Third Notice | | 9/15/2018 | 10/11/2018 | | DONE |
|
|
|
mailed 10-12-18
|
Third Notice | | 8/13/2018 | 9/10/2018 | | DONE |
|
|
|
mailed 9-11-18
|
Second Notice | | 7/20/2018 | 8/8/2018 | | DONE |
|
|
|
mailed 8-10-18
|
First Notice | 6/25/2018 | 6/25/2018 | 7/10/2018 | | DONE |
Brandon Shaw
|
|
|
MAILED 7-11-18
|
BLD-Final | 6/22/2018 | 6/25/2018 | 6/25/2018 | P | PASS |
Brandon Shaw
|
|
|
Patrick Phone #: ###-####
|
DOC - Permit Finaled | 6/25/2018 | 6/25/2018 | 6/25/2018 | P | PASS |
Brandon Shaw
|
|
|
|
Permanent Occupancy | | | 6/25/2018 | | DONE |
|
|
|
|
BLD-Final | 6/5/2018 | 6/6/2018 | 6/6/2018 | P | PART |
Dave Hannah
|
|
|
Patrick Phone #: ###-#### k for temp occ oko go perm occ after plumging gos perm
|
FIRE-Final Inspection | 6/5/2018 | 6/6/2018 | 6/6/2018 | A | PASS |
Jim Page
|
|
|
Previously noted items have been completed, no fire sprinklers, no fire alarms, fire extinguishers are in place with current inspection tags. Final life fire safety inspection complete.
requests 10-12 inspection - Patrick Phone #: ###-####
|
Temporary Occupancy | 6/6/2018 | 9/4/2018 | 6/6/2018 | | DONE |
Tiffany Carson-Herker
|
|
|
|
FIRE-Final Inspection | 6/1/2018 | 6/4/2018 | 6/4/2018 | A | FAIL |
Jim Page
|
|
|
Provides exit discharge emergency lighting. Remove slide bolt locks on one of the double doors on the main entry and provide either single action door hardware or a double-key deadbolt assembly. Storage must be kept 24 inches down from ceiling in non-sprinklered buildings per IFC.
Patrick Phone #: ###-####
|
Issue PAID IN FULL permit | | | 5/21/2018 | | DONE |
|
|
|
|
Route to Impact Fee Review | 5/17/2018 | 5/20/2018 | 5/18/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Plan assigned to (BJM) | | 5/2/2018 | 5/18/2018 | | DONE |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 5/18/2018 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/18/2018 | | DONE |
Brian McGowan
|
|
|
|
Print Occupancy Form | | | 5/18/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/18/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/18/2018 | | DONE |
Christina Prado
|
|
|
Need
GC form - met
if app is not the GC then we need the rev cert of val - met
|
Telephone call | | | 5/18/2018 | | DONE |
|
|
|
called Patrick Gaasch and left vm permit is ready. Need GC form and Cert of value from GC.
|
Routing - FIRE | 5/17/2018 | 5/17/2018 | 5/17/2018 | | PASS |
Erika Akin
|
|
|
Attached comments to case and plans
|
1st review completed | | | 5/17/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/8/2018 | | 5/17/2018 | | PASS |
Brian McGowan
|
|
|
|
Routing - MECHANICAL | | | 5/8/2018 | | PASS |
Troy James
|
|
|
|
Routing - Design Review | 5/4/2018 | | 5/7/2018 | | PASS |
KayCee Babb
|
|
|
XREF CZC18-00120
|
Routing - PUBLIC WORKS | | | 5/7/2018 | | PASS |
|
|
|
|
Routing PW Environmental | 5/3/2018 | | 5/4/2018 | | PASS |
Rick Christenson
|
|
|
Current Exterior Grease Interceptor is listed as 1500 Gallon. Ok with current grease abatement for facility.
|
Routing - Addressing | 5/2/2018 | | 5/3/2018 | | PASS |
Doug Chausow
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/2/2018 | | DONE |
|
|
|
|
Intake Approval | | | 5/2/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/2/2018 | | DONE |
|
|
|
|
Application received | | 5/2/2018 | | | |
|
|
|
|