BLD-Final | 11/28/2018 | 11/29/2018 | 11/29/2018 | P | PASS |
Brandon Shaw
|
|
|
Final Inspection Phone #: ###-#### Inspection requested via web by Clayton Conner
|
DOC - Permit Finaled | 11/29/2018 | 11/29/2018 | 11/29/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 11/29/2018 | 11/29/2018 | 11/29/2018 | P | DONE |
Brandon Shaw
|
|
|
ACH50- 4.3
|
PubWorks Occupancy Approval | 11/29/2018 | 11/29/2018 | 11/29/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Final | 11/28/2018 | 11/28/2018 | 11/28/2018 | P | CANC |
Tony Young
|
|
|
Ready for Final Phone #: ###-#### >> Inspection requested via web by Clayton Conner Inspection cancelled from web by: Clayton Conner
|
BLD-Energy code compliance | 8/30/2018 | 8/31/2018 | 8/31/2018 | A | PASS |
Brandon Shaw
|
|
|
Insulation Inspection Phone #: ###-#### Inspection requested via web by Clayton Conner
|
BLD-Framing/Rough-in | 8/21/2018 | 8/23/2018 | 8/23/2018 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clayton Conner
|
BLD-Conference | 8/17/2018 | 8/17/2018 | 8/17/2018 | P | PASS |
Tony Young
|
|
|
softit- Clayton Phone #: ###-####,, work in progress, ok
|
BLD-Wall Bracing | 8/2/2018 | 8/3/2018 | 8/3/2018 | A | PASS |
Brandon Shaw
|
|
|
Shear Wall Inspection. Phone #: ###-#### Inspection requested via web by Clayton Conner
|
BLD-Footing | 6/8/2018 | 6/8/2018 | 6/8/2018 | P | PASS |
Jim Sly
|
|
|
Cal Phone #: ###-####
|
PubWorks Subgrade Approval | 6/6/2018 | 6/6/2018 | 6/6/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
OVERRIDE | | | 6/1/2018 | | |
|
|
|
|
Telephone call | | | 6/1/2018 | | DONE |
|
|
|
sent email to connerconstruction@outlook.com about other fees still needing to be paid 6-1-18 11:53am
|
Issue PAID IN FULL permit | | | 6/1/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/1/2018 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 6/1/2018 | | DONE |
Michael Hanson
|
|
|
|
1st review completed | | | 6/1/2018 | | DONE |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/1/2018 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 6/1/2018 | | DONE |
|
|
|
met
|
Plan assigned to (M_H) | 5/15/2018 | | 6/1/2018 | | DONE |
Michael Hanson
|
|
|
06/01 sfd L2 ePlan
|
Routing - PLAN CHECK | 5/15/2018 | | 6/1/2018 | | PASS |
Michael Hanson
|
|
|
|
Routing - PLANNING | 5/15/2018 | | 5/31/2018 | | PASS |
Sue Cummings
|
|
|
Per ePlan approval. MDH
|
Routing PW Grading-Hillside | 5/15/2018 | | 5/23/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
|
Route to Impact Fee Review | 5/15/2018 | 5/18/2018 | 5/16/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - FIRE | 5/15/2018 | 5/15/2018 | 5/16/2018 | | PASS |
Tim Frost
|
|
|
6/01 house
|
Routing - Erosion and Sediment | 5/15/2018 | | 5/16/2018 | | PASS |
Andy J. Long
|
|
|
ESC plan with narrative and site map approved. Certified RP designated. Site preparation inspection required.
|
Routing - MECHANICAL | 5/15/2018 | | 5/16/2018 | | PASS |
Troy James
|
|
|
|
Routing - Addressing | 5/15/2018 | | 5/15/2018 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 5/15/2018 | | 5/15/2018 | | PASS |
Morgan Webb
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/15/2018 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/15/2018 | | DONE |
|
|
|
|
Intake Approval | | | 5/15/2018 | | PASS |
|
|
|
|
Application received | | | 5/14/2018 | | DONE |
|
|
|
Application submitted via PDS Online on May 14 2018 11:23AM
|
Intake Approval | | | 5/14/2018 | | FAIL |
|
|
|
1. Update to 2015 IRC
2. Elevation heights of whole building(to top of roof)
3. Crawlspace ventings or condition crawl space.
|