BLD-Final | 3/19/2019 | 3/22/2019 | 3/22/2019 | P | DONE |
Tony Young
|
|
|
Call ahead // Kip Phone #: ###-####
|
DOC - Permit Finaled | 3/22/2019 | 3/22/2019 | 3/22/2019 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 3/14/2019 | 3/19/2019 | 3/19/2019 | A | PEND |
Tony Young
|
|
|
Call ahead // Kip Phone #: ###-####,, needs SD outside of bedrooms,, no plans on site
|
BLD-Conference | 6/20/2018 | 6/21/2018 | 6/21/2018 | A | PASS |
Jim Storey
|
|
|
Call 20 mins ahead- Edwards Phone #: ###-#### ok for final at finsh need to check for sd/co dedection.
|
Routing Walk-In (Zoning) | 5/15/2018 | 5/15/2018 | 5/15/2018 | P | PASS |
Jeff Lowe
|
|
|
no ADU propsoed not approved with this permit. No 220 allowed. all internal connections must remain intact
|
Routing Walk-In (BLD) | 5/15/2018 | 5/15/2018 | 5/15/2018 | P | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 5/15/2018 | | 5/15/2018 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 5/15/2018 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 5/15/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 5/15/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/15/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 5/15/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 5/15/2018 | | DONE |
|
|
|
|
Application received | | 5/15/2018 | | | |
|
|
|
|