BLD-Final | 5/30/2018 | 5/31/2018 | 5/31/2018 | A | PASS |
Jim Sly
|
|
|
Brock--please call ahead Phone #: ###-####
|
DOC - Permit Finaled | 5/31/2018 | 5/31/2018 | 5/31/2018 | P | PASS |
Jim Sly
|
|
|
|
BLD-Framing/Rough-in | 5/25/2018 | 5/29/2018 | 5/29/2018 | P | PASS |
Brandon Shaw
|
|
|
Brock-early afternoon preferred Phone #: ###-####
|
BLD-Footing | 5/10/2018 | 5/11/2018 | 5/11/2018 | A | PASS |
Brandon Shaw
|
|
|
Brock-please call ahead Phone #: ###-####
|
Routing Walk-In (BLD) | 5/10/2018 | 5/10/2018 | 5/10/2018 | A | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 5/10/2018 | | 5/10/2018 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 5/10/2018 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 5/10/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 5/10/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/10/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 5/10/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 5/10/2018 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 5/9/2018 | 5/9/2018 | 5/9/2018 | P | PASS |
Jeff Lowe
|
|
|
|
Routing Walk-In (BLD) | 5/9/2018 | 5/9/2018 | 5/9/2018 | P | FAIL |
Josh Bogle
|
|
|
attached shade structure - needs engineering for shear
|
Routing - PLAN CHECK | 5/9/2018 | | 5/9/2018 | | FAIL |
Josh Bogle
|
|
|
|
1st review completed | | | 5/9/2018 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | 5/9/2018 | | | |
|
|
|
|