BLD-Final | 10/10/2018 | 10/11/2018 | 10/11/2018 | A | PASS |
Mike Jordan
|
|
|
Jim-please call for access Phone #: ###-####
|
DOC - Permit Finaled | 10/11/2018 | 10/11/2018 | 10/11/2018 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Other | 8/13/2018 | 8/13/2018 | 8/13/2018 | P | PASS |
Mike Jordan
|
|
|
Fire wall // Call for access ...Jim Phone #: ###-####
|
BLD-Framing/Rough-in | 8/13/2018 | 8/13/2018 | 8/13/2018 | P | PASS |
Mike Jordan
|
|
|
Fire wall // Call for access ...Jim Phone #: ###-####
|
BLD-Framing/Rough-in | 6/11/2018 | 6/12/2018 | 6/12/2018 | A | PART |
Mike Jordan
|
|
|
Call to meet there // Jim Phone #: ###-####
|
BLD-Conference | 6/12/2018 | 6/12/2018 | 6/12/2018 | A | DONE |
Mike Jordan
|
|
|
Call to meet there // Jim Phone #: ###-####. Went over garage/dwelling seperation issues with cabinet and washer box.
|
BLD-Framing/Rough-in | 5/24/2018 | 5/25/2018 | 5/25/2018 | P | FAIL |
Jim Storey
|
|
|
Ray calling for Jim Phone #: ###-#### need hvac sign off// recofiger plm to maintane garage septration/ wrap built in cabnet with gyp// air seal walls
|
Routing Walk-In (BLD) | 4/30/2018 | 4/30/2018 | 4/30/2018 | P | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 4/30/2018 | | 4/30/2018 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 4/30/2018 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 4/30/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 4/30/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/30/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 4/30/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 4/30/2018 | | DONE |
|
|
|
|
Application received | | | 4/29/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 29 2018 5:29PM
|