BLD-Final | 11/13/2018 | 11/13/2018 | 11/13/2018 | P | PASS |
Brandon Shaw
|
|
|
Jim Phone #: ###-####
|
DOC - Permit Finaled | 11/13/2018 | 11/13/2018 | 11/13/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 11/13/2018 | 11/13/2018 | 11/13/2018 | P | DONE |
Brandon Shaw
|
|
|
ACH50- 4.26
|
BLD-Energy code compliance | 8/13/2018 | 8/14/2018 | 8/14/2018 | A | PASS |
Dave Hannah
|
|
|
Jim Phone #: ###-####
|
BLD-Framing/Rough-in | 8/9/2018 | 8/10/2018 | 8/10/2018 | A | PASS |
Dave Hannah
|
|
|
James Birdsall ###-####
|
BLD-Framing/Rough-in | 8/7/2018 | 8/8/2018 | 8/8/2018 | A | NR |
Dave Hannah
|
|
|
Jim Phone #: ###-#### needs air seal
|
Plan Modification Accepted | | | 8/1/2018 | | DONE |
|
|
|
New manual j report
|
Routing - MECHANICAL | 8/1/2018 | | 8/1/2018 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Wall Bracing | 7/23/2018 | 7/23/2018 | 7/24/2018 | P | PASS |
Dave Hannah
|
|
|
Jim Phone #: ###-####
|
Inspection Record Card- Bld | | | 7/17/2018 | | DONE |
|
|
|
|
BLD-Foundation | 6/27/2018 | 6/28/2018 | 6/28/2018 | P | PASS |
Dave Hannah
|
|
|
Dane Phone #: ###-####
|
BLD-Footing | 6/26/2018 | 6/27/2018 | 6/27/2018 | P | NR |
Dave Hannah
|
|
|
Dane Phone #: ###-####
|
BLD-Footing | 6/25/2018 | 6/26/2018 | 6/27/2018 | P | PART |
Jim Sly
|
|
|
Dane Phone #: ###-#### No strings pulled for property lines. Hubs in place.......called Dane.....He is confident that placement of footing is in the right location. I told him "pour at own risk".
|
Issue PAID IN FULL permit | | | 6/21/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 6/20/2018 | | |
|
|
|
|
Inspection Record Card- Bld | | | 6/20/2018 | | DONE |
|
|
|
|
Telephone call | | | 6/20/2018 | | DONE |
Christina Prado
|
|
|
called Robert to advise permit is ready and gave fees due
|
Routing - PLAN CHECK | 6/20/2018 | | 6/20/2018 | | PASS |
Michael Hanson
|
|
|
|
1st review completed | | | 6/20/2018 | | DONE |
Michael Hanson
|
|
|
|
Case Summary (BLD) | | | 6/20/2018 | | DONE |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/20/2018 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 6/20/2018 | | DONE |
|
|
|
met
|
Plan assigned to (M_H) | 5/15/2018 | | 6/20/2018 | | DONE |
Michael Hanson
|
|
|
05/28 sfd L1 paper. 1st review completed - Energy, Structural, design criteria deficiencies. MDH
|
Plan resubmittals received | | | 6/19/2018 | | DONE |
|
|
|
Two copies of full set of plans taken to Mike
|
Routing - PLAN CHECK | 5/17/2018 | | 5/23/2018 | | FAIL |
Michael Hanson
|
|
|
Energy, Structural, design criteria deficiencies. MDH
|
Plan Reviewer's activity | | | 5/23/2018 | | DONE |
Michael Hanson
|
|
|
|
1st review completed | | | 5/23/2018 | | FAIL |
Michael Hanson
|
|
|
Energy, Structural, design criteria deficiencies. MDH
|
Routing - MECHANICAL | 5/16/2018 | | 5/17/2018 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 5/15/2018 | 5/18/2018 | 5/16/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PLANNING | 5/15/2018 | | 5/16/2018 | | PASS |
Colleen T Carroll
|
|
|
|
Routing - Addressing | 5/15/2018 | | 5/15/2018 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 5/15/2018 | | 5/15/2018 | | PASS |
Morgan Webb
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/15/2018 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/15/2018 | | DONE |
|
|
|
|
Intake Approval | | | 5/15/2018 | | PASS |
|
|
|
|
Application received | | 5/15/2018 | | | |
|
|
|
|