BLD-Final | 12/24/2018 | 12/26/2018 | 12/26/2018 | A | PASS |
Jim Storey
|
|
|
Les Phone #: ###-####
|
DOC - Permit Finaled | 12/26/2018 | 12/26/2018 | 12/26/2018 | P | PASS |
Jim Storey
|
|
|
|
BLD-Blower Door Test Results | 12/26/2018 | 12/26/2018 | 12/26/2018 | P | DONE |
Jim Storey
|
|
|
Les Phone #: ###-#### 4,03
|
PubWorks Occupancy Approval | 12/26/2018 | 12/26/2018 | 12/26/2018 | | DONE |
Jason C. Taylor
|
|
|
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Energy code compliance | 9/18/2018 | 9/19/2018 | 9/19/2018 | A | PASS |
Brandon Shaw
|
|
|
Corrections SAT...
OK to cover
|
BLD-Framing/Rough-in | 9/14/2018 | 9/17/2018 | 9/17/2018 | A | PART |
Brandon Shaw
|
|
|
Edge, field, and blocking as per shear wall schedule... As per plans, (2) 2x8 header at interior bearing wall, and (2) 91/2 LVL header at slider door, dowm stairs bonus room... See red paint... OK to insulate
|
BLD-Other | 9/17/2018 | 9/17/2018 | 9/17/2018 | P | PASS |
Brandon Shaw
|
|
|
sofit // Les Phone #: ###-####
|
BLD-Foundation | 6/20/2018 | 6/20/2018 | 6/20/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Footing | 6/19/2018 | 6/19/2018 | 6/19/2018 | A | PASS |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Footing | 6/18/2018 | 6/18/2018 | 6/18/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
|
PubWorks Subgrade Approval | 6/11/2018 | 6/11/2018 | 6/11/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 6/1/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/1/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 5/18/2018 | | |
|
|
|
|
Plan assigned to (RDP) | 5/14/2018 | 5/14/2018 | 5/18/2018 | | DONE |
Rob Patrick
|
|
|
5/31 sfd L2 ePlan
|
Routing - PLAN CHECK | 5/14/2018 | | 5/18/2018 | | PASS |
Rob Patrick
|
|
|
|
1st review completed | | | 5/18/2018 | | DONE |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/18/2018 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 5/18/2018 | | DONE |
|
|
|
|
Route to Impact Fee Review | 5/14/2018 | 5/17/2018 | 5/16/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing PW Grading-Hillside | 5/15/2018 | | 5/16/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
|
Routing - MECHANICAL | 5/14/2018 | | 5/16/2018 | | PASS |
Troy James
|
|
|
|
Routing - Erosion and Sediment | 5/14/2018 | | 5/16/2018 | | PASS |
Andy J. Long
|
|
|
ESC plan approved. Certified stormwater team. Site preparation inspection required. Perimeter silt fence per plan is required.
|
Routing - FIRE | 5/14/2018 | 5/14/2018 | 5/15/2018 | | PASS |
Tim Frost
|
|
|
5/31 house ePlan
|
Routing - PLANNING | 5/14/2018 | | 5/15/2018 | | PASS |
Sue Cummings
|
|
|
|
Routing - Addressing | 5/14/2018 | | 5/15/2018 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 5/14/2018 | | 5/15/2018 | | PASS |
Morgan Webb
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/14/2018 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/14/2018 | | DONE |
|
|
|
|
Intake Approval | | | 5/14/2018 | | PASS |
Brittany Hill
|
|
|
|
Application received | | | 5/10/2018 | | DONE |
|
|
|
Application submitted via PDS Online on May 10 2018 4:21PM
|