BLD-Energy code compliance | 5/22/2020 | 5/22/2020 | 5/22/2020 | P | PASS |
Tony Young
|
|
|
Bill Phone #: ###-####
|
BLD-Framing/Rough-in | 5/19/2020 | 5/20/2020 | 5/20/2020 | A | PASS |
Tony Young
|
|
|
Bill *screened* Phone #: ###-####
|
Routing - MECHANICAL | 2/28/2020 | | 2/28/2020 | | PASS |
Troy James
|
|
|
New manual j report
|
Routing Walk-In (BLD) | 12/5/2019 | 12/5/2019 | 12/5/2019 | A | PASS |
Josh Bogle
|
|
|
|
(F) Reprint permit | | | 11/12/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/12/2019 | | DONE |
|
|
|
|
BLD-Conference | 10/11/2019 | 10/14/2019 | 10/14/2019 | A | PART |
Tony Young
|
|
|
walk through,, call 1st,, Patty; Phone #: ###-####,, walk through with possible new buyer
|
BLD-Conference | 10/2/2018 | 10/4/2018 | 10/4/2018 | A | FAIL |
Tony Young
|
|
|
Please call ahead for access, determine framing corrections as are - Josh Phone #: ###-####, walk through on frame,, correction posted on exterior and interior
|
BLD-Framing/Rough-in | 9/26/2018 | 9/26/2018 | 9/26/2018 | P | NR |
Jim Sly
|
|
|
Josh-call for access and plans Phone #: ###-#### Need Electrical.
|
Issue PAID IN FULL permit | | | 6/19/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/19/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 6/15/2018 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 5/9/2018 | 5/9/2018 | 6/15/2018 | | PASS |
Josh Bogle
|
|
|
1st done - needs elevation certificate
|
Routing PW Flood Plain | 6/15/2018 | | 6/15/2018 | | PASS |
Jason C. Taylor
|
|
|
|
Elevation Cert Rec'd-Prelim | | | 6/15/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/15/2018 | | 6/15/2018 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 6/15/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 6/15/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/15/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 6/15/2018 | | DONE |
|
|
|
NEED ALL MET-(if owner is not acting as GC)
RP
GC Form
|
Routing PW Flood Plain | 5/9/2018 | | 5/10/2018 | | FAIL |
Jason C. Taylor
|
|
|
A portion of the subject property is within the regulatory floodplain. This project must comply with the Boise Floodplain Ordinance (B.C.C. 11-08). If you have any questions, please call Jason Taylor at ###-####. (Tried to leave message on Voicemail but box was full)
|
Routing - PLAN CHECK | 5/9/2018 | | 5/10/2018 | | FAIL |
Josh Bogle
|
|
|
needs foundation with elevation levels noted - JAB
|
1st review completed | | | 5/10/2018 | | FAIL |
Josh Bogle
|
|
|
|
Routing Walk-In (Zoning) | 5/9/2018 | 5/9/2018 | 5/9/2018 | P | PASS |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 5/9/2018 | 5/9/2018 | 5/9/2018 | P | PASS |
Josh Bogle
|
|
|
|
Application received | | 5/9/2018 | | | |
|
|
|
|