BLD-Final | 1/29/2019 | 1/30/2019 | 1/30/2019 | A | PASS |
Jim Sly
|
|
|
Karen Phone #: ###-####
|
DOC - Permit Finaled | 1/30/2019 | 1/30/2019 | 1/30/2019 | P | PASS |
Jim Sly
|
|
|
|
BLD-Energy code compliance | 9/17/2018 | 9/18/2018 | 9/18/2018 | P | PASS |
Jim Sly
|
|
|
Bart Phone #: ###-####
|
BLD-Framing/Rough-in | 9/10/2018 | 9/13/2018 | 9/13/2018 | A | PASS |
Jim Sly
|
|
|
Bart Phone #: ###-####
|
BLD-Conference | 8/22/2018 | 8/23/2018 | 8/23/2018 | A | PASS |
Jim Sly
|
|
|
Bart-would like it at 8:00 am Phone #: ###-####
|
BLD-Wall Bracing | 7/16/2018 | 7/17/2018 | 7/17/2018 | A | PASS |
Mike Jordan
|
|
|
Bart Phone #: ###-####
|
OVERRIDE | | | 6/21/2018 | | |
|
|
|
|
Routing Walk-In (BLD) | 6/21/2018 | 6/21/2018 | 6/21/2018 | A | PASS |
Christina Prado
|
|
|
|
Routing - PLAN CHECK | 6/21/2018 | | 6/21/2018 | | PASS |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 6/21/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 6/21/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/21/2018 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 6/21/2018 | | DONE |
|
|
|
|
BLD-Foundation | 6/18/2018 | 6/19/2018 | 6/19/2018 | A | PASS |
Mike Jordan
|
|
|
Dave--late morning Phone #: ###-####
|
BLD-Footing | 6/15/2018 | 6/18/2018 | 6/18/2018 | A | PART |
Mike Jordan
|
|
|
Dave Phone #: ###-####. Exterior perimeter footings 8x16. Interior footings for floor only 12x8. ok to place concrete. Noted that existing footing was not suitable for construction. Existing home has been demolished. Contractor will need to modify scope of work and plans to reflect new construction.
|
Issue PAID IN FULL permit | | | 5/18/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 5/17/2018 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 5/15/2018 | 5/15/2018 | 5/17/2018 | | PASS |
Josh Bogle
|
|
|
1st done - remodel/addition, energy & bracing issues
|
Telephone call | | | 5/17/2018 | | DONE |
|
|
|
Spoke with Bart informing him that this permit is ready, the fee amount due and would need to know who the RP will be
|
Routing - PLAN CHECK | 5/17/2018 | | 5/17/2018 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 5/17/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 5/17/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/17/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 5/17/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/15/2018 | | 5/16/2018 | | FAIL |
Josh Bogle
|
|
|
|
1st review completed | | | 5/16/2018 | | FAIL |
Josh Bogle
|
|
|
|
Routing Walk-In (Zoning) | 5/15/2018 | 5/15/2018 | 5/15/2018 | A | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 5/15/2018 | 5/15/2018 | 5/15/2018 | A | PASS |
Josh Bogle
|
|
|
took in as a level 2
|
Routing - MECHANICAL | 5/15/2018 | | 5/15/2018 | | PASS |
Troy James
|
|
|
|
Application received | | 5/15/2018 | | | |
|
|
|
|