BLD-Aging Inspection | 6/21/2019 | 6/21/2019 | 6/21/2019 | | DONE |
Tell Riley
|
|
|
|
BLD-Aging Inspection | 6/20/2019 | 6/20/2019 | 6/20/2019 | | DONE |
Tell Riley
|
|
|
Expires: 08/05/19
|
BLD-Conference | 2/7/2019 | 2/7/2019 | 2/7/2019 | P | CANC |
Jim Sly
|
|
|
|
BLD-Aging Inspection | 1/30/2019 | 1/30/2019 | 2/7/2019 | | CANC |
Jim Sly
|
|
|
|
CHANGE STATUS TO (ISS) | | | 2/7/2019 | | DONE |
|
|
|
as per Jim Sly change status-was doc finaled by mistake
|
BLD-Aging Inspection | 1/29/2019 | 1/29/2019 | 2/6/2019 | | PASS |
Jim Sly
|
|
|
|
DOC - Permit Finaled | 2/6/2019 | 2/6/2019 | 2/6/2019 | P | PASS |
Jim Sly
|
|
|
|
BLD-Framing/Rough-in | 9/17/2018 | 9/17/2018 | 9/17/2018 | P | PASS |
Jim Sly
|
|
|
Rick Phone #: ###-####
|
BLD-Wall Bracing | 9/17/2018 | 9/17/2018 | 9/17/2018 | P | PASS |
Jim Sly
|
|
|
Rick Phone #: ###-####
|
BLD-Foundation | 8/17/2018 | 8/20/2018 | 8/20/2018 | A | PASS |
Jim Sly
|
|
|
Mike Phone #: ###-####
|
BLD-Footing | 8/15/2018 | 8/16/2018 | 8/16/2018 | A | PASS |
Jim Sly
|
|
|
Robert Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 7/20/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 7/19/2018 | | |
|
|
|
|
Telephone call | | | 7/19/2018 | | DONE |
|
|
|
Called Rick to advise permit is ready for pick up
|
Case Summary (BLD) | | | 7/19/2018 | | DONE |
Brian McGowan
|
|
|
Reprinted to alter value as requested by applicant
|
Inspection Record Card- Bld | | | 7/19/2018 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 7/19/2018 | | DONE |
|
|
|
All requirements met
**DO NOT RE-ISSUE, No fees due, value reduced**
|
Routing Walk-In (Zoning) | 7/17/2018 | 7/17/2018 | 7/18/2018 | A | DONE |
Brian McGowan
|
|
|
|
Plan assigned to (BJM) | 7/17/2018 | 7/17/2018 | 7/18/2018 | | DONE |
Brian McGowan
|
|
|
07/20 sfd resubmittal
|
Routing - PLAN CHECK | 7/17/2018 | | 7/18/2018 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 7/18/2018 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 7/18/2018 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLANNING | 7/17/2018 | | 7/17/2018 | | PASS |
Sue Cummings
|
|
|
|
Plan Modification Accepted | | | 7/17/2018 | | DONE |
|
|
|
downsizing addition, Two copes of each A1.0, A1.1, A2.0, A3.0, A4.0 and A5.0. Stamped and taken to BJM.
|
OVERRIDE | | | 5/2/2018 | | |
|
|
|
|
Routing Walk-In (Zoning) | 5/2/2018 | 5/2/2018 | 5/2/2018 | A | PASS |
Nicolette Womack
|
|
|
|
Routing Walk-In (BLD) | 5/2/2018 | 5/2/2018 | 5/2/2018 | A | DONE |
Brian McGowan
|
|
|
|
1st review completed | | | 5/2/2018 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 5/2/2018 | | 5/2/2018 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 5/2/2018 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 5/2/2018 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/2/2018 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 5/2/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 5/2/2018 | | DONE |
|
|
|
|
Application received | | 5/2/2018 | | | |
|
|
|
|