Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberBLD18-01729
StatusFinaled
Name CANYON CREST HOMES
Site Address 4023 N EYRIE WAY
Project Name11-4 Eyrie Canyon
Customer Number 
ePlanReviewYes
Description
Permit for the construction of a new 3,272 sq. ft., two story (first story 2,137 sq. ft., below grade 1,135 sq. ft.) single family dwelling with 4 bedrooms, 4 and a half bathrooms, approximately 669 sq. ft. of covered patio/porch and a 917 sq. ft. attached garage per the approved plans and any notations. A-1 zoning and setbacks per planning.

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call 208-608-7070 to schedule an inspection.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/18/20197/18/20197/18/2019PPASS
DetailsBrandon Shaw
garage keycode 3283 Phone #: ###-#### Inspection requested via web by David Wipper
DOC - Permit Finaled7/18/20197/18/20197/18/2019PPASS
DetailsBrandon Shaw
BLD-Blower Door Test Results7/18/20197/18/20197/18/2019PDONE
DetailsBrandon Shaw
ACH50- 4.1
PubWorks Occupancy Approval7/18/20197/18/20197/18/2019 DONE
DetailsMelissa Jannusch
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
BLD-Other1/3/20191/4/20191/4/2019APASS
DetailsTony Young
soffit // Larry Phone #: ###-####,, work in progress
BLD-Energy code compliance12/20/201812/21/201812/21/2018PPASS
DetailsTony Young
Larry Phone #: ###-####
BLD-Framing/Rough-in12/18/201812/19/201812/19/2018APASS
DetailsJim Sly
Larry Phone #: ###-####
Plan Modification Accepted  12/6/2018 DONE
New manual j report
Routing - MECHANICAL12/6/2018 12/6/2018 PASS
DetailsTroy James
resubmitted manual j report
BLD-Wall Bracing11/29/201812/3/201812/3/2018APASS
DetailsTony Young
Larry Phone #: ###-####
BLD-Foundation10/9/201810/10/201810/10/2018APART
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Ben Sears,, work in progress,, ok
BLD-Foundation10/9/201810/9/201810/9/2018PPART
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Ben Sears,, work has been in progress,, ok,, no one around due to rain
BLD-Footing10/3/201810/4/201810/4/2018APART
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Ben Sears,, work in progress,, ok
PubWorks Subgrade Approval10/4/201810/4/201810/4/2018 DONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
BLD-Foundation9/5/20189/6/20189/6/2018APART
DetailsJim Sly
Request early Inspection hope to pour at 10. Phone #: ###-#### Inspection requested via web by Ben Sears
Main House walls OK
BLD-Footing9/4/20189/4/20189/4/2018APART
DetailsTony Young
Request a late morning to early afternoon inspection Phone #: ###-#### Inspection requested via web by Ben Sears,, basement footings, work in progress,, ok
PubWorks Subgrade Approval8/31/20188/31/20188/31/2018 DONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
Inspection Record Card- Bld  8/22/2018 DONE
Inspection Record Card- Bld  8/21/2018 DONE
Issue PAID IN FULL permit  8/21/2018 DONE
OVERRIDE  8/9/2018  
Routing - FIRE8/9/20188/9/20188/9/2018 PASS
DetailsTim Frost
Fire flow information of 1500 gpm was provided which is adequate.
Plan assigned to (RDP)7/18/20187/18/20188/9/2018 DONE
DetailsRob Patrick
08/06 sfd L2 ePlan...7/30 Failed: 8/8 CORRECTIONS MADE, WAITING FOR FIRE TO REVIEW.
Routing - PLAN CHECK8/9/2018 8/9/2018 PASS
DetailsRob Patrick
PLANS/APPL TAKEN TO FRONT DESK  8/9/2018 DONE
DetailsRob Patrick
Permit Ready to Issue  8/9/2018 DONE
Routing - FIRE8/8/20188/8/20188/8/2018 FAIL
DetailsTim Frost
Fire flow information still has not been provided.
1st review completed  7/30/2018 FAIL
DetailsRob Patrick
Corrections Required
Routing - PLANNING7/18/2018 7/30/2018 PASS
DetailsNicolette Womack
Driveway width shall not exceed 33' in the front yard setback.
Routing - PLAN CHECK7/18/2018 7/30/2018 FAIL
DetailsRob Patrick
Corrections Required
Routing PW Grading-Hillside7/18/2018 7/20/2018 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.

Route to Impact Fee Review7/18/20187/21/20187/19/2018 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - FIRE7/18/20187/18/20187/19/2018 FAIL
DetailsTim Frost
Fire flow required
Routing - Addressing7/18/2018 7/18/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS7/18/2018 7/18/2018 PASS
DetailsMorgan Webb
Routing - Erosion and Sediment7/18/2018 7/18/2018 PASS
DetailsMichael Zawacki
Foothills lot, site prep inspection required.
Routing - MECHANICAL7/18/2018 7/18/2018 PASS
DetailsTroy James
Intake Approval  7/18/2018 PASS
Plans ACCEPTED BY PLAN TECH  7/18/2018 DONE
Recd Pcfee & Taken To Pln CK  7/18/2018 DONE
Intake Approval  5/23/2018 FAIL
Project will require a CAT II Hillside application prior to acceptance of the building permit application. Application #114 will need to be filled out and turned in to the Planning & Zoning counter at city hall with the application fee. Once the application has been approved by P&Z please upload the approval letter and then this building permit case can be routed for approval. Melissa Jannusch ###-####.
Intake Approval  5/21/2018 FAIL
DetailsChristina Prado
Project will require a CAT II Hillside application prior to acceptance of the building permit application. Application #114 will need to be filled out and turned in to the Planning & Zoning counter at city hall with the application fee. Once the application has been approved by P&Z please upload the approval letter and then this building permit case can be routed for approval. Melissa Jannusch ###-####.
Intake Approval  5/17/2018 FAIL
Please show existing contours on the grading and drainage plans with the proposed grading contours over the top. I cannot tell how much cut or fill is proposed with the current grading plan and therefore cannot determine if it is a CAT I or a CAT II hillside permit. Please call me if you want to discuss more. --Melissa Jannusch ###-####

1.Update to 2015 IRC
2. (cross section is on DWG Section A) Please provided a cross section of the whole building.
Application received  5/16/2018 DONE
Application submitted via PDS Online on May 16 2018 10:10AM