Permit Information
Permit NumberBLD18-01587
StatusFinaled
Name BRYANTS CONSTRUCTION
Site Address 2675 E WARM SPRINGS AVE
Project NameEaton pergola
Customer Number 
ePlanReviewNo
Description
Permit to build a +/-512sq' stone & timber pergola. Structure is 16"x16" CMU columns on 63"x63"x16" footings. CMU screenwall is on 3'x1' footings. All work per plans, engineering, local codes & ordinances. Separate electrical permit required. **JAB**
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/2/20191/7/20191/7/2019APASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by anthony bryant
DOC - Permit Finaled1/7/20191/7/20191/7/2019PPASS
DetailsDave Hannah
BLD-Footing9/21/20189/21/20189/24/2018PPEND
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by anthony bryant
Issue PAID IN FULL permit  9/14/2018 DONE
OVERRIDE  9/12/2018  
Plan assigned to (JAB) Josh9/7/20189/7/20189/12/2018 PASS
DetailsJosh Bogle
resubmitted for pergola total new design. routed to floodplain, planning, plan check
Routing - PLAN CHECK9/10/2018 9/12/2018 PASS
DetailsJosh Bogle
Inspection Record Card- Bld  9/12/2018 DONE
DetailsJosh Bogle
Case Summary (BLD)  9/12/2018 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  9/12/2018 DONE
DetailsJosh Bogle
Permit Ready to Issue  9/12/2018 DONE
Need
RP
Telephone call  9/12/2018 DONE
Called Anthony to advise permit is ready pending RP and gave fees due
Routing PW Flood Plain9/7/2018 9/10/2018 PASS
DetailsJason C. Taylor
Routing - PLANNING  9/10/2018 PASS
Cover patio outside of floodway and behind exiting house.
Plan assigned to (JAB) Josh5/14/20185/14/20188/21/2018 DONE
DetailsJosh Bogle
1st done - applicant took application & plans, no plans on file
Routing Walk-In (Zoning)5/15/20185/15/20185/15/2018AFAIL
DetailsJosh Bogle
Waiting for a Hal decision. Please reroute to Planning tommorrw
Routing Walk-In (BLD)5/15/20185/15/20185/15/2018AFAIL
DetailsJosh Bogle
1st review completed  5/15/2018 FAIL
DetailsJosh Bogle
Routing - PLAN CHECK  5/15/2018 FAIL
DetailsJosh Bogle
needs engineering for lateral
Routing Walk-In PW FloodPlain5/14/20185/14/20185/14/2018APASS
DetailsJason C. Taylor
Plans revised to show project outside floodway. Structure is floodproofed with masonry columns. Jason Taylor ###-####
Routing PW Flood Plain5/9/2018 5/10/2018 FAIL
DetailsJason C. Taylor
A portion of the subject property is within the regulatory floodplain/Floodway. This project must comply with the Boise Floodplain Ordinance (B.C.C. 11-08). If you have any questions, please call Jason Taylor at ###-####.
Plans ACCEPTED BY PLAN TECH  5/9/2018 DONE
took in plans to route to floodplain per JCT
Routing Walk-In (Zoning)5/4/20185/4/20185/4/2018PCANC
DetailsJosh Bogle
no contact with applicant
Application received 5/4/2018   
Routing - PLANNING5/14/2018   FAIL
Project inside the bald eagle setback. Site plans don't match.