Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD18-01812
StatusFinaled
Name WOOLF BUILDING INC
Site Address 4730 N DALTON LN
Project Name 
Customer Number 
ePlanReviewNo
Description
Permit for the construction of a new 1534 sq. ft., one story single family dwelling with 3 bedrooms, 2 bathrooms, approximately 162 sq. ft. of covered patio/porch and a 562 sq. ft. attached garage per the approved plans and any notations. Prescriptive Energy Compliance. R-1C zoning and setbacks per planning.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/2/20191/2/20191/2/2019PPASS
DetailsJim Sly
Barb Phone #: ###-####
DOC - Permit Finaled1/2/20191/2/20191/2/2019PPASS
DetailsJim Sly
BLD-Energy code compliance10/18/201810/19/201810/19/2018APASS
DetailsJim Sly
Barb Phone #: ###-####
BLD-Framing/Rough-in10/17/201810/18/201810/18/2018APASS
DetailsJim Sly
Barb Phone #: ###-####
BLD-Wall Bracing9/17/20189/18/20189/18/2018APASS
DetailsJim Sly
Barb Phone #: ###-####
BLD-Foundation6/20/20186/21/20186/22/2018PPASS
DetailsJim Sly
Eric Phone #: ###-####
BLD-Footing6/18/20186/19/20186/19/2018APART
DetailsMike Jordan
Eric Phone #: ###-####. Footing ok. Noted to Eric that footing excavation did not appear deep enough for adequate frost protection. Per Eric, fill is being brought in to raise remainder of lot. Will check on framing.
Issue PAID IN FULL permit  6/7/2018 DONE
OVERRIDE  5/29/2018  
Plan assigned to (RDP) 5/22/20185/29/2018 DONE
DetailsRob Patrick
6/4 sfd L1 Paper...5-24 Failed: Corrections Required
Inspection Record Card- Bld  5/29/2018 DONE
Telephone call  5/29/2018 DONE
called Larry to let know permit is ready know permit is ready-left message on his cell
Plan resubmittals received  5/29/2018 DONE
resubmittals received 2 full sets of drawings-took to Rob P
Routing - PLAN CHECK5/29/2018 5/29/2018 PASS
DetailsRob Patrick
Case Summary (BLD)  5/29/2018 DONE
DetailsRob Patrick
PLANS/APPL TAKEN TO FRONT DESK  5/29/2018 DONE
DetailsRob Patrick
Permit Ready to Issue  5/29/2018 DONE
Routing - PLAN CHECK  5/24/2018 FAIL
Details
Corrections required
Routing - MECHANICAL5/22/2018 5/24/2018 PASS
DetailsTroy James
1st review completed  5/24/2018 FAIL
DetailsRob Patrick
Failed: Corrections required
Route to Impact Fee Review5/22/20185/25/20185/23/2018 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Plans ACCEPTED BY PLAN TECH  5/22/2018 DONE
Intake Approval  5/22/2018 PASS
Recd Pcfee & Taken To Pln CK  5/22/2018 DONE
Routing - PLANNING5/22/2018 5/22/2018 PASS
DetailsSue Cummings
Routing - Addressing5/22/2018 5/22/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS  5/22/2018 PASS
NO CREDIT FOR DEMO. DEMO NEVER CONNECTED. ASSESSMENT AND SFD IMPACT DUE FOR FIRST TIME CONNECTION.
Application received 5/22/2018