Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD18-01612
StatusFinaled
Name BLUE RAVEN SOLAR LLC
Site Address 2108 W CATALDO DR
Project NameMatthew Curtis PV
Customer Number 
ePlanReviewYes
Description
Permit for 402sq' of roof-mounted, grid-tied Photo-voltaic panels with optimizers; 23 panels in 2 arrays tying into a SquareD panel. There will be collar-tie work to strengthen the existing roof structure per engineer’s roof evaluation. All work per plans, engineering, manufacturer’s specs, & local code. Separate electrical permit required. **JAB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled6/22/20186/22/20186/22/2018APASS
DetailsJim Storey
ok per revised engineering sent to planreviewer
BLD-Final6/20/20186/20/20186/20/2018PFAIL
DetailsJim Storey
2:30 appt. no roof modifacation done per engineering.
BLD-Final6/15/20186/19/20186/20/2018PFAIL
DetailsJim Storey
Full packet labelled as-built, but they are original plans. Phone #: ###-#### Inspection requested via web by BRS Permitting no roof modifacation done per engineering.
BLD-Final6/13/20186/14/20186/14/2018PFAIL
DetailsJim Storey
Matthew Curtis, homeowner: ###-#### Phone #: ###-#### Inspection requested via web by BRS Permitting need engineering on site for roof collor ties to insp.
BLD-Final6/7/20186/8/20186/8/2018PNR
DetailsJim Storey
Matthew Curtis, homeowner: ###-#### Phone #: ###-#### Inspection requested via web by BRS Permitting
Place hold on job5/17/2018 5/24/2018 DONE
DetailsTisha Gallop
need signed permit
Issue PAID IN FULL permit  5/16/2018 DONE
Plan assigned to (JAB) Josh5/15/20185/15/20185/15/2018 PASS
DetailsJosh Bogle
due 5/21 - PV
Routing - PLAN CHECK5/15/2018 5/15/2018 PASS
DetailsJosh Bogle
Routing - PLANNING5/15/2018 5/15/2018 PASS
DetailsSue Cummings
1st review completed  5/15/2018 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  5/15/2018 DONE
DetailsJosh Bogle
Energy no - ESC no
Permit Ready to Issue  5/15/2018 DONE
Plans ACCEPTED BY PLAN TECH  5/15/2018 DONE
Recd Pcfee & Taken To Pln CK  5/15/2018 DONE
no fee taken at intake,406
Intake Approval  5/15/2018 PASS
Application received  5/7/2018 DONE
Application submitted via PDS Online on May 7 2018 4:07PM
Intake Approval  5/7/2018 FAIL
Documents are uploaded in wrong folder