Routing - PLANNING | 5/20/2019 | | 5/20/2019 | | PASS |
Sue Cummings
|
|
|
|
BLD-Framing/Rough-in | 1/16/2019 | 1/17/2019 | 1/17/2019 | A | PASS |
Dave Hannah
|
|
|
I would like to meet you onsite, please give me a call at ###-####
Thanks, Jordan Moorhouse ###-#### Phone #: ###-#### Inspection requested via web by Drew Moorhouse
|
BLD-Framing/Rough-in | 8/7/2018 | 8/8/2018 | 8/8/2018 | P | PASS |
Dave Hannah
|
|
|
We are looking for a framing inspection on the break room/ Lab. Please give me a call if you have any questions at ###-####
Thanks, Jordan Moorhouse McCarter-Moorhouse Phone #: ###-#### Inspection requested via web by Drew Moorhouse
|
Issue PAID IN FULL permit | | | 7/2/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/2/2018 | | DONE |
|
|
|
|
Plan assigned to (RMH) | 6/12/2018 | 6/12/2018 | 6/13/2018 | | PASS |
Javier Guzman
|
|
|
L1 Vision One ePlan**
|
1st review completed | | | 6/13/2018 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/13/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/13/2018 | | DONE |
|
|
|
all met-Need
GC Form
Revised Cert of value
|
Routing - PLAN CHECK | 6/7/2018 | | 6/13/2018 | | PASS |
Javier Guzman
|
|
|
|
Plan assigned to (JG) | 6/7/2018 | 6/7/2018 | 6/12/2018 | | DEFR |
Javier Guzman
|
|
|
L1 Vision One ePlan**
|
Routing - Addressing | 6/7/2018 | | 6/8/2018 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 6/7/2018 | | 6/8/2018 | | PASS |
Rachael Beierle
|
|
|
|
Intake Approval | | | 6/7/2018 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 5/30/2018 | | FAIL |
Michael Hanson
|
|
|
This permit has failed prescreen due to the following:
1. Missing 518 checklist completed and signed.
2. Drawing sheet ID1 and ID2 are the not the minimum 18x24.
3. Drawing sheet ID1 and ID2 are not rotated properly
4. Drawing sheet ID1 and ID2 are not stamped and signed
5. Missing exit signage and emergency lighting - Occ load over 49
6. Missing portable fire extinguisher location - Occ load over 49
Please resolve and resubmit.
|
Application received | | | 5/18/2018 | | DONE |
|
|
|
Application submitted via PDS Online on May 18 2018 1:59PM
|