Permit Information
Permit NumberBLD18-01695
StatusFinaled
Name KC GARDNER RIVERWOODS LC
Site Address 101 S CAPITOL BLVD
Project NameUS Bank 6th Floor
Customer Number 
ePlanReviewYes
Description
(US BANK BUILDING - 6TH FLOOR - LOBBY & RESTROOM REMODEL) This building is fire sprinklered because it is a high-rise. Permit is to remodel an existing 1,358 lobby and restrooms on the 6th floor of an existing high-rise building. This permit is approved contingent upon adhering to the approved plans on file. Work to include: remove and replace of select restroom countertops and plumbing shroud millwork at the sinks, removal and replace select floor and wall finish, select new restroom light fixtures, electrical work and interior finishes in compliance with chapter 8 of the 2012 IBC. This building is fully fire sprinklered any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 1/7/20191/8/2019 DONE
mailed 1-11-19
First Notice11/21/201811/21/201812/28/2018 DONE
DetailsMike Jordan
emailed in 12-27-18
Print Statement  12/28/2018 DONE
Letter of compliance/Occupancy  11/26/2018 DONE
BLD-Final11/20/201811/21/201811/21/2018APASS
DetailsMike Jordan
Larin Phone #: ###-####
DOC - Permit Finaled11/21/201811/21/201811/21/2018PPASS
DetailsMike Jordan
FIRE-Final Inspection10/5/201810/5/201810/5/2018PPASS
DetailsJim Page
Final life fire safety inspection for area of work complete.

Lauren Phone #: ###-####
Issue PAID IN FULL permit  6/8/2018 DONE
Inspection Record Card- Bld  6/8/2018 DONE
Plan assigned to (JG)5/24/20185/24/20186/1/2018 PASS
DetailsJavier Guzman
5/30 L1 US Bank 6th Floor Common Areas ePlan**
Routing - PLAN CHECK5/24/2018 6/1/2018 PASS
DetailsJavier Guzman
1st review completed  6/1/2018 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  6/1/2018 DONE
Permit Ready to Issue  6/1/2018 DONE
DetailsChristina Prado
Need
Cert of Value from GC (306 in eplan is signed by architect) - met
Intake Approval  5/24/2018 PASS
DetailsJavier Guzman
Intake Approval  5/16/2018 FAIL
DetailsMichael Hanson
This permit has failed prescreen due to the following:
1. Missing signature on stamped plans.
Application received  5/14/2018 DONE
Application submitted via PDS Online on May 14 2018 2:49PM