Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD18-01568
StatusFinaled
Name HHS CONSTRUCTION LLC
Site Address 2876 S GREBE PL
Project NameHN 74-1 Ponderosa
Customer Number 
ePlanReviewYes
Description
W.U.I. Foothills Zone A. Class A Roof Required. Permit for the construction of a new 3415 sq. ft., two story (first story 1748 sq. ft., second story 1667 sq. ft.) single family dwelling with 3 bedrooms, 3.5 bathrooms, approximately 349 sq. ft. of covered patio/porch and a 920 sq. ft. attached garage per the approved plans, plan review report and any notations. Prescriptive Energy Compliance. SP-01 zoning and setbacks per planning. ***RDP***


A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call 208-608-7070 to schedule an inspection.


Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/3/201812/4/201812/4/2018APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Kyle Seick
DOC - Permit Finaled12/4/201812/4/201812/4/2018PPASS
DetailsBrandon Shaw
BLD-Blower Door Test Results12/4/201812/4/201812/4/2018PDONE
DetailsBrandon Shaw
ACH50- 3.92
PubWorks Occupancy Approval12/3/201812/3/201812/3/2018 DONE
DetailsMelissa Jannusch
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
BLD-Energy code compliance9/4/20189/5/20189/5/2018APASS
DetailsBrandon Shaw
Corrections SAT...
BLD-Framing/Rough-in8/29/20188/30/20188/31/2018AFAIL
DetailsBrandon Shaw
Shear straps and hold downs to be as per plans...
2 2x8 header reqired at interior bearing wall...
Fire block chase's- window well up stairs, front bedroom, plumbing chase, master bedroom...
OK to insulate
BLD-Other8/30/20188/30/20188/30/2018PPASS
DetailsBrandon Shaw
Rollo Phone #: ###-####
BLD-Wall cover8/8/20188/8/20188/8/2018PPART
DetailsBrandon Shaw
Work in progress-
Hold downs straps, and brackets to be installed as per plans and manufactures installation instructions
See plans and red paint
BLD-Wall Bracing8/6/20188/7/20188/7/2018ANR
DetailsBrandon Shaw
No plans
No access to 2nd story
BLD-Foundation6/21/20186/22/20186/21/2018APASS
DetailsBrandon Shaw
Work in progress
BLD-Footing6/20/20186/20/20186/20/2018PPASS
DetailsBrandon Shaw
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
PubWorks Subgrade Approval6/14/20186/14/20186/14/2018 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

Routing - PLAN CHECK6/5/2018 6/5/2018 PASS
DetailsRob Patrick
Issue PAID IN FULL permit  6/5/2018 DONE
Inspection Record Card- Bld  6/5/2018 DONE
OVERRIDE  6/4/2018  
Plan assigned to (RDP)5/4/20185/4/20186/4/2018 DONE
DetailsRob Patrick
5/23 sfd L2 ePlan...5/18: Failed pending satisfaction of Public Works comment
PLANS/APPL TAKEN TO FRONT DESK  6/4/2018 DONE
DetailsRob Patrick
Permit Ready to Issue  6/4/2018 DONE
Routing PW Grading-Hillside6/1/2018 6/1/2018 PASS
DetailsMelissa Jannusch

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
1st review completed  5/18/2018 FAIL
DetailsRob Patrick
5/18: Failed pending satisfaction of Public Works comment.
Routing - PLAN CHECK5/4/2018 5/18/2018 FAIL
DetailsRob Patrick
5/18: Failed pending satisfaction of Public Works comment
Route to Impact Fee Review5/4/20185/7/20185/7/2018 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - FIRE5/4/20185/4/20185/7/2018 PASS
DetailsTim Frost
5/23 house ePlan
Routing - PUBLIC WORKS5/4/2018 5/7/2018 PASS
DetailsMorgan Webb
Routing PW Grading-Hillside5/7/2018 5/7/2018 FAIL
DetailsMelissa Jannusch
Revisions requested to the geotechnical report. see changemarks
Routing - Addressing5/4/2018 5/7/2018 PASS
DetailsDoug Chausow
Routing - Erosion and Sediment5/4/2018 5/7/2018 PASS
DetailsMichael Zawacki
Harris North foothills home. Site prep inspection required.
Routing - MECHANICAL5/4/2018 5/7/2018 PASS
DetailsTroy James
Routing - PLANNING5/4/2018 5/4/2018 PASS
DetailsJeff Lowe
Plans ACCEPTED BY PLAN TECH  5/4/2018 DONE
Intake Approval  5/4/2018 PASS
Recd Pcfee & Taken To Pln CK  5/4/2018 DONE
Application received  5/3/2018 DONE
Application submitted via PDS Online on May 3 2018 11:53AM
Intake Approval  5/3/2018 FAIL
MISSING
1)Cross section
2)Building section
3)need to rotate grading plan
4)Stairway detail
Intake Approval  5/3/2018 FAIL
MISSING
1)Cross section
2)Building section
3)Stairway detail