BLD-Final | 11/19/2018 | 11/20/2018 | 11/20/2018 | A | PASS |
Tony Young
|
|
|
Todd Phone #: ###-####
|
DOC - Permit Finaled | 11/20/2018 | 11/20/2018 | 11/20/2018 | P | PASS |
Tony Young
|
|
|
|
BLD-Blower Door Test Results | 11/16/2018 | 11/19/2018 | 11/20/2018 | A | DONE |
Tony Young
|
|
|
Todd Phone #: ###-####/// 4.1
|
BLD-Final | 11/16/2018 | 11/19/2018 | 11/19/2018 | A | PASS |
Tony Young
|
|
|
Todd Phone #: ###-####,, ok after blower door results
|
BLD-Framing/Rough-in | 11/16/2018 | 11/16/2018 | 11/16/2018 | P | PASS |
Tony Young
|
|
|
Todd Phone #: ###-####,, soffits ok
|
PubWorks Occupancy Approval | 11/16/2018 | 11/16/2018 | 11/16/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Energy code compliance | 10/2/2018 | 10/2/2018 | 10/2/2018 | P | PASS |
Dave Hannah
|
|
|
Bobby Phone #: ###-####
|
BLD-Framing/Rough-in | 9/28/2018 | 10/1/2018 | 10/1/2018 | A | PASS |
Dave Hannah
|
|
|
Bobby Phone #: ###-####
|
BLD-Framing/Rough-in | 9/27/2018 | 9/27/2018 | 9/27/2018 | P | NR |
Jim Storey
|
|
|
Bobby Phone #: ###-####
|
OVERRIDE | | | 8/7/2018 | | |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 8/7/2018 | | DONE |
|
|
|
Had to add Ready to Issue, activity added to change back
|
BLD-Foundation | 7/24/2018 | 7/24/2018 | 7/24/2018 | P | PASS |
Dave Hannah
|
|
|
Ryan Phone #: ###-####
|
BLD-Footing | 7/16/2018 | 7/17/2018 | 7/17/2018 | A | PASS |
Tony Young
|
|
|
Ryan Phone #: ###-####
|
BLD-Foundation | 7/16/2018 | 7/16/2018 | 7/16/2018 | P | NR |
Tony Young
|
|
|
Ryan Phone #: ###-####,, needs soils approval,,
|
PubWorks Subgrade Approval | 7/16/2018 | 7/16/2018 | 7/16/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Plan assigned to (RDP) | 6/4/2018 | 6/4/2018 | 7/2/2018 | | DONE |
Rob Patrick
|
|
|
6/21 sfd L2 ePlan...6/21 Failed; Corrections Required
|
Routing - PLAN CHECK | 7/2/2018 | | 7/2/2018 | | PASS |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/2/2018 | | DONE |
Rob Patrick
|
|
|
|
Issue PAID IN FULL permit | | | 7/2/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/2/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/2/2018 | | DONE |
|
|
|
|
Routing PW Grading-Hillside | 6/28/2018 | | 6/28/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
|
Routing - FIRE | 6/26/2018 | 6/26/2018 | 6/26/2018 | | PASS |
Tim Frost
|
|
|
|
1st review completed | | | 6/21/2018 | | FAIL |
Rob Patrick
|
|
|
|
Routing - PLAN CHECK | 6/4/2018 | | 6/21/2018 | | FAIL |
Rob Patrick
|
|
|
|
Routing - PLANNING | 6/4/2018 | | 6/12/2018 | | PASS |
Celine Acord
|
|
|
per CFH18-00050
|
Route to Impact Fee Review | 6/4/2018 | 6/7/2018 | 6/5/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - FIRE | 6/4/2018 | 6/4/2018 | 6/5/2018 | | FAIL |
Tim Frost
|
|
|
6/21 New SFH R3 ePlan
Fire sprinklers are required for this subdivision (Sherman Hollow) by the Boise City Fire Department per a memo dated 11-29-2007 from the then current fire marshal. Presumably due to being within the WUI zone
Please, add a note to this drawing indicating fire sprinklers will be provided.
|
Routing - Erosion and Sediment | 6/4/2018 | | 6/5/2018 | | PASS |
Michael Zawacki
|
|
|
Foothills lot, site prep inspection required.
|
Routing PW Grading-Hillside | 6/5/2018 | | 6/5/2018 | | FAIL |
Melissa Jannusch
|
|
|
Provide engineering for the retaining wall
|
Routing - Addressing | 6/4/2018 | | 6/5/2018 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 6/4/2018 | | 6/5/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing - MECHANICAL | 6/4/2018 | | 6/5/2018 | | PASS |
Chad Schwendiman
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/4/2018 | | DONE |
|
|
|
|
Intake Approval | | | 6/4/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/4/2018 | | DONE |
|
|
|
|
Intake Approval | | | 5/9/2018 | | FAIL |
|
|
|
1.Project will require a CAT II Hillside application prior to acceptance of the building permit application.
2.Need elevation heights
|
Application received | | | 5/7/2018 | | DONE |
|
|
|
Application submitted via PDS Online on May 7 2018 4:32PM
|