BLD-Final | 6/11/2018 | 6/11/2018 | 6/11/2018 | P | PASS |
Mike Jordan
|
|
|
Steve Phone #: ###-####
|
DOC - Permit Finaled | 6/11/2018 | 6/11/2018 | 6/11/2018 | P | PASS |
Mike Jordan
|
|
|
|
OVERRIDE | | | 5/9/2018 | | |
|
|
|
|
Routing Walk-In (BLD) | 5/9/2018 | 5/9/2018 | 5/9/2018 | A | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 5/9/2018 | | 5/9/2018 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 5/9/2018 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 5/9/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 5/9/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/9/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 5/9/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 5/9/2018 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 5/3/2018 | 5/3/2018 | 5/3/2018 | P | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 5/3/2018 | 5/3/2018 | 5/3/2018 | P | FAIL |
Michael Hanson
|
|
|
Engineerd stamped documents for entire structure show 2012 IRC . Structure must be engineered to the currect 2015 IRC. MDH
|
Application received | | 5/3/2018 | | | |
|
|
|
|