Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD18-01710
StatusFinaled
Name KEY2 HOMES LLC
Site Address 3003 W MOORE ST
Project Name 
Customer Number 
ePlanReviewNo
Description
***Prescriptive component energy approach*** Permit for the construction of a new 2008 sq. ft., two story (first story 1066 sq. ft., second story 942 sq. ft.) single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 54 sq. ft. of covered patio/porch and a 413 sq. ft. attached garage per the approved plans and any notations. R-2 zoning and setbacks per planning. MDH
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/13/201811/13/201811/13/2018PPASS
DetailsBrandon Shaw
Jim Phone #: ###-####
DOC - Permit Finaled11/13/201811/13/201811/13/2018PPASS
DetailsBrandon Shaw
BLD-Blower Door Test Results11/13/201811/13/201811/13/2018PDONE
DetailsBrandon Shaw
ACH50- 4.26
BLD-Energy code compliance8/13/20188/14/20188/14/2018APASS
DetailsDave Hannah
Jim Phone #: ###-####
BLD-Framing/Rough-in8/9/20188/10/20188/10/2018APASS
DetailsDave Hannah
James Birdsall ###-####
BLD-Framing/Rough-in8/7/20188/8/20188/8/2018ANR
DetailsDave Hannah
Jim Phone #: ###-#### needs air seal
Plan Modification Accepted  8/1/2018 DONE
New manual j report
Routing - MECHANICAL8/1/2018 8/1/2018 PASS
DetailsTroy James
resubmitted manual j report
BLD-Wall Bracing7/23/20187/23/20187/24/2018PPASS
DetailsDave Hannah
Jim Phone #: ###-####
Inspection Record Card- Bld  7/17/2018 DONE
BLD-Foundation6/27/20186/28/20186/28/2018PPASS
DetailsDave Hannah
Dane Phone #: ###-####
BLD-Footing6/26/20186/27/20186/27/2018PNR
DetailsDave Hannah
Dane Phone #: ###-####
BLD-Footing6/25/20186/26/20186/27/2018PPART
DetailsJim Sly
Dane Phone #: ###-####
No strings pulled for property lines. Hubs in place.......called Dane.....He is confident that placement of footing is in the right location. I told him "pour at own risk".
Issue PAID IN FULL permit  6/21/2018 DONE
OVERRIDE  6/20/2018  
Inspection Record Card- Bld  6/20/2018 DONE
Telephone call  6/20/2018 DONE
DetailsChristina Prado
called Robert to advise permit is ready and gave fees due
Routing - PLAN CHECK6/20/2018 6/20/2018 PASS
DetailsMichael Hanson
1st review completed  6/20/2018 DONE
DetailsMichael Hanson
Case Summary (BLD)  6/20/2018 DONE
DetailsMichael Hanson
PLANS/APPL TAKEN TO FRONT DESK  6/20/2018 DONE
DetailsMichael Hanson
Permit Ready to Issue  6/20/2018 DONE
met
Plan assigned to (M_H)5/15/2018 6/20/2018 DONE
DetailsMichael Hanson
05/28 sfd L1 paper. 1st review completed - Energy, Structural, design criteria deficiencies. MDH
Plan resubmittals received  6/19/2018 DONE
Two copies of full set of plans taken to Mike
Routing - PLAN CHECK5/17/2018 5/23/2018 FAIL
DetailsMichael Hanson
Energy, Structural, design criteria deficiencies. MDH
Plan Reviewer's activity  5/23/2018 DONE
DetailsMichael Hanson
1st review completed  5/23/2018 FAIL
DetailsMichael Hanson
Energy, Structural, design criteria deficiencies. MDH
Routing - MECHANICAL5/16/2018 5/17/2018 PASS
DetailsTroy James
Route to Impact Fee Review5/15/20185/18/20185/16/2018 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - PLANNING5/15/2018 5/16/2018 PASS
DetailsColleen T Carroll
Routing - Addressing5/15/2018 5/15/2018 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS5/15/2018 5/15/2018 PASS
DetailsMorgan Webb
Plans ACCEPTED BY PLAN TECH  5/15/2018 DONE
Recd Pcfee & Taken To Pln CK  5/15/2018 DONE
Intake Approval  5/15/2018 PASS
Application received 5/15/2018