BLD-Aging Inspection | 6/21/2019 | 6/21/2019 | 6/21/2019 | | PASS |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 6/21/2019 | 6/21/2019 | 6/21/2019 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 2/7/2019 | 2/7/2019 | 2/7/2019 | P | PASS |
Brandon Shaw
|
|
|
Corrections SAT...
|
BLD-Final | 2/5/2019 | 2/5/2019 | 2/5/2019 | P | FAIL |
Mike Jordan
|
|
|
Scott Phone #: ###-####. Handrails mounted to high, provide tempered glazing next to shower upstairs. Provide the correct address. Provide min 36 inch high half wall next to stairs.
|
BLD-Energy code compliance | 11/28/2018 | 11/28/2018 | 11/28/2018 | P | PASS |
Mike Jordan
|
|
|
mateo Phone #: ###-####
|
BLD-Framing/Rough-in | 11/21/2018 | 11/21/2018 | 11/21/2018 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Sam Brown
|
BLD-Framing/Rough-in | 11/9/2018 | 11/9/2018 | 11/9/2018 | P | FAIL |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Sam Brown. Provide truss engineering. Complete install of break away clips on 2hr. wall. Provide hangars for floor joist in garage to paralam connection. Install addtional studs under 2ply truss upstairs and the H2.5. Complete 2hr assembly at soffits... Correction notice posted.
|
BLD-Framing/Rough-in | 11/7/2018 | 11/7/2018 | 11/7/2018 | P | NR |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Sam Brown
|
BLD-Wall Bracing | 10/23/2018 | 10/23/2018 | 10/23/2018 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Sam Brown
|
BLD-Concrete | 9/19/2018 | 9/19/2018 | 9/19/2018 | P | PASS |
Mike Jordan
|
|
|
Thickened footings Phone #: ###-#### Inspection requested via web by Sam Brown
|
BLD-Energy code compliance | 9/19/2018 | 9/19/2018 | 9/19/2018 | P | PASS |
Mike Jordan
|
|
|
Foundation insulation Phone #: ###-#### Inspection requested via web by Sam Brown
|
BLD-Energy code compliance | 9/6/2018 | 9/6/2018 | 9/6/2018 | P | PART |
Brandon Shaw
|
|
|
Foundation insulation.
|
BLD-Energy code compliance | 9/4/2018 | 9/4/2018 | 9/4/2018 | A | NR |
Mike Jordan
|
|
|
Foundation Insulation Phone #: ###-#### Inspection requested via web by Sam Brown
|
BLD-Foundation | 8/27/2018 | 8/28/2018 | 8/28/2018 | P | PASS |
Mike Jordan
|
|
|
foundation // Dane Phone #: ###-####
|
BLD-Footing | 8/27/2018 | 8/27/2018 | 8/27/2018 | P | PART |
Mike Jordan
|
|
|
Latest as possible - Wes Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 8/14/2018 | | DONE |
|
|
|
recieved signed permit for BLD18-01669
|
CHANGE STATUS TO (RDY) | | | 8/13/2018 | | DONE |
|
|
|
DO NOT ISSUE
Changed status to RDY-please don't change this to ISS until we have received the signed permit for BLD18-01669-I've called Perryman at least 6 times asking them to sign it and send it back. I accidentialy signed off on the verify fees paid task in e plan
|
(F) Reprint permit | | | 8/6/2018 | | DONE |
|
|
|
|
Telephone call | | | 8/6/2018 | | DONE |
|
|
|
emailed Sam again that we need the signed permit back
|
Issue PAID IN FULL permit | | | 7/27/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/27/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 7/23/2018 | | |
|
|
|
|
Plan assigned to (BJM) | 5/21/2018 | 5/21/2018 | 7/23/2018 | | DONE |
Brian McGowan
|
|
|
1st review complete 6-7 sfd L2 ePlan
|
Routing - PLAN CHECK | 7/23/2018 | | 7/23/2018 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/23/2018 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 7/23/2018 | | DONE |
|
|
|
****permit has already been issued so please don't change status to ISS until we get the sign permit from BLD18-01669***
MET-need
RP
|
Routing - MECHANICAL | 7/9/2018 | | 7/9/2018 | | PASS |
Chad Schwendiman
|
|
|
|
Routing - MECHANICAL | 6/20/2018 | | 6/20/2018 | | FAIL |
Chad Schwendiman
|
|
|
Two seperate manual J's were uploaded for each unit shoiwing different sized air conditioners on 6-15-18. Need to delete which ever manual J's aren't going to be used
|
1st review completed | | | 6/5/2018 | | FAIL |
Brian McGowan
|
|
|
Must meet Planning requirements. Misc structure items.
|
Routing - PLANNING | 6/5/2018 | | 6/5/2018 | | PASS |
Cody Riddle
|
|
|
A 10' front setback is allowed. The project is a PUD that crosses city-limits with Meridian. The 10' setback matches that approved in Meridian to the west. It is internal to the project. The upper level balcony cannot enroach into the 10' setback.
|
Routing - PLAN CHECK | 5/21/2018 | | 6/5/2018 | | FAIL |
Brian McGowan
|
|
|
Must meet Planning requirements. Misc structure items.
|
Routing - MECHANICAL | 5/21/2018 | | 5/24/2018 | | FAIL |
Chad Schwendiman
|
|
|
Emailed corrections
|
Route to Impact Fee Review | 5/21/2018 | 5/24/2018 | 5/22/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PLANNING | 5/21/2018 | | 5/22/2018 | | FAIL |
Cody Riddle
|
|
|
A 15' setback is required. Notified applicant via email.
|
Routing - Addressing | 5/21/2018 | | 5/22/2018 | | PASS |
Doug Chausow
|
|
|
Address corrected to: 1282 N Mount Hood Ave
|
Routing - PUBLIC WORKS | 5/21/2018 | | 5/21/2018 | | PASS |
Rachael Beierle
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/21/2018 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/21/2018 | | DONE |
|
|
|
|
Intake Approval | | | 5/21/2018 | | PASS |
|
|
|
|
Intake Approval | | | 5/16/2018 | | FAIL |
Tiffany Carson-Herker
|
|
|
1. Plans must be individual sheets and file names must include the first character of sheet name and sheet number.
2. Manual J
3. Stair section detail showing treads, risers, headroom, handrails & guard requirements.
|
Application received | | | 5/11/2018 | | DONE |
|
|
|
Application submitted via PDS Online on May 11 2018 8:47AM
|
Routing - PLAN CHECK | 6/20/2018 | | | | FAIL |
Brian McGowan
|
|
|
Applicant requested task be sent back in order to upload required changes to the drawings.
|