BLD-Final | 2/7/2019 | 2/7/2019 | 2/7/2019 | P | PASS |
Brandon Shaw
|
|
|
Corrections SAT...
|
DOC - Permit Finaled | 2/7/2019 | 2/7/2019 | 2/7/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Final | 2/5/2019 | 2/5/2019 | 2/5/2019 | P | FAIL |
Mike Jordan
|
|
|
Scott Phone #: ###-####. Habdrail mounted to high. Correct the adress.
|
BLD-Energy code compliance | 11/28/2018 | 11/28/2018 | 11/28/2018 | P | PASS |
Mike Jordan
|
|
|
mateo Phone #: ###-####
|
BLD-Framing/Rough-in | 11/21/2018 | 11/21/2018 | 11/21/2018 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Sam Brown
|
BLD-Framing/Rough-in | 11/9/2018 | 11/9/2018 | 11/9/2018 | P | FAIL |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Sam Brown. Provide additional studs under the 13/4 X18 LVL. Nail off 2 ply C02 truss upstairs and add additional studs and h2.5. Complete 2hr. assembly at soffits. Install break away clips. Tempered glazing required at window by shower upstairs.
|
BLD-Framing/Rough-in | 11/7/2018 | 11/7/2018 | 11/7/2018 | P | NR |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Sam Brown
|
BLD-Wall Bracing | 10/23/2018 | 10/23/2018 | 10/23/2018 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Sam Brown
|
BLD-Concrete | 9/19/2018 | 9/19/2018 | 9/19/2018 | P | PASS |
Mike Jordan
|
|
|
Thickened footings Phone #: ###-#### Inspection requested via web by Sam Brown
|
BLD-Energy code compliance | 9/19/2018 | 9/19/2018 | 9/19/2018 | P | PASS |
Mike Jordan
|
|
|
Foundation insulation Phone #: ###-#### Inspection requested via web by Sam Brown
|
BLD-Energy code compliance | 9/6/2018 | 9/6/2018 | 9/6/2018 | P | PART |
Brandon Shaw
|
|
|
Foundation insulation
|
BLD-Energy code compliance | 9/4/2018 | 9/4/2018 | 9/4/2018 | A | NR |
Mike Jordan
|
|
|
Foundation Insulation Phone #: ###-#### Inspection requested via web by Sam Brown
|
BLD-Foundation | 8/27/2018 | 8/28/2018 | 8/28/2018 | P | PASS |
Mike Jordan
|
|
|
foundation // Dane Phone #: ###-####
|
BLD-Footing | 8/27/2018 | 8/27/2018 | 8/27/2018 | P | PART |
Mike Jordan
|
|
|
Latest as possible - Wes Phone #: ###-####
|
Telephone call | | | 8/14/2018 | | DONE |
|
|
|
called Sam again to let know taht we need the signed building and erosion permits back ASAP-left message on his phone
|
CHANGE STATUS TO (ISS) | | | 8/14/2018 | | DONE |
|
|
|
recieved the signed permits back so changed status
|
CHANGE STATUS TO (RDY) | | | 8/13/2018 | | DONE |
|
|
|
DO NO RE ISSUE
Changed status to RDY-please don't change this to ISS until we have received the signed permit-I've called Perryman at least 6 times asking them to sign it and send it back. I accidentialy signed off on the verify fees paid task in e plan (BLD18-01668)
|
Telephone call | | | 8/8/2018 | | DONE |
|
|
|
called Sam-he will sign the building and erosion permits and send back to me so i can sign off on the approved drawings
|
(F) Reprint permit | | | 7/31/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/27/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/27/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/27/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 7/23/2018 | | |
|
|
|
|
Plan assigned to (BJM) | 5/21/2018 | 5/21/2018 | 7/23/2018 | | DONE |
Brian McGowan
|
|
|
1st review complete 6-7 sfd L2 ePlan
|
Routing - PLAN CHECK | 7/23/2018 | | 7/23/2018 | | PASS |
Brian McGowan
|
|
|
|
Routing - MECHANICAL | 7/23/2018 | | 7/23/2018 | | PASS |
Chad Schwendiman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/23/2018 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 7/23/2018 | | DONE |
|
|
|
****permit has already been issued so please change status to issue once the buildingpermit for BLD18-01669 has been signed and sent back***
MET-Need
RP
|
1st review completed | | | 6/5/2018 | | FAIL |
Brian McGowan
|
|
|
Must meet Planning requirements. Misc structure items.
|
Routing - PLAN CHECK | 5/21/2018 | | 6/5/2018 | | FAIL |
Brian McGowan
|
|
|
Must meet Planning requirements. Misc structure items.
|
Routing - PLANNING | 5/21/2018 | | 6/5/2018 | | PASS |
Cody Riddle
|
|
|
A 10' front setback is allowed. The project is a PUD that crosses city-limits with Meridian. The 10' setback matches that approved in Meridian to the west. It is internal to the project. The upper level balcony cannot enroach into the 10' setback.
|
Routing - MECHANICAL | 5/21/2018 | | 5/24/2018 | | FAIL |
Chad Schwendiman
|
|
|
Emailed corrections
|
Route to Impact Fee Review | 5/21/2018 | 5/24/2018 | 5/22/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Addressing | 5/21/2018 | | 5/22/2018 | | PASS |
Doug Chausow
|
|
|
Address corrected to: 1290 N Mount Hood Ave
|
Routing - PUBLIC WORKS | 5/21/2018 | | 5/21/2018 | | PASS |
Rachael Beierle
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/21/2018 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/21/2018 | | DONE |
|
|
|
|
Intake Approval | | | 5/21/2018 | | PASS |
|
|
|
|
Intake Approval | | | 5/16/2018 | | FAIL |
Tiffany Carson-Herker
|
|
|
1. Plans must be individual sheets and file names must include the first character of sheet name and sheet number.
2. Manual J
3. Stair section detail showing treads, risers, headroom, handrails & guard requirements.
|
Application received | | | 5/11/2018 | | DONE |
|
|
|
Application submitted via PDS Online on May 11 2018 9:16AM
|