Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberBLD18-01609
StatusFinaled
Name DOUG LASHER CONSTRUCTION
Site Address 3356 E HEARTLEAF DR
Project NameSuperior ridge L33 B1
Customer Number 
ePlanReviewNo
Description
***Prescriptive component energy approach*** Permit for the construction of a new 3053 sq. ft., two story (first story 2057 sq. ft., second story 996 sq. ft.) single family dwelling with 4 bedrooms, 3.5 bathrooms, approximately 240 sq. ft. of covered patio/porch and a 1357 sq. ft. attached garage per the approved plans and any notations. R-1C zoning and setbacks per planning. MDH

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call 208-608-7070 to schedule an inspection.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/5/201812/5/201812/5/2018PPASS
DetailsJim Storey
Garage code is 1905 Phone #: ###-#### Inspection requested via web by bryan murdoch
DOC - Permit Finaled12/5/201812/5/201812/5/2018PPASS
DetailsJim Storey
BLD-Energy code compliance9/13/20189/13/20189/13/2018PPASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by bryan murdoch
BLD-Framing/Rough-in9/10/20189/10/20189/10/2018PPASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by bryan murdoch
BLD-Wall Bracing9/10/20189/10/20189/10/2018PPASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by bryan murdoch
BLD-Foundation6/11/20186/12/20186/12/2018PPASS
DetailsJim Storey
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo Lira
BLD-Footing6/6/20186/7/20186/7/2018PPASS
DetailsJim Storey
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo Lira back ft pads to be placed with walls.
BLD-Footing6/5/20186/6/20186/6/2018PNR
DetailsJim Storey
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo Lira
PubWorks Subgrade Approval6/5/20186/5/20186/5/2018 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####
OVERRIDE  6/1/2018  
Issue PAID IN FULL permit  6/1/2018 DONE
Inspection Record Card- Bld  6/1/2018 DONE
Permit Ready to Issue  6/1/2018 DONE
Routing - PUBLIC WORKS5/30/2018 6/1/2018 PASS
DetailsMorgan Webb
Inspection Record Card- Bld  5/30/2018 DONE
Case Summary (BLD)  5/30/2018 DONE
DetailsMichael Hanson
PLANS/APPL TAKEN TO FRONT DESK  5/30/2018 DONE
DetailsMichael Hanson
Inspection Record Card- Bld  5/30/2018 DONE
Plan assigned to (M_H)5/7/2018 5/30/2018 DONE
DetailsMichael Hanson
05/24 sfd L2 paper. 1st review completed - See comments from mechanical and PW-hillside. MDH
Routing - PLAN CHECK  5/30/2018 PASS
DetailsMichael Hanson
Routing PW Grading-Hillside5/25/2018 5/25/2018 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
Plan Reviewer's activity  5/21/2018 DONE
DetailsMichael Hanson
1st review completed  5/21/2018 FAIL
DetailsMichael Hanson
See comments from mechanical and PW-hillside. MDH
Routing - MECHANICAL5/17/2018 5/17/2018 PASS
DetailsTroy James
Routing - FIRE 5/7/20185/16/2018 PASS
DetailsTim Frost
5/24 house eplan
Routing - MECHANICAL5/11/2018 5/16/2018 FAIL
DetailsTroy James
emailed corrections
Routing - Erosion and Sediment5/16/2018 5/16/2018 PASS
DetailsMichael Zawacki
Precautions needed to prevent backfill from spilling over into neighboring lots. If additional BMPs used please update site map.
Plan resubmittals received  5/15/2018 DONE
two copies of geotechnical recommendation report, stamped and taken plan reviewer
Routing - PUBLIC WORKS5/10/2018 5/11/2018 FAIL
DetailsMorgan Webb
SEE HILLSIDE FOR FAIL.
Routing - PLANNING5/11/2018 5/11/2018 PASS
DetailsSue Cummings
Routing PW Grading-Hillside5/8/2018 5/10/2018 FAIL
DetailsMelissa Jannusch
Foundation drains required
Route to Impact Fee Review5/7/20185/10/20185/8/2018 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing PW Sewer Rating5/8/2018 5/8/2018 PASS
DetailsMorgan Webb
Routing - Addressing5/7/2018 5/8/2018 PASS
DetailsDoug Chausow
Plans ACCEPTED BY PLAN TECH  5/7/2018 DONE
Intake Approval  5/7/2018 PASS
Recd Pcfee & Taken To Pln CK  5/7/2018 DONE
Application received 5/7/2018