BLD-Final | 12/12/2018 | 12/14/2018 | 12/14/2018 | P | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Tim Rawlings
|
DOC - Permit Finaled | 12/14/2018 | 12/14/2018 | 12/14/2018 | P | PASS |
Tony Young
|
|
|
|
BLD-Blower Door Test Results | 12/12/2018 | 12/14/2018 | 12/14/2018 | P | DONE |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Tim Rawlings/// 4.3
|
BLD-Final | 12/11/2018 | 12/12/2018 | 12/12/2018 | A | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Tim Rawlings,, ok ,, just needs blower door test results
|
BLD-Framing/Rough-in | 9/14/2018 | 9/17/2018 | 9/17/2018 | A | PASS |
Tony Young
|
|
|
Framing re-inspection on 2 items. Inspector said it was OK to Insulate. Thanks Phone #: ###-#### Inspection requested via web by Tim Rawlings
|
BLD-Energy code compliance | 9/14/2018 | 9/17/2018 | 9/17/2018 | A | PASS |
Tony Young
|
|
|
Inspection requested via web by Tim Rawlings
|
BLD-Framing/Rough-in | 9/11/2018 | 9/12/2018 | 9/12/2018 | A | PASS |
Brandon Shaw
|
|
|
Strap needed at break in double top plate... Squash block and full bearing colunm at beam in master bedroom...
OK to insulate
|
Plan Modification Accepted | | | 8/10/2018 | | DONE |
|
|
|
New manual j report
|
Routing - MECHANICAL | 8/10/2018 | | 8/10/2018 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Wall Bracing | 7/25/2018 | 7/26/2018 | 7/26/2018 | A | PART |
Tony Young
|
|
|
Don Phone #: ###-####,, exterior ok after a few minor fixes
|
BLD-Foundation | 6/11/2018 | 6/12/2018 | 6/12/2018 | A | PASS |
Tony Young
|
|
|
Matt Phone #: ###-####
|
BLD-Footing | 6/11/2018 | 6/11/2018 | 6/11/2018 | A | PASS |
Jim Storey
|
|
|
Phone #: 2088637551 >> Inspection requested via mobile web by Robb
|
BLD-Foundation | 6/11/2018 | 6/11/2018 | 6/11/2018 | A | CANC |
Tony Young
|
|
|
Phone #: 2088637551 >> Inspection requested via mobile web by Robb Inspection cancelled via mobile web on Monday, June 11, 2018.
|
OVERRIDE | | | 5/25/2018 | | |
|
|
|
|
Plan assigned to (RDP) | 5/17/2018 | 5/17/2018 | 5/25/2018 | | DONE |
Rob Patrick
|
|
|
5/30 sfd L1 Paper...5/22 Failed: Corrections Required
|
Inspection Record Card- Bld | | | 5/25/2018 | | DONE |
|
|
|
|
Telephone call | | | 5/25/2018 | | DONE |
|
|
|
called and told Tim permit is ready and fees due
|
Issue PAID IN FULL permit | | | 5/25/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/25/2018 | | 5/25/2018 | | PASS |
Rob Patrick
|
|
|
|
Case Summary (BLD) | | | 5/25/2018 | | DONE |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/25/2018 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 5/25/2018 | | DONE |
Christina Prado
|
|
|
All requirements met
|
Plan resubmittals received | | | 5/24/2018 | | DONE |
|
|
|
received two copies of plan sheets S-1.0 & E-1.0; take to Rob Patrick
|
Routing - MECHANICAL | 5/23/2018 | | 5/23/2018 | | PASS |
Troy James
|
|
|
|
1st review completed | | | 5/22/2018 | | FAIL |
Rob Patrick
|
|
|
Update Design Criteria; Need Electrical sheet with lighting, smoke/CO2 detectors, switching, fans.
|
Routing - PLAN CHECK | 5/21/2018 | | 5/22/2018 | | FAIL |
Rob Patrick
|
|
|
Update Design Criteria; Need Electrical sheet with lighting, smoke/CO2 detectors, switching, fans.
|
Routing - MECHANICAL | 5/17/2018 | | 5/21/2018 | | FAIL |
Troy James
|
|
|
sent corrections to dustin mori and don wheeler
|
Routing - PLANNING | 5/17/2018 | | 5/21/2018 | | PASS |
Leon Letson
|
|
|
Irrigation issues have been resolved with the Lateral Manager in the area. Carl Morris ###-####. Driveway must be paved from common driveway to garage.
|
Route to Impact Fee Review | 5/17/2018 | 5/20/2018 | 5/18/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Addressing | 5/17/2018 | | 5/17/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 5/17/2018 | | 5/17/2018 | | PASS |
Morgan Webb
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/17/2018 | | DONE |
|
|
|
|
Intake Approval | | | 5/17/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/17/2018 | | DONE |
|
|
|
|
Intake Approval | | | 5/15/2018 | | FAIL |
Christina Prado
|
|
|
Need:
Cross section
Manual J,D & S
|
Application received | | 5/15/2018 | | | |
|
|
|
|