BLD-Final | 1/18/2019 | 1/22/2019 | 1/22/2019 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
DOC - Permit Finaled | 1/22/2019 | 1/22/2019 | 1/22/2019 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 1/11/2019 | 1/15/2019 | 1/15/2019 | A | CANC |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 1/11/2019 | 1/11/2019 | 1/11/2019 | P | DONE |
Brandon Shaw
|
|
|
ACH50- 3.83
|
BLD-Final | 1/9/2019 | 1/9/2019 | 1/9/2019 | P | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### >> Inspection requested via web by Kyle Seick Inspection cancelled from web by: Kyle Seick
|
BLD-Final | 1/8/2019 | 1/9/2019 | 1/9/2019 | A | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### >> Inspection requested via web by Kyle Seick Inspection cancelled from web by: Kyle Seick
|
PubWorks Occupancy Approval | 12/26/2018 | 12/26/2018 | 12/26/2018 | | DONE |
Jason C. Taylor
|
|
|
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Energy code compliance | 10/2/2018 | 10/3/2018 | 10/3/2018 | A | PASS |
Brandon Shaw
|
|
|
rolo Phone #: ###-####
|
BLD-Framing/Rough-in | 10/1/2018 | 10/1/2018 | 10/1/2018 | P | PEND |
Brandon Shaw
|
|
|
Pending fire sprinkler approval
|
BLD-Other | 10/1/2018 | 10/1/2018 | 10/1/2018 | P | PASS |
Brandon Shaw
|
|
|
Sofit // Rolo Phone #: ###-####
|
BLD-Wall Bracing | 9/5/2018 | 9/5/2018 | 9/5/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Foundation | 7/6/2018 | 7/6/2018 | 7/6/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Footing | 7/5/2018 | 7/5/2018 | 7/5/2018 | P | PASS |
Brandon Shaw
|
|
|
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
|
PubWorks Subgrade Approval | 7/5/2018 | 7/5/2018 | 7/5/2018 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 7/3/2018 | 7/3/2018 | 7/3/2018 | P | CANC |
Brandon Shaw
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection.
|
Issue PAID IN FULL permit | | | 6/22/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/22/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 6/7/2018 | | |
|
|
|
|
Routing - FIRE | 6/7/2018 | 6/7/2018 | 6/7/2018 | | FAIL |
Tim Frost
|
|
|
Previous comments were not addressed
|
Routing - FIRE | 6/7/2018 | 6/7/2018 | 6/7/2018 | | PASS |
Tim Frost
|
|
|
|
Plan assigned to (RDP) | 5/4/2018 | 5/4/2018 | 6/7/2018 | | DONE |
Rob Patrick
|
|
|
5/23 sfd L2 ePlan...5/14: Failed, structure requires sprinklers
|
Routing - PLAN CHECK | 6/7/2018 | | 6/7/2018 | | PASS |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/7/2018 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 6/7/2018 | | DONE |
|
|
|
met
|
Routing - PLAN CHECK | 6/7/2018 | | 6/7/2018 | | FAIL |
Rob Patrick
|
|
|
Fire Comments were not addressed
|
Routing - PLAN CHECK | 5/4/2018 | | 5/14/2018 | | FAIL |
Rob Patrick
|
|
|
Structure requires sprinkled
|
1st review completed | | | 5/14/2018 | | FAIL |
Rob Patrick
|
|
|
Structure requires sprinkled
|
Route to Impact Fee Review | 5/4/2018 | 5/7/2018 | 5/7/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 5/4/2018 | | 5/7/2018 | | PASS |
Troy James
|
|
|
|
Routing PW Grading-Hillside | 5/4/2018 | | 5/7/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
|
Routing - FIRE | 5/4/2018 | 5/4/2018 | 5/4/2018 | | FAIL |
Tim Frost
|
|
|
Fire sprinklers are required due to access distance of 325'. As an alternative move the house closer to the road or provide a 20' wide concrete driveway capable of supporting 75000 pounds. Please, revise the drawing and choose an option.
|
Routing - Erosion and Sediment | 5/4/2018 | | 5/4/2018 | | PASS |
Andy J. Long
|
|
|
ESC plan approved. Certified RP and PD. Site preparation inspection required.
|
Routing - Addressing | 5/4/2018 | | 5/4/2018 | | PASS |
Doug Chausow
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/4/2018 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/4/2018 | | DONE |
|
|
|
|
Intake Approval | | | 5/4/2018 | | PASS |
Candy A. Nichols
|
|
|
|
Routing - PLANNING | 5/4/2018 | | 5/4/2018 | | PASS |
Jeff Lowe
|
|
|
|
Routing - PUBLIC WORKS | 5/4/2018 | | 5/4/2018 | | PASS |
Rachael Beierle
|
|
|
|
Application received | | | 5/1/2018 | | DONE |
|
|
|
Application submitted via PDS Online on May 1 2018 5:25PM
|