BLD-Final | 3/20/2019 | 3/20/2019 | 3/20/2019 | P | PASS |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 3/20/2019 | 3/20/2019 | 3/20/2019 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 3/19/2019 | 3/20/2019 | 3/20/2019 | A | NR |
Jim Storey
|
|
|
please call for access Phone #: ###-#### open plm permit
|
BLD-Conference | 3/7/2019 | 3/7/2019 | 3/7/2019 | P | DONE |
Jim Sly
|
|
|
Saki // Stairs Phone #: ###-####
|
BLD-Energy code compliance | 10/30/2018 | 11/1/2018 | 11/1/2018 | A | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Tyler Olson
|
BLD-Framing/Rough-in | 10/30/2018 | 10/31/2018 | 10/31/2018 | P | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Tyler Olson
|
BLD-Framing/Rough-in | 10/30/2018 | 11/1/2018 | 10/30/2018 | A | CANC |
Jim Sly
|
|
|
Phone #: ###-#### >> Inspection requested via web by Tyler Olson Inspection cancelled from web by: Tyler Olson
|
BLD-Framing/Rough-in | 10/26/2018 | 10/29/2018 | 10/29/2018 | P | PART |
Jim Sly
|
|
|
Tyler Olsen Phone #: ###-####
|
Routing - MECHANICAL | 10/1/2018 | | 10/1/2018 | | PASS |
Troy James
|
|
|
|
BLD-Wall Bracing | 9/13/2018 | 9/14/2018 | 9/14/2018 | A | PASS |
Jim Storey
|
|
|
Tyler Phone #: ###-####
|
BLD-Conference | 8/27/2018 | 8/28/2018 | 8/28/2018 | A | PASS |
Jim Sly
|
|
|
Tyler Phone #: ###-####
|
BLD-Foundation | 7/23/2018 | 7/24/2018 | 7/24/2018 | A | PASS |
Jim Sly
|
|
|
Matt Phone #: ###-####
|
BLD-Footing | 7/19/2018 | 7/20/2018 | 7/20/2018 | A | PASS |
Jim Sly
|
|
|
Matt Phone #: ###-####
|
BLD-Footing | 7/12/2018 | 7/13/2018 | 7/13/2018 | P | NR |
Jim Sly
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo Lira
|
Issue PAID IN FULL permit | | | 6/22/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/22/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 6/6/2018 | | |
|
|
|
|
Telephone call | | | 6/6/2018 | | DONE |
|
|
|
Spoke with Dan informing him that this permit is ready, the fee amount due for issuance and that a RP will be needed before we can issue any part of the permit
|
Inspection Record Card- Bld | | | 6/6/2018 | | DONE |
|
|
|
|
Plan assigned to (M_H) | | | 6/6/2018 | | DONE |
Michael Hanson
|
|
|
05/28 sfd L1 paper. 1st review completed - Missing wall bracing information. MDH
|
Plan resubmittals received | | | 6/6/2018 | | DONE |
|
|
|
2 sets of resubmittals cals-Brian McGowan has them
|
Routing - PLAN CHECK | 6/6/2018 | | 6/6/2018 | | PASS |
Michael Hanson
|
|
|
|
Case Summary (BLD) | | | 6/6/2018 | | DONE |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/6/2018 | | DONE |
Michael Hanson
|
|
|
|
Inspection Record Card- Bld | | | 6/6/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/6/2018 | | DONE |
|
|
|
Need
RP
|
Routing - PLAN CHECK | 5/31/2018 | | 5/31/2018 | | FAIL |
Michael Hanson
|
|
|
Missing wall bracing for single car Garage and portal frame details.
|
Plan resubmittals received | | | 5/25/2018 | | DONE |
|
|
|
received two copies of wall bracing calcs; taken to BGM
|
Plan Reviewer's activity | | | 5/24/2018 | | DONE |
Michael Hanson
|
|
|
|
1st review completed | | | 5/24/2018 | | FAIL |
Michael Hanson
|
|
|
Missing wall bracing information. MDH
|
Routing - PLAN CHECK | 5/17/2018 | | 5/24/2018 | | FAIL |
Michael Hanson
|
|
|
Missing wall bracing information. MDH
|
Routing - MECHANICAL | 5/21/2018 | | 5/21/2018 | | PASS |
Troy James
|
|
|
Owner request the mechanical to be defferred. An approved manual j report is required before any mechanical work is to be performed.
|
Route to Impact Fee Review | 5/15/2018 | 5/18/2018 | 5/16/2018 | | PASS |
Eric Bilimoria
|
|
|
Can not find the parcel in the GIS system, the building permit may have been assigned a temporary parcel number
|
Routing - MECHANICAL | | | 5/16/2018 | | FAIL |
|
|
|
Need an ACCA report, or Mechanical plans stamped by a Idaho licensed Engineer submitted. We also need the Equipment manufactures make and model number included on the report, or the plans whichever is submitted for review.
|
Routing - PLANNING | 5/15/2018 | | 5/16/2018 | | PASS |
Sue Cummings
|
|
|
see minor redline. A 3 ft. setback is require for the drive area.
|
Routing - Addressing | 5/15/2018 | | 5/15/2018 | | PASS |
Laura Hunter
|
|
|
Received the land parcel record form from County showing the ROS was recorded.
|
Routing - PUBLIC WORKS | 5/15/2018 | | 5/15/2018 | | PASS |
Morgan Webb
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/15/2018 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/15/2018 | | DONE |
|
|
|
|
Intake Approval | | | 5/15/2018 | | PASS |
|
|
|
|
Application received | | 5/15/2018 | | | |
|
|
|
|