Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD18-01669
StatusFinaled
Name PERRYMAN CONSTRUCTION MANAGEMENT IN
Site Address 1290 N MOUNT HOOD AVE
Project NameL6 B1 Cottages at White Clouds
Customer NumberEPLAN BLD18-01668
ePlanReview 
Description
(TWO PERMITS UNDER BLD18-01668)Permit for the construction of a new 1,277 sq. ft., two story (first story 508 sq. ft., second story 769 sq. ft.) single family dwelling with 3 bedrooms, 2 and a half bathrooms, approximately 0 sq. ft. of covered patio/porch and a 412 sq. ft. attached garage per the approved plans and any notations. R-1C zoning and setbacks per planning.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/7/20192/7/20192/7/2019PPASS
DetailsBrandon Shaw
Corrections SAT...
DOC - Permit Finaled2/7/20192/7/20192/7/2019PPASS
DetailsBrandon Shaw
BLD-Final2/5/20192/5/20192/5/2019PFAIL
DetailsMike Jordan
Scott Phone #: ###-####. Habdrail mounted to high. Correct the adress.
BLD-Energy code compliance11/28/201811/28/201811/28/2018PPASS
DetailsMike Jordan
mateo Phone #: ###-####
BLD-Framing/Rough-in11/21/201811/21/201811/21/2018APASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Sam Brown
BLD-Framing/Rough-in11/9/201811/9/201811/9/2018PFAIL
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Sam Brown. Provide additional studs under the 13/4 X18 LVL. Nail off 2 ply C02 truss upstairs and add additional studs and h2.5. Complete 2hr. assembly at soffits. Install break away clips. Tempered glazing required at window by shower upstairs.
BLD-Framing/Rough-in11/7/201811/7/201811/7/2018PNR
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Sam Brown
BLD-Wall Bracing10/23/201810/23/201810/23/2018PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Sam Brown
BLD-Concrete9/19/20189/19/20189/19/2018PPASS
DetailsMike Jordan
Thickened footings Phone #: ###-#### Inspection requested via web by Sam Brown
BLD-Energy code compliance9/19/20189/19/20189/19/2018PPASS
DetailsMike Jordan
Foundation insulation Phone #: ###-#### Inspection requested via web by Sam Brown
BLD-Energy code compliance9/6/20189/6/20189/6/2018PPART
DetailsBrandon Shaw
Foundation insulation
BLD-Energy code compliance9/4/20189/4/20189/4/2018ANR
DetailsMike Jordan
Foundation Insulation Phone #: ###-#### Inspection requested via web by Sam Brown
BLD-Foundation8/27/20188/28/20188/28/2018PPASS
DetailsMike Jordan
foundation // Dane Phone #: ###-####
BLD-Footing8/27/20188/27/20188/27/2018PPART
DetailsMike Jordan
Latest as possible - Wes Phone #: ###-####
Telephone call  8/14/2018 DONE
called Sam again to let know taht we need the signed building and erosion permits back ASAP-left message on his phone
CHANGE STATUS TO (ISS)  8/14/2018 DONE
recieved the signed permits back so changed status
CHANGE STATUS TO (RDY)  8/13/2018 DONE
DO NO RE ISSUE
Changed status to RDY-please don't change this to ISS until we have received the signed permit-I've called Perryman at least 6 times asking them to sign it and send it back. I accidentialy signed off on the verify fees paid task in e plan (BLD18-01668)
Telephone call  8/8/2018 DONE
called Sam-he will sign the building and erosion permits and send back to me so i can sign off on the approved drawings
(F) Reprint permit  7/31/2018 DONE
Issue PAID IN FULL permit  7/27/2018 DONE
Inspection Record Card- Bld  7/27/2018 DONE
Inspection Record Card- Bld  7/27/2018 DONE
OVERRIDE  7/23/2018  
Plan assigned to (BJM)5/21/20185/21/20187/23/2018 DONE
DetailsBrian McGowan
1st review complete 6-7 sfd L2 ePlan
Routing - PLAN CHECK7/23/2018 7/23/2018 PASS
DetailsBrian McGowan
Routing - MECHANICAL7/23/2018 7/23/2018 PASS
DetailsChad Schwendiman
PLANS/APPL TAKEN TO FRONT DESK  7/23/2018 DONE
DetailsBrian McGowan
Permit Ready to Issue  7/23/2018 DONE
****permit has already been issued so please change status to issue once the buildingpermit for BLD18-01669 has been signed and sent back***
MET-Need
RP
1st review completed  6/5/2018 FAIL
DetailsBrian McGowan
Must meet Planning requirements. Misc structure items.
Routing - PLAN CHECK5/21/2018 6/5/2018 FAIL
DetailsBrian McGowan
Must meet Planning requirements. Misc structure items.
Routing - PLANNING5/21/2018 6/5/2018 PASS
DetailsCody Riddle
A 10' front setback is allowed. The project is a PUD that crosses city-limits with Meridian. The 10' setback matches that approved in Meridian to the west. It is internal to the project. The upper level balcony cannot enroach into the 10' setback.
Routing - MECHANICAL5/21/2018 5/24/2018 FAIL
DetailsChad Schwendiman
Emailed corrections
Route to Impact Fee Review5/21/20185/24/20185/22/2018 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - Addressing5/21/2018 5/22/2018 PASS
DetailsDoug Chausow
Address corrected to: 1290 N Mount Hood Ave
Routing - PUBLIC WORKS5/21/2018 5/21/2018 PASS
DetailsRachael Beierle
Plans ACCEPTED BY PLAN TECH  5/21/2018 DONE
Recd Pcfee & Taken To Pln CK  5/21/2018 DONE
Intake Approval  5/21/2018 PASS
Intake Approval  5/16/2018 FAIL
DetailsTiffany Carson-Herker
1. Plans must be individual sheets and file names must include the first character of sheet name and sheet number.
2. Manual J
3. Stair section detail showing treads, risers, headroom, handrails & guard requirements.
Application received  5/11/2018 DONE
Application submitted via PDS Online on May 11 2018 9:16AM