BLD-Aging Inspection | 10/24/2018 | 10/24/2018 | 10/25/2018 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 10/23/2018 | 10/23/2018 | 10/24/2018 | | PEND |
Tony Young
|
|
|
|
BLD-Foundation | 6/11/2018 | 6/11/2018 | 6/11/2018 | P | PASS |
Brandon Shaw
|
|
|
Shaun--pour time is 12:30 Phone #: ###-####
|
PubWorks Subgrade Approval | 6/11/2018 | 6/11/2018 | 6/11/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Footing | 6/8/2018 | 6/8/2018 | 6/8/2018 | P | NR |
Jim Sly
|
|
|
pour time 1:30pm- David Phone #: ###-#### Checked rebar in footings.....appeared to match Engineering. No approval in computer by Zoning. Contr. says they have it approved. Told them that I have to verify in computer....Zoning Approved. This is basically ....retaining wall and landscaping.
|
OVERRIDE | | | 5/31/2018 | | |
|
|
|
|
Routing Walk-In (BLD) | 5/31/2018 | 5/31/2018 | 5/31/2018 | A | DONE |
Josh Bogle
|
|
|
|
Plan assigned to (JAB) Josh | 5/11/2018 | 5/11/2018 | 5/31/2018 | | PASS |
Josh Bogle
|
|
|
1st done - Hillside retaining walls, need building plan & engineering
|
Routing - PLAN CHECK | 5/31/2018 | | 5/31/2018 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 5/31/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 5/31/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/31/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 5/31/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 5/31/2018 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 5/23/2018 | | FAIL |
Josh Bogle
|
|
|
e-mail contact with landsacpe architect
|
Routing - PLAN CHECK | | | 5/22/2018 | | FAIL |
Josh Bogle
|
|
|
need a build plan & engineering
|
Routing - PLANNING | 5/22/2018 | | 5/22/2018 | | PASS |
David Moser
|
|
|
CFH18-00043 David Moser
|
Routing PW Flood Plain | 5/15/2018 | | 5/22/2018 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PUBLIC WORKS | 5/21/2018 | | 5/22/2018 | | PASS |
Rachael Beierle
|
|
|
|
1st review completed | | | 5/22/2018 | | FAIL |
Josh Bogle
|
|
|
|
Routing PW Grading-Hillside | 5/15/2018 | | 5/21/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call ###-#### to schedule an inspection.
|
Routing - Addressing | 5/11/2018 | | 5/15/2018 | | PASS |
Laura Hunter
|
|
|
|
Routing - Erosion and Sediment | 5/11/2018 | | 5/11/2018 | | PASS |
Michael Zawacki
|
|
|
Work began without permits. Homeowner to act as RP. OK to install BMPs and revegetate only before issuance of permit, no dirt work allowed.
|
Intake Approval | | | 5/11/2018 | | PASS |
|
|
|
ok to take in per Jason Taylor prior to floodplain approaval and during hillside appeal period. Customer is aware review will not pass until approvals and appeal periods over.
|
Application received | | 5/11/2018 | | | |
|
|
|
|