Permit Information
Permit NumberBLD18-01534
StatusIssued
Name CREATIVE ACCENTS & CONSTRUCTION
Site Address 9226 W BARNES DR
Project NameCalvary Chapel
Customer Number 
ePlanReviewNo
Description
(CALVARY CHAPEL TREASURE VALLEY – MULTI-PURPOSE ASSEMBLY ROOM AND OFFICE SPACE) The fire sprinkler system is used for building area increase. To convert an existing 2,285 square foot shell tenant space to a multi-purpose assembly room and offices to be used by a church. A code compliant means of egress from the common toilet room core area was created under permit BLD18-03509. Work is to include a 102 square foot elevated sound booth area and a 182 square foot elevated stage. Both areas will be elevated 7 inches above the general floor level. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Plan Reviewer's activity  4/13/2020 DONE
Drawings taken to Records
FIRE-Final Inspection11/21/201911/22/201911/22/2019APASS
DetailsTroy Cobbley
Life safety passed.

Dave Phone #: ###-####
FIRE-Final Inspection11/20/201911/21/201911/21/2019AFAIL
DetailsTroy Cobbley
No city approved plans or small documents on site. No inspection performed. David Phone #: ###-####
Meeting  11/20/2019 DONE
fax came in from david requesting the occupancy. called him informing him that he still needs to have the zoning, fire life and building inspections completed
Issue PAID IN FULL permit  10/30/2019 DONE
Print Occupancy Form  10/30/2019 DONE
Telephone call  10/25/2019 DONE
sent an email to dave informing him the gc has not come in to sign for the permit and pick up the plans. permit is now showing to be 2 days past the date
Meeting  9/27/2019 DONE
Dave, with the church, brought paper work in and paid fees. informed him that the GC will need to come in to sign for the permit and pick up the approved plans
Plan assigned to (CJW)5/1/20185/1/20189/23/2019 PASS
DetailsCarl Westfall
(1st done) 05/21/18 (L3 - 15 days) (paper - 1 sheet) Calvary Chapel (waiting for applicant to resolve Planning issues)
PLANS/APPL TAKEN TO FRONT DESK  9/23/2019 DONE
Print Occupancy Form  9/23/2019 DONE
Permit Ready to Issue  9/23/2019 DONE
MET MEMBER OF CHURCH PAID FOR PERMIT
Need
GC Form
Revised Value
MET
ACHD
Telephone call  9/23/2019 DONE
spoke with dave informing him that the permit is ready; told him what else is needed for issuance
Routing - PLANNING9/19/2019 9/19/2019 PASS
DetailsBrent Moore
Determined this was primarily an office use and not a church.
Plan Reviewer's activity  8/16/2019 DONE
DetailsCarl Westfall
The following Email was sent on 8-16-19.

Cathy,

Back on May 7, 2018, Andrea Tuning in Planning noted that a Conditional Use Permit was required for this church use in this zone. She noted that the applicant was contacted. Andrea is in transition to a new position so she is no longer your contact in Planning for this project.

I recommend that you contact Leon Letson in Planning at ###-#### to determine the next steps for getting Planning approval.

I approved the Building Code plan review. Once Planning is satisfied, we will be able to issue a permit. Call me if you have questions. Thanks.

Carl J. Westfall
Boise City IBC Plans Examiner
###-####
Routing - PLAN CHECK8/15/2019 8/16/2019 PASS
DetailsCarl Westfall
Plan resubmittals received  8/15/2019 DONE
Documents received by Email
Plan Reviewer's activity  6/28/2019 DONE
Sent an Email to the Architect asking for more information.
Extend Review Timeline  4/12/2019 DONE
1st extension approved. New exp. date is 4/26/19
Extend Review Timeline  4/12/2019 DONE
2nd extension approved. New exp. date is 10/23/19
Plan Reviewer's activity  4/11/2019 DONE
Got an E-mail from the Architect who plans on requesting two extensions.
Plan Reviewer's activity  4/9/2019 DONE
Telephoned the Architect and also sent an Email asking about the status of this project.
Telephone call  1/7/2019 DONE
Called the Architect and asked for a status report. Left a voice mail message.
Route to Impact Fee Review7/3/20187/6/20187/5/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Plan Reviewer's activity  5/22/2018 DONE
Emailed the architect asking for a status update
Routing - FIRE5/7/20185/7/20185/7/2018 PASS
DetailsErika Akin
Attached comments to case and plans
Routing - PLANNING  5/7/2018 FAIL
DetailsAndrea Tuning
A church use will require a Conditional Use Permit. Contacted the applicant.
1st review completed  5/7/2018 DONE
Plan resubmittals requested  5/5/2018 DONE
Routing - PLAN CHECK5/1/2018 5/5/2018 FAIL
DetailsCarl Westfall
Revised drawings required
Routing - Addressing5/1/2018 5/1/2018 PASS
DetailsDoug Chausow
Plans ACCEPTED BY PLAN TECH  5/1/2018 DONE
Recd Pcfee & Taken To Pln CK  5/1/2018 DONE
Intake Approval  5/1/2018 PASS
per CJW
Zoning Approval11/20/201911/20/2019  PASS
Application received 5/1/2018