BLD-Final | 8/27/2018 | 8/27/2018 | 8/27/2018 | P | NR |
Jim Storey
|
|
|
Please call Annie before you head there so I can have someone onsite to meet you. Thanks! A Phone #: ###-#### Inspection requested via web by Annie Coates
|
BLD-Foundation | 7/3/2018 | 7/5/2018 | 7/5/2018 | A | PASS |
Jim Storey
|
|
|
Anna Phone #: ###-####
|
PubWorks Subgrade Approval | 6/20/2018 | 6/20/2018 | 6/20/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Foundation | 6/7/2018 | 6/7/2018 | 6/7/2018 | P | NR |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Annie Coates. Needs geotech report, footings not ready.
|
Issue PAID IN FULL permit | | | 5/16/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 5/11/2018 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 5/9/2018 | 5/9/2018 | 5/11/2018 | | PASS |
Josh Bogle
|
|
|
due 5/15 - metal deck beam, 310, Hillside
|
Routing - PLAN CHECK | 5/9/2018 | | 5/11/2018 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 5/11/2018 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 5/11/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 5/11/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/11/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 5/11/2018 | | DONE |
|
|
|
Need
RP -met
|
Telephone call | | | 5/11/2018 | | DONE |
|
|
|
Called Annie to inform her the permit is ready, cofirmed RP and what fees are due.
|
Routing - Erosion and Sediment | 5/9/2018 | | 5/10/2018 | | PASS |
Andy J. Long
|
|
|
ESC plan waiver approved. Certified RP designated.
|
Routing Walk-In (BLD) | 5/9/2018 | 5/9/2018 | 5/9/2018 | P | PASS |
Josh Bogle
|
|
|
took in as a level 2
|
Routing PW Grading-Hillside | 5/9/2018 | | 5/9/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
|
Application received | | 5/9/2018 | | | |
|
|
|
|