Letter of compliance/Occupancy | | | 3/1/2019 | | DONE |
|
|
|
|
BLD-Final | 12/20/2018 | 12/21/2018 | 12/21/2018 | A | PASS |
Jim Storey
|
|
|
Call at least 20 minutes prior: Larren Phone #: ###-####
|
DOC - Permit Finaled | 12/21/2018 | 12/21/2018 | 12/21/2018 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 12/19/2018 | 12/20/2018 | 12/20/2018 | A | NH |
Jim Storey
|
|
|
Larren Phone #: ###-####
|
BLD-Framing/Rough-in | 10/11/2018 | 10/12/2018 | 10/12/2018 | A | PASS |
Jim Storey
|
|
|
Larren Phone #: ###-#### c/n made ok/ insulation pass//
|
BLD-Framing/Rough-in | 10/9/2018 | 10/10/2018 | 10/10/2018 | P | PART |
Jim Storey
|
|
|
Larren Phone #: ###-#### support raffter at entry/ hanger rafter to back girder ar door and mech non bearing. ok to insulate.
|
BLD-Wall Bracing | 7/23/2018 | 7/24/2018 | 7/24/2018 | P | PASS |
Jim Storey
|
|
|
Larren Phone #: ###-#### walls ok and floor condition space vizqueen and insulation ok to cover.
|
BLD-Framing/Rough-in | 7/17/2018 | 7/18/2018 | 7/18/2018 | P | PASS |
Mike Jordan
|
|
|
call 15 mins ahead- Larren Phone #: ###-####. Vapor barrier under floor framing and blocking for load path on 3 ply grder .
|
BLD-Conference | 7/18/2018 | 7/18/2018 | 7/18/2018 | P | DONE |
Mike Jordan
|
|
|
call 15 mins ahead- Larren Phone #: ###-####
|
Routing - MECHANICAL | 6/29/2018 | | 6/29/2018 | | PASS |
Troy James
|
|
|
Manual j report
|
BLD-Foundation | 5/29/2018 | 5/30/2018 | 5/30/2018 | A | PASS |
Jim Storey
|
|
|
Wes Phone #: ###-####
|
BLD-Footing | 5/24/2018 | 5/25/2018 | 5/25/2018 | A | PASS |
Jim Sly
|
|
|
Wes Phone #: ###-####
|
Issue PAID IN FULL permit | | | 5/23/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 5/22/2018 | | |
|
|
|
|
Plan assigned to (BJM) | 5/8/2018 | 5/8/2018 | 5/22/2018 | | DONE |
Brian McGowan
|
|
|
walk in
|
Routing - PLAN CHECK | 5/8/2018 | | 5/22/2018 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 5/22/2018 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 5/22/2018 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/22/2018 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 5/22/2018 | | DONE |
Christina Prado
|
|
|
Homeowner GC & RP; all requirements met
|
Plan resubmittals received | | | 5/10/2018 | | DONE |
|
|
|
one copy each of A113, A112 and A301, stamped and taken to BJM
|
Routing Walk-In (Zoning) | 5/8/2018 | 5/8/2018 | 5/8/2018 | A | PASS |
Jeff Lowe
|
|
|
no adu proposed and none permitted with this permit
|
Routing Walk-In (BLD) | 5/8/2018 | 5/8/2018 | 5/8/2018 | A | PASS |
Brian McGowan
|
|
|
Brian took in as a level 2
|
Routing - PUBLIC WORKS | 5/8/2018 | | 5/8/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing - Addressing | 5/8/2018 | | 5/8/2018 | | PASS |
Doug Chausow
|
|
|
Duplex address added 3529 W Hillcrest Dr
|
1st review completed | | | 5/8/2018 | | FAIL |
Brian McGowan
|
|
|
Need detail for garage floor build up. Will drop off.
|
Routing - PLAN CHECK | 5/8/2018 | | 5/8/2018 | | FAIL |
Brian McGowan
|
|
|
|
Application received | | 5/8/2018 | | | |
|
|
|
|