BLD-Final | 9/24/2019 | 9/25/2019 | 9/25/2019 | A | DONE |
Tony Young
|
|
|
darin Phone #: ###-####,, ok after making steps per code,, minor fix
|
DOC - Permit Finaled | 9/25/2019 | 9/25/2019 | 9/25/2019 | P | PASS |
Tony Young
|
|
|
|
BLD-Framing/Rough-in | 10/24/2018 | 10/26/2018 | 10/26/2018 | P | PART |
Tony Young
|
|
|
Darin Phone #: ###-####,, ok thus far,, needs tie backs to the house,, needs toe nails on south
|
BLD-Foundation | 10/2/2018 | 10/3/2018 | 10/3/2018 | P | DEFR |
Brandon Shaw
|
|
|
Per-framing Plans call for 2"x12" ledger attached to rim board, 16' plus to be attached to 4"x12" beam with 4"x4" posts at 4' oc. Need Engineering and/or beam calculations to verify existing beam will hold additional loading...
|
BLD-Footing | 9/4/2018 | 9/5/2018 | 9/5/2018 | A | PART |
Tony Young
|
|
|
Please call for access instructions - Darren Phone #: ###-####,, work in progress,, ok
|
PubWorks Subgrade Approval | 8/10/2018 | 8/10/2018 | 8/10/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
OVERRIDE | | | 8/9/2018 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 6/14/2018 | 6/14/2018 | 8/9/2018 | | PASS |
Josh Bogle
|
|
|
1st done - Hillside deck, needs engineering for footngs & lateral
|
Issue PAID IN FULL permit | | | 8/9/2018 | | DONE |
|
|
|
|
(F) Reprint permit | | | 8/9/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 8/9/2018 | | 8/9/2018 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 8/9/2018 | | |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 8/9/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/9/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 8/9/2018 | | DONE |
|
|
|
|
1st review completed | | | 6/15/2018 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 6/14/2018 | | 6/15/2018 | | FAIL |
Josh Bogle
|
|
|
|
Routing Walk-In (BLD) | 6/14/2018 | 6/14/2018 | 6/14/2018 | A | PASS |
Josh Bogle
|
|
|
took in - Hillside deck
|
Routing PW Grading-Hillside | 6/14/2018 | | 6/14/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
|
Routing - Erosion and Sediment | 6/14/2018 | | 6/14/2018 | | PASS |
Andy J. Long
|
|
|
Homeowner RP. ESC general permit issued.
|
Routing Walk-In (BLD) | 6/1/2018 | 6/1/2018 | 6/1/2018 | P | FAIL |
Josh Bogle
|
|
|
we had a conversation about Hillside/WUI/ESC
|
Routing Walk-In (Zoning) | 5/16/2018 | 5/16/2018 | 5/16/2018 | A | FAIL |
Katelyn Menuge
|
|
|
In Hillside
|
Routing Walk-In (BLD) | 5/16/2018 | 5/16/2018 | 5/16/2018 | A | DONE |
Katelyn Menuge
|
|
|
|
1st review completed | | | 5/16/2018 | | FAIL |
Brian McGowan
|
|
|
Will need engineering for footings and for structure if they replace the deck. May use cable railing which will require engineering as well.
|
Routing - PLAN CHECK | 5/16/2018 | | 5/16/2018 | | FAIL |
Brian McGowan
|
|
|
Will need engineering for footings and for structure if they replace the deck. May use cable railing which will require engineering as well.
|
Application received | | 5/16/2018 | | | |
|
|
|
|