Print Statement | | | 4/13/2020 | | DONE |
|
|
|
|
Third Notice | | 3/10/2020 | 4/3/2020 | | DONE |
|
|
|
mailed 4-6-2020 with first follow up letter
|
First Follow up | | | 4/3/2020 | | DONE |
|
|
|
|
Third Notice | | 2/11/2020 | 3/5/2020 | | DONE |
|
|
|
mailed 3-6-20
|
Third Notice | | 1/4/2020 | 2/6/2020 | | DONE |
|
|
|
mailed 2-7-20 to parcel owner
|
Second Notice | | 12/5/2019 | 12/30/2019 | | DONE |
|
|
|
mailed 1-1-20
|
First Notice | | 11/9/2019 | 11/25/2019 | | DONE |
|
|
|
Mailed 12-2-19
|
BLD-Final | 10/29/2019 | 10/30/2019 | 10/30/2019 | A | PASS |
Mike Jordan
|
|
|
Carrie Phone #: ###-####. Ok for perm occ. Also verified that the pad lock has been removed from the east gate.
|
Permanent Occupancy | | | 10/30/2019 | | DONE |
|
|
|
|
FIRE-Final Inspection | 10/15/2019 | 10/16/2019 | 10/16/2019 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. Carrie is to remove the padlock on the east side gate in the fence that the basement and second floor empty into. Carrie Phone #: ###-####
|
Zoning Approval | 10/16/2019 | 10/16/2019 | 10/16/2019 | | DONE |
Leon Letson
|
|
|
|
BLD-Conference | 8/13/2019 | 8/19/2019 | 8/19/2019 | A | DONE |
Mike Jordan
|
|
|
Call ahead to meet // Kerry Phone #: ###-####. Walk through. Noted no inspections for exterior door and new wall.
|
FIRE-Conference | 7/25/2019 | 7/25/2019 | 7/25/2019 | P | DONE |
Troy Cobbley
|
|
|
Carrie and I went over her life safety comments
|
OVERRIDE | | | 2/6/2019 | | |
|
|
|
|
Plan assigned to (CJW) | 1/30/2019 | 1/30/2019 | 2/6/2019 | | PASS |
Carl Westfall
|
|
|
Plan mod - Boise Daycare (plans routed)
|
CHANGE STATUS TO (ISS) | | | 2/6/2019 | | DONE |
|
|
|
plan mod
|
Inspection Record Card- Bld | | | 2/6/2019 | | |
|
|
|
|
Plan Reviewer's activity | | | 2/6/2019 | | PASS |
|
|
|
Plan mod review approved
|
Permit Ready to Issue | | | 2/6/2019 | | DONE |
|
|
|
MET plan mod - need Revised Value
|
Routing - PLUMBING | 1/31/2019 | | 2/5/2019 | | PASS |
Daryl Spivey
|
|
|
New fixtures
|
Routing - PLANNING | 1/31/2019 | | 2/1/2019 | | PASS |
Brent Moore
|
|
|
changed outside play area
|
Routing - PLANNING | 2/1/2019 | | 2/1/2019 | | PASS |
Brent Moore
|
|
|
|
Routing PW Sewer Rating | 1/31/2019 | | 1/31/2019 | | PASS |
Morgan Webb
|
|
|
CONTACTED WEST BOISE WITH UPDATED FIXTURE COUNT
|
Routing - PLAN CHECK | 1/30/2019 | | 1/31/2019 | | PASS |
Carl Westfall
|
|
|
1st plan mod approved
|
Plan Modification Accepted | | | 1/30/2019 | | DONE |
|
|
|
Plan Mod - Site: Modified configuration of play area fencing.
Lower Level: Added Washer/Dryer to Mech Room, added base cabinet to Multi Purpose Room, and finalized Food Prep layout and equipment.
Upper Level: Changed new toilet room layout, added pony wall and base cabinet to 0-1 Year Old Room, added base cabinet to 1-2.5 Year Old Room, added boat shaped raised platform to 3+ Year Old Room.
|
BLD-Conference | 11/21/2018 | 11/26/2018 | 11/26/2018 | A | DONE |
Mike Jordan
|
|
|
Louie Phone #: ###-####. Call before going out.. Needs to call public works to discuss the gutter. Also suggested to contractor to contact fire inspector for conferance on fire alarm requirements.
|
BLD-Conference | 11/21/2018 | 11/21/2018 | 11/21/2018 | P | CANC |
Mike Jordan
|
|
|
Louie Phone #: ###-####. Rescheduled for Monday 11-26 in the am.
|
Print Occupancy Form | | | 11/5/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 11/5/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 6/15/2018 | | |
|
|
|
|
Permit Ready to Issue | | | 6/15/2018 | | DONE |
|
|
|
CARRIEANNGIRL@GMAIL.COM
MET
Need
GC Form (parcel owner acting as GC)
Revised Cert of value
MET
RP
ACHD
|
Route to Impact Fee Review | 6/14/2018 | 6/17/2018 | 6/14/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Plan assigned to (CJW) | 5/17/2018 | 5/17/2018 | 6/14/2018 | | PASS |
Carl Westfall
|
|
|
* (1st done) (June 6 - 15 days) (8 sheets) Boise Daycare L-3
|
1st review completed | | | 6/14/2018 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/14/2018 | | DONE |
|
|
|
|
Routing - FIRE | 5/17/2018 | 5/17/2018 | 6/13/2018 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Routing - PLAN CHECK | 5/17/2018 | | 5/24/2018 | | PASS |
Carl Westfall
|
|
|
|
Routing - PLANNING | 5/17/2018 | | 5/23/2018 | | PASS |
Todd Tucker
|
|
|
A bike rack with the capacity for a minimum of 1 bike is required.
|
Routing - PUBLIC WORKS | 5/17/2018 | | 5/21/2018 | | PASS |
Rachael Beierle
|
|
|
|
Routing PW Drainage | 5/21/2018 | | 5/21/2018 | | PASS |
Brian Murphy
|
|
|
|
Routing - Erosion and Sediment | 5/17/2018 | | 5/18/2018 | | PASS |
Andy J. Long
|
|
|
ESC plan waiver approved. Will need to designate certified RP
|
Routing - Addressing | 5/17/2018 | | 5/18/2018 | | PASS |
Doug Chausow
|
|
|
|
Intake Approval | | | 5/17/2018 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 5/17/2018 | | DONE |
Carl D Madsen
|
|
|
Wes, please make sure that you verify if any ACHD fees are due for this project as it is a change in use. Building permits cannot be issued without verification that fees have been paid or that no fees are due. Please provide verification of any fee requirements. If fees have been paid to ACHD provide a copy of the receipt. If any fees are due they can be collected by the city at the time the permit is issued.
|
Application received | | | 5/8/2018 | | DONE |
|
|
|
Application submitted via PDS Online on May 8 2018 3:34PM
|