BLD-Final | 12/3/2018 | 12/4/2018 | 12/4/2018 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
DOC - Permit Finaled | 12/4/2018 | 12/4/2018 | 12/4/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 12/4/2018 | 12/4/2018 | 12/4/2018 | P | DONE |
Brandon Shaw
|
|
|
ACH50- 3.92
|
PubWorks Occupancy Approval | 12/3/2018 | 12/3/2018 | 12/3/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Energy code compliance | 9/4/2018 | 9/5/2018 | 9/5/2018 | A | PASS |
Brandon Shaw
|
|
|
Corrections SAT...
|
BLD-Framing/Rough-in | 8/29/2018 | 8/30/2018 | 8/31/2018 | A | FAIL |
Brandon Shaw
|
|
|
Shear straps and hold downs to be as per plans... 2 2x8 header reqired at interior bearing wall... Fire block chase's- window well up stairs, front bedroom, plumbing chase, master bedroom... OK to insulate
|
BLD-Other | 8/30/2018 | 8/30/2018 | 8/30/2018 | P | PASS |
Brandon Shaw
|
|
|
Rollo Phone #: ###-####
|
BLD-Wall cover | 8/8/2018 | 8/8/2018 | 8/8/2018 | P | PART |
Brandon Shaw
|
|
|
Work in progress- Hold downs straps, and brackets to be installed as per plans and manufactures installation instructions See plans and red paint
|
BLD-Wall Bracing | 8/6/2018 | 8/7/2018 | 8/7/2018 | A | NR |
Brandon Shaw
|
|
|
No plans No access to 2nd story
|
BLD-Foundation | 6/21/2018 | 6/22/2018 | 6/21/2018 | A | PASS |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Footing | 6/20/2018 | 6/20/2018 | 6/20/2018 | P | PASS |
Brandon Shaw
|
|
|
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
|
PubWorks Subgrade Approval | 6/14/2018 | 6/14/2018 | 6/14/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Routing - PLAN CHECK | 6/5/2018 | | 6/5/2018 | | PASS |
Rob Patrick
|
|
|
|
Issue PAID IN FULL permit | | | 6/5/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/5/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 6/4/2018 | | |
|
|
|
|
Plan assigned to (RDP) | 5/4/2018 | 5/4/2018 | 6/4/2018 | | DONE |
Rob Patrick
|
|
|
5/23 sfd L2 ePlan...5/18: Failed pending satisfaction of Public Works comment
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/4/2018 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 6/4/2018 | | DONE |
|
|
|
|
Routing PW Grading-Hillside | 6/1/2018 | | 6/1/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
|
1st review completed | | | 5/18/2018 | | FAIL |
Rob Patrick
|
|
|
5/18: Failed pending satisfaction of Public Works comment.
|
Routing - PLAN CHECK | 5/4/2018 | | 5/18/2018 | | FAIL |
Rob Patrick
|
|
|
5/18: Failed pending satisfaction of Public Works comment
|
Route to Impact Fee Review | 5/4/2018 | 5/7/2018 | 5/7/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - FIRE | 5/4/2018 | 5/4/2018 | 5/7/2018 | | PASS |
Tim Frost
|
|
|
5/23 house ePlan
|
Routing - PUBLIC WORKS | 5/4/2018 | | 5/7/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing PW Grading-Hillside | 5/7/2018 | | 5/7/2018 | | FAIL |
Melissa Jannusch
|
|
|
Revisions requested to the geotechnical report. see changemarks
|
Routing - Addressing | 5/4/2018 | | 5/7/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - Erosion and Sediment | 5/4/2018 | | 5/7/2018 | | PASS |
Michael Zawacki
|
|
|
Harris North foothills home. Site prep inspection required.
|
Routing - MECHANICAL | 5/4/2018 | | 5/7/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 5/4/2018 | | 5/4/2018 | | PASS |
Jeff Lowe
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/4/2018 | | DONE |
|
|
|
|
Intake Approval | | | 5/4/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/4/2018 | | DONE |
|
|
|
|
Application received | | | 5/3/2018 | | DONE |
|
|
|
Application submitted via PDS Online on May 3 2018 11:53AM
|
Intake Approval | | | 5/3/2018 | | FAIL |
|
|
|
MISSING
1)Cross section
2)Building section
3)need to rotate grading plan
4)Stairway detail
|
Intake Approval | | | 5/3/2018 | | FAIL |
|
|
|
MISSING
1)Cross section
2)Building section
3)Stairway detail
|