BLD-Final | 9/12/2019 | 9/12/2019 | 9/12/2019 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Laz Ponce
|
DOC - Permit Finaled | 9/12/2019 | 9/12/2019 | 9/12/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 9/12/2019 | 9/12/2019 | 9/12/2019 | P | DONE |
Brandon Shaw
|
|
|
ACH50- 4.1
|
BLD-Energy code compliance | 7/10/2019 | 7/12/2019 | 7/12/2019 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Josh Benart
|
BLD-Framing/Rough-in | 7/9/2019 | 7/9/2019 | 7/9/2019 | P | PASS |
Brandon Shaw
|
|
|
Ok to insulate...
|
CHANGE STATUS TO (ISS) | | | 6/28/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 6/27/2019 | | |
|
|
|
|
Routing - PLAN CHECK | 6/27/2019 | | 6/27/2019 | | PASS |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 6/27/2019 | | DONE |
|
|
|
PLAN MOD APPROVED
FEES ON EPLAN BLD19-01702
CHANGE TO ISSUED STATUS ON BLD18-01702, BLD18-01###-####6
|
Plan assigned to (M_H) | 6/19/2019 | | 6/27/2019 | | DONE |
Michael Hanson
|
|
|
06/25 plan mod ePlan - Fourplex HVAC loads modified
|
Routing - MECHANICAL | 6/21/2019 | | 6/26/2019 | | PASS |
Troy James
|
|
|
Plan mod changed manual J's
|
Plan Modification Accepted | | | 6/19/2019 | | DONE |
|
|
|
plan mod accepted-changing manual J's-assigned to M_H
|
BLD-Wall Bracing | 6/10/2019 | 6/10/2019 | 6/10/2019 | P | PASS |
Brandon Shaw
|
|
|
Gillermo Phone #: ###-####
|
Change Expiration Date Only | | | 5/24/2019 | | DONE |
Jason Blais
|
|
|
First 180 day issued permit extension approved.
|
BLD-Aging Inspection | 1/25/2019 | 1/25/2019 | 1/25/2019 | | CANC |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Foundation | 9/13/2018 | 9/13/2018 | 9/13/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Footing | 9/7/2018 | 9/7/2018 | 9/7/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
|
Inspection Record Card- Bld | | | 6/29/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 6/29/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 6/18/2018 | | |
|
|
|
|
Routing - PLAN CHECK | 6/18/2018 | | 6/18/2018 | | PASS |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/18/2018 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 6/18/2018 | | DONE |
|
|
|
|
Plan assigned to (M_H) | 5/15/2018 | | 6/18/2018 | | DONE |
Michael Hanson
|
|
|
06/01 Townhouse (4-units) L2 ePlan. 1st review completed - All sheets with structural engineering shall be stamped by registered design professional. MDH
|
Routing - Addressing | 5/15/2018 | | 6/18/2018 | | PASS |
Michael Hanson
|
|
|
Approved per ePlan. MDH
|
Routing - PUBLIC WORKS | 5/15/2018 | | 6/18/2018 | | PASS |
Michael Hanson
|
|
|
Approved per ePlan. MDH
|
Plan Reviewer's activity | | | 6/1/2018 | | DONE |
Michael Hanson
|
|
|
|
1st review completed | | | 6/1/2018 | | FAIL |
Michael Hanson
|
|
|
All sheet with structural engineering shall be stamped by registered design professional. MDH
|
Routing - PLAN CHECK | 5/15/2018 | | 6/1/2018 | | FAIL |
Michael Hanson
|
|
|
All sheet with structural engineering shall be stamped by registered design professional. MDH
|
Route to Impact Fee Review | 5/15/2018 | 5/18/2018 | 5/16/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 5/15/2018 | | 5/16/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 5/15/2018 | | 5/16/2018 | | PASS |
Katelyn Menuge
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/15/2018 | | DONE |
|
|
|
|
Intake Approval | | | 5/15/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/15/2018 | | DONE |
|
|
|
|
Application received | | 5/15/2018 | | | |
|
|
|
|