BLD-Final | 8/9/2018 | 8/9/2018 | 8/9/2018 | P | PASS |
Jim Sly
|
|
|
Please call ahead for access // Tim Phone #: ###-####
|
DOC - Permit Finaled | 8/9/2018 | 8/9/2018 | 8/9/2018 | P | PASS |
Jim Sly
|
|
|
|
BLD-Framing/Rough-in | 7/10/2018 | 7/11/2018 | 7/11/2018 | A | PASS |
Jim Sly
|
|
|
Tim Phone #: ###-####
|
BLD-Wall Bracing | 6/21/2018 | 6/21/2018 | 6/21/2018 | P | PASS |
Jim Sly
|
|
|
Shane Phone #: ###-####
|
BLD-Wall Bracing | 6/14/2018 | 6/15/2018 | 6/15/2018 | A | CANC |
Jim Sly
|
|
|
Shane Phone #: ###-####
|
BLD-Foundation | 5/31/2018 | 6/1/2018 | 6/1/2018 | P | PART |
Jim Sly
|
|
|
Dave-would like early afternoon Phone #: ###-#### Wall appears OK.
|
BLD-Footing | 5/30/2018 | 5/31/2018 | 5/31/2018 | A | PART |
Jim Sly
|
|
|
Dave Phone #: ###-#### No string lines pulled. Unable to determine property lines. Concrete Contactor notified......pour at own risk.
|
OVERRIDE | | | 5/22/2018 | | |
|
|
|
|
Telephone call | | | 5/22/2018 | | DONE |
|
|
|
Let voicemail for Chris to inform him the permit is ready what fees are due. If he as the homeowner if putting the permit in his name we will need a 302, or if Tim Austin Construction is going to have the permit in their name. (see application)
|
Issue PAID IN FULL permit | | | 5/22/2018 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 5/22/2018 | | 5/22/2018 | | PASS |
Andy J. Long
|
|
|
ESC general permit issued per scope of project. Parcel zoned hillside but no work occuring on or near sloped portion of lot. Homeowner RP
|
Permit Ready to Issue | | | 5/22/2018 | | DONE |
|
|
|
Need
if parcel owner is GC will need a 302.
|
Plan assigned to (RDP) | 5/14/2018 | 5/14/2018 | 5/21/2018 | | DONE |
Rob Patrick
|
|
|
5/14...Take-in at front counter routed to Hillside. Garage addition.
|
Routing - PLAN CHECK | 5/21/2018 | | 5/21/2018 | | PASS |
Rob Patrick
|
|
|
|
Routing - PUBLIC WORKS | 5/14/2018 | | 5/21/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing PW Grading-Hillside | 5/15/2018 | | 5/21/2018 | | PASS |
Melissa Jannusch
|
|
|
Subgrade inspection only
|
1st review completed | | | 5/21/2018 | | DONE |
Rob Patrick
|
|
|
|
Inspection Record Card- Bld | | | 5/21/2018 | | DONE |
Rob Patrick
|
|
|
|
Case Summary (BLD) | | | 5/21/2018 | | DONE |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/21/2018 | | DONE |
Rob Patrick
|
|
|
|
Routing - Erosion and Sediment | 5/21/2018 | | 5/21/2018 | | FAIL |
Michael Zawacki
|
|
|
No ESC or waiver request provided.
|
Routing - Addressing | 5/15/2018 | | 5/15/2018 | | PASS |
Laura Hunter
|
|
|
|
Routing Walk-In (Zoning) | 5/14/2018 | 5/14/2018 | 5/14/2018 | A | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 5/14/2018 | 5/14/2018 | 5/14/2018 | P | CANC |
Rob Patrick
|
|
|
Took in as level 2.
|
Application received | | 5/14/2018 | | | |
|
|
|
|