energy code compliance6/17/20196/17/20196/17/2019PPART
DetailsBrandon Shaw
Ok to cover...
Plan assigned to (JAR)6/13/20196/13/20196/17/2019 DONE
DetailsJulie Romig
plan mod erroneously assigned to this permit. Should have been assigned to BLD18-3242
CHANGE STATUS TO (ISS)  6/17/2019 DONE
Plan Modification Accepted  6/13/2019 DONE
Mirroring Carports to avoid sewer and water lines. Assigned to this permit in error. Should have been assigned to BLD18-03242.
BLD-Conference6/10/20196/11/20196/11/2019ADONE
DetailsBrandon Shaw
Talked with Brandon, we are planning on meeting onsite at 9 AM. Thank you Phone #: ###-#### Inspection requested via web by Andy Eells
BLD-Framing/Rough-in6/7/20196/10/20196/10/2019ADEFR
DetailsBrandon Shaw
Approved plans are in the riser room Phone #: ###-#### Inspection requested via web by Andy Eells
BLD-Framing/Rough-in6/7/20196/7/20196/7/2019PFAIL
DetailsBrandon Shaw
Need Mech rough-in...
Telephone call  6/6/2019 DONE
called Ward-he was having issues with downloading the approved drawings-he said the down load arrow was not in there but when i went in it was there. He's going to try again and he'll call if he has any more problems
OVERRIDE  6/4/2019  
CHANGE STATUS TO (ISS)  6/4/2019 DONE
Print Occupancy Form  6/4/2019 DONE
Print Occupancy Form  6/4/2019 DONE
Permit Ready to Issue  6/4/2019 DONE
plan mod approved *PLEASE DONT ISSUE PERMIT*
Plan assigned to (JAR)5/24/20195/24/20196/3/2019 DONE
DetailsJulie Romig
1st Rev Comp - Plan Mod Council Springs - HVAC changes
Routing - PLAN CHECK6/3/2019 6/3/2019 PASS
DetailsJulie Romig
2nd Review
Routing - PLAN CHECK5/28/2019 6/1/2019 FAIL
DetailsJulie Romig
Routing - MECHANICAL5/28/2019 5/31/2019 PASS
DetailsTroy James
Pass per ePlan
Plan Modification Accepted  5/24/2019 DONE
Removing dryer vents to go ventless, removing EF in laundry and adding transfer grille between bathroom and laundry
BLD-Conference5/2/20195/2/20195/2/2019PPART
DetailsBrandon Shaw
Pre-framing/ Fire caulking...
BLD-Framing/Rough-in3/28/20193/28/20193/28/2019PPART
DetailsBrandon Shaw
Partial framing inspection
Soffits and stairwells...
BLD-Wall Bracing3/14/20193/15/20193/15/2019APASS
DetailsMike Jordan
Shear inspection. Approved plans are in garage. I would like to meet inspector on site please give me a call ###-#### Phone #: ###-#### Inspection requested via web by Andy Eells. Exterior and interior shear ok.
BLD-Conference1/23/20191/23/20191/23/2019PDONE
DetailsBrandon Shaw
BLD-Footing1/3/20191/3/20191/3/2019PPASS
DetailsBrandon Shaw
Frost protection is required...
BLD-Foundation11/6/201811/7/201811/7/2018APASS
DetailsBrandon Shaw
Jared Draper is concrete guy. Requested 9 am please if possible. 2500 psi concrete spec. Inspection for foundation wall Phone #: ###-#### Inspection requested via web by Andy Eells
BLD-Footing11/2/201811/5/201811/5/2018APASS
DetailsJim Storey
MTI scheduled for bar placement at 10am on the 5th. 2500psi spec mix. Sawtooth L.S staked out building Phone #: ###-#### Inspection requested via web by Andy Eells rebar ok si pending reports
(F) Reprint permit  11/2/2018 DONE
Print Occupancy Form  11/2/2018 DONE
Print Occupancy Form  11/1/2018 DONE
Issue PAID IN FULL permit  11/1/2018 DONE
emailed permits to be signed to trav.pinnaclebuilders@gmail.com-included Brittany's email since I'm off 11/2/18
OVERRIDE  10/24/2018  
Plan assigned to (JAR)6/7/20186/7/201810/24/2018 DONE
DetailsJulie Romig
1st Rev Comp - 6th Rev Comp - 506 Council Springs Apartments
Routing - PLAN CHECK10/24/2018 10/24/2018 PASS
DetailsJulie Romig
PLANS/APPL TAKEN TO FRONT DESK  10/24/2018 DONE
Permit Ready to Issue  10/24/2018 DONE
NEED - ALL MET - email permits to BreeAnn Sjostrom
RP
ACHD
GC FORM
REVISED VALUE
Routing - PLAN CHECK10/15/2018 10/16/2018 FAIL
DetailsJulie Romig
Routing - Design Review10/15/2018 10/15/2018 PASS
Details
Routing PW Sewer Design10/15/2018 10/15/2018 PASS
DetailsDeAnn Brown
Routing Off Site - STRUCTURAL10/6/2018 10/10/2018 PASS
DetailsJulie Romig
5th Review
Routing - PLAN CHECK10/6/2018 10/10/2018 FAIL
DetailsJulie Romig
5th Review. Outstanding corrections required by other departments.
Routing PW Sewer Design10/6/2018 10/9/2018 FAIL
DetailsDeAnn Brown
Both civil site plans and plumbing plans were altered and now the plumbing plan sewer connection location again does not match the civil plan sewer connection. Coordinate and revise either plumbing or civil site plans.
Routing - Design Review10/6/2018 10/8/2018 FAIL
DetailsKatelyn Menuge
Please wait to resubmit until Design Review Approval is issued and drawings have been updated to comply with the conditions.
Routing Off Site - STRUCTURAL9/19/2018 9/28/2018 FAIL
DetailsJulie Romig
4th Review - 1/2 hour review time (KPFF)
Routing - PLAN CHECK9/19/2018 9/28/2018 FAIL
DetailsJulie Romig
Outstanding corrections required by other departments. All building reveiw items resolved.
Routing - MECHANICAL9/19/2018 9/19/2018 PASS
DetailsTroy James
4th Review - Fee Sheet added in ePlan
Routing - PLUMBING9/19/2018 9/19/2018 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Routing - Design Review9/19/2018 9/19/2018 FAIL
DetailsKatelyn Menuge
4th Review - Fee Sheet added in ePlan. See changemarks.
Routing PW Sewer Design9/19/2018 9/19/2018 FAIL
DetailsDeAnn Brown
Changemarks on sheet C2 for labeling existing manhole and removing water coordination with City of Boise note have not been addressed. Revise and resubmit.
Routing Off Site - STRUCTURAL9/5/2018 9/14/2018 FAIL
DetailsJulie Romig
Routing - PLAN CHECK9/5/2018 9/12/2018 FAIL
DetailsJulie Romig
Outstanding corrections required by other departments. All building review items resolved.
Routing - MECHANICAL9/5/2018 9/11/2018 FAIL
DetailsTroy James
Waiting for mechanical engineer to upload new mechanical sheet addressing mechanical ventilation.
Routing - FIRE9/5/20189/5/20189/6/2018 PASS
DetailsErika Akin
Attached revised comments to case
Routing - Design Review9/5/2018 9/5/2018 FAIL
DetailsKatelyn Menuge
Need new Harris Ranch Review Board and Boise Design Review approvals prior to building permit sign-off.
Routing PW Sewer Design9/5/2018 9/5/2018 FAIL
DetailsDeAnn Brown
Revise and resubmit sheet C2. Location of sewer service exit from building is different between the plumbing and civil plans. Sewer service exits building on the south wall on civil plans and exits east wall on plumbing plans. Coordinate and revise location of sewer service. Keynote 14 on sheet C2 states coordination with City of Boise for water meter connection. Suez operates the water service, remove coordination with City of Boise. Label existing sewer manhole as SSMH 667A14.
Routing Off Site - STRUCTURAL8/18/2018 8/29/2018 FAIL
DetailsJulie Romig
Routing - MECHANICAL8/18/2018 8/27/2018 FAIL
DetailsTroy James
Previous correction has not been addressed. Left message with mechanical engineer. Have not received a call back.
Routing - FIRE8/18/20188/18/20188/24/2018 FAIL
DetailsErika Akin
Attached comments to case and emailed architect
Routing - PLAN CHECK8/18/2018 8/24/2018 FAIL
DetailsJulie Romig
Routing - PLUMBING8/18/2018 8/20/2018 PASS
DetailsDaryl Spivey
See redline notes and install per ISPC.
Routing PW Sewer Design8/18/2018 8/20/2018 FAIL
DetailsDeAnn Brown
Revise and resubmit sheet C2. Location of sewer service exit from building is different between the plumbing and civil plans. Sewer service exits building on the south wall on civil plans and exits east wall on plumbing plans. Coordinate and revise location of sewer service. Keynote 14 on sheet C2 states coordination with City of Boise for water meter connection. Suez operates the water service, remove coordination with City of Boise. Label existing sewer manhole as SSMH 667A14.
Routing PW Drainage8/18/2018 8/20/2018 PASS
DetailsBrian Murphy
Routing - Design Review8/18/2018 8/20/2018 FAIL
DetailsKatelyn Menuge
Submittal of written Harris Ranch Review Board approval letter and new Design Review application and approval are required for the design modifications. Pedestrian walkway adjacent to 18 foot long parking stalls shall be a minimum of 8 feet wide. Condenser will require screening.
Route to Impact Fee Review7/27/20187/30/20187/31/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Routing - PLAN CHECK6/7/2018 7/27/2018 FAIL
DetailsJulie Romig
Routing Off Site - STRUCTURAL6/7/2018 7/27/2018 FAIL
DetailsJulie Romig
1st review completed  7/27/2018 FAIL
DetailsJulie Romig
Routing - FIRE6/7/20186/7/20187/19/2018 FAIL
DetailsErika Akin
Attached comments to case and emailed architect and applicant
Routing PW Drainage6/8/2018 6/12/2018 FAIL
DetailsBrian Murphy
PLAN NOTE STATES NOT FOR CONSTRUCTION.
Routing - Addressing6/7/2018 6/12/2018 PASS
DetailsDoug Chausow
Routing - MECHANICAL6/7/2018 6/11/2018 FAIL
DetailsTroy James
Talked to mechanical engineer about the mechanical ventilation requirements.
Routing - PLUMBING6/7/2018 6/11/2018 PASS
DetailsBill VanDegrift
provide information on shutoff valves for the tub and shower valves.ISPC 606.3
Routing - PLANNING6/7/2018 6/8/2018 PASS
DetailsDavid Moser
See DRH17-00003
Routing - PUBLIC WORKS6/7/2018 6/8/2018 PASS
DetailsRachael Beierle
Routing - Erosion and Sediment6/7/2018 6/8/2018 PASS
DetailsAndy J. Long
ESC plan approved. Certified PD & RP designated. Site preparation inspection is required
Routing PW Solid Waste6/8/2018 6/8/2018 PASS
DetailsEvan Carpenter
Routing PW Sewer Design6/8/2018 6/8/2018 FAIL
DetailsDeAnn Brown
Please make changes to sheet C2 according to changemarks in eplanreview.
Routing PW Street Lights6/8/2018 6/8/2018 PASS
DetailsTom Marshall
Routing - Design Review6/7/2018 6/8/2018 FAIL
DetailsKatelyn Menuge
Submittal of written Harris Ranch Review Board approval letter and new Design Review application and approval are required for the design modifications. Pedestrian walkway adjacent to 18 foot long parking stalls shall be a minimum of 8 feet wide. Condenser will require screening.
Intake Approval  6/7/2018 PASS
Plans ACCEPTED BY PLAN TECH  6/7/2018 DONE
Recd Pcfee & Taken To Pln CK  6/7/2018 DONE
Intake Approval  5/29/2018 FAIL
DetailsJavier Guzman
Please provide and upload the following:
• The previous request for owner’s signature on the already filled out and uploaded #310 form returned without the engineer’s stamp and engineers information on the form, please revise so that a one single completed form #310 is signed by the owner, stamped and signed by the Idaho licensed engineer, and is completely filled out (nothing left blank)
• The following plan sheets were previously requested and Not uploaded again, please provide and upload plumbing plan sheets P6 and P7 (P6 = third floor water plan and P7 = Schedules/details), please upload these sheets.
Intake Approval  5/3/2018 FAIL
DetailsJavier Guzman
Please provide and upload the following:
• Please provide owners signature and date on the filled out uploaded form #310
• Structural plan sheets S20, S21, S22, S23 are required to be stamped by an Idaho licensed engineer
• The following plan sheets were previously requested and Not uploaded P6 and P7, please upload these sheets
Intake Approval  5/2/2018 FAIL
DetailsJavier Guzman
Please provide and upload the following:
• Provide A completed form #310 found at our website at https://pds.cityofboise.org/media/104147/final310_special_inspections.pdf
• Provide Erosion & Sediment Control (ESC) Narrative. The Narrative must be designed for the specific project, and be prepared and signed by a plan designer certified by Boise City.
• There are four sheets that need to be uploaded in the landscape horizontal format that have been uploaded in the vertical position (these sheets are 16-100 E-1, 16-100 E-2, 16-100 E-3 and 16-100 E-4) ePlan submittal standards can be found at https://pds.cityofboise.org/media/464072/electronic_standards_full.pdf
• Show Stair details showing tread and riser sizes
• Show carbon monoxide alarm locations
• NO structural “S” sheets have been uploaded, please provide
• Provide an ACCA approved design software analysis output reports (for residential buildings three (3) stories or less where mechanical systems serve individual units) showing compliance with the design requirements of Manual J (load calculations), Manual D (duct systems), and Manual S (equipment selection). Include a duct system layout noting duct sizes, lengths, and termination points with cfm outputs.
• The following plan sheets were Not uploaded A3.1, A5.0, P6 and P7. Please provide
Application received  4/27/2018 DONE
Application submitted via PDS Online on Apr 27 2018 8:41AM
First Notice 1/13/2020   
First Notice1/3/20201/3/2020   
DetailsBrandon Shaw