BLD-Final | 8/14/2018 | 8/15/2018 | 8/15/2018 | A | PASS |
Jim Storey
|
|
|
Please call when there for garage code. Thanks. Phone #: ###-#### Inspection requested via web by Nathan Taylor built to the reviewed drawings to meet city code.
|
DOC - Permit Finaled | 8/15/2018 | 8/15/2018 | 8/15/2018 | P | PASS |
Jim Storey
|
|
|
built to the reviewed drawings to meet city code.
|
BLD-Framing/Rough-in | 6/14/2018 | 6/15/2018 | 6/15/2018 | A | FAIL |
Jim Sly
|
|
|
Plans and truss paperwork is in garage, in corner by man door. Please call with any questions. Thanks Phone #: ###-#### Inspection requested via web by Nathan Taylor C/N posted...Non coplying winders, Stair nosing, stair header, and truss bracing.
|
BLD-Wall Bracing | 6/5/2018 | 6/6/2018 | 6/6/2018 | A | PASS |
Mike Jordan
|
|
|
Nathan--as early as possible Phone #: ###-####
|
BLD-Wall Bracing | 5/31/2018 | 6/1/2018 | 6/1/2018 | P | CANC |
Jim Storey
|
|
|
Please come as late as possible. Thanks Phone #: ###-#### >> Inspection requested via web by Nathan Taylor
|
BLD-Footing | 5/14/2018 | 5/14/2018 | 5/14/2018 | P | PASS |
Jim Storey
|
|
|
Chris Phone #: ###-####
|
OVERRIDE | | | 5/8/2018 | | |
|
|
|
|
Routing Walk-In (Zoning) | 5/8/2018 | 5/8/2018 | 5/8/2018 | A | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 5/8/2018 | 5/8/2018 | 5/8/2018 | A | DONE |
Brian McGowan
|
|
|
|
1st review completed | | | 5/8/2018 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 5/8/2018 | | 5/8/2018 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 5/8/2018 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 5/8/2018 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/8/2018 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 5/8/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 5/8/2018 | | |
|
|
|
|
Application received | | 5/8/2018 | | | |
|
|
|
|