BLD-Final | 5/11/2020 | 5/12/2020 | 5/12/2020 | P | PASS |
Tony Young
|
|
|
Eric *screened* Phone #: ###-####
|
DOC - Permit Finaled | 5/12/2020 | 5/12/2020 | 5/12/2020 | P | PASS |
Tony Young
|
|
|
|
BLD-Blower Door Test Results | 5/12/2020 | 5/12/2020 | 5/12/2020 | P | DONE |
Tony Young
|
|
|
Eric *screened* Phone #: ###-####/// 3.99
|
OVERRIDE | | | 5/11/2020 | | |
|
|
|
|
Plan assigned to (RDP) | 4/29/2020 | 4/29/2020 | 5/11/2020 | | DONE |
Rob Patrick
|
|
|
1st Review Complete 05/04 Failed: plan mod
|
Routing - PLAN CHECK | 5/11/2020 | | 5/11/2020 | | PASS |
Rob Patrick
|
|
|
Add 1 hour for review
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/11/2020 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 5/11/2020 | | DONE |
|
|
|
plan mod approved
|
CHANGE STATUS TO (ISS) | | | 5/11/2020 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 4/29/2020 | | 5/4/2020 | | FAIL |
Rob Patrick
|
|
|
Corrections Req'd
|
Routing - PLANNING | 4/29/2020 | | 5/1/2020 | | PASS |
Ted Vanegas
|
|
|
plan mod
|
Plan Modification Accepted | | | 4/29/2020 | | DONE |
|
|
|
Door and window modifications.
|
BLD-Final | 4/14/2020 | 4/15/2020 | 4/15/2020 | A | FAIL |
Tony Young
|
|
|
Screened- Erick Phone #: ###-####// c/n posted,, needs plans,, guard rails on basement stairs, alley window well,, if garage door is on plans, needs energy calcs, tempered glass, if not on plans, need to re-submit for plan review,, garage steps into house per min. code, fire caulking, tempered glass within 24" of door, blower door test results,, etc
|
BLD-Aging Inspection | 4/2/2020 | 4/2/2020 | 4/8/2020 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 4/1/2020 | 4/1/2020 | 4/8/2020 | | PEND |
Tony Young
|
|
|
|
Zoning Approval | 3/31/2020 | 3/31/2020 | 3/31/2020 | | DONE |
Ted Vanegas
|
|
|
|
BLD-Energy code compliance | 11/19/2019 | 11/19/2019 | 11/19/2019 | P | PASS |
Tony Young
|
|
|
Eric Phone #: ###-####
|
BLD-Framing/Rough-in | 11/14/2019 | 11/14/2019 | 11/14/2019 | P | PART |
Dave Hannah
|
|
|
Eric Phone #: ###-#### ok to insulate but needs to fire blcok walls in basement and add a header in bearing wall in basement ground fl strape beam front rm to dbl plate second floor needs to strape dbl top plate and get ok to add load to bottom cord of truss by mec equp
|
Routing - MECHANICAL | 11/13/2019 | | 11/13/2019 | | PASS |
Troy James
|
|
|
Resubmitted manual j report.
|
BLD-Wall Bracing | 10/4/2019 | 10/7/2019 | 10/7/2019 | A | PASS |
Brandon Shaw
|
|
|
Eric Phone #: ###-####
|
BLD-Foundation | 7/8/2019 | 7/8/2019 | 7/8/2019 | P | PASS |
Jim Storey
|
|
|
wall // Surgio Phone #: ###-####
|
BLD-Footing | 7/2/2019 | 7/2/2019 | 7/2/2019 | P | PASS |
Brandon Shaw
|
|
|
See permit BLD18- 0072 for previous inspections- basement footing and foundation... Footing inspection for revised floor plan...
|
Issue PAID IN FULL permit | | | 5/3/2019 | | DONE |
|
|
|
|
Expiration Notice | 4/25/2019 | 5/16/2019 | 4/25/2019 | | DONE |
Brittany Hill
|
|
|
|
Extend Review Timeline | | | 11/27/2018 | | DONE |
|
|
|
1st Approved 180 day extension per Adele. See documents
|
Meeting | | | 10/29/2018 | | DONE |
|
|
|
sent in letter for extension request
|
Expiration Notice | 10/23/2018 | 11/14/2018 | 10/23/2018 | | DONE |
Brittany Hill
|
|
|
|
OVERRIDE | | | 5/29/2018 | | |
|
|
|
|
Plan assigned to (RDP) | 5/22/2018 | 5/22/2018 | 5/29/2018 | | DONE |
Rob Patrick
|
|
|
6/4 sfd L1 Paper
|
Routing - PLAN CHECK | 5/24/2018 | | 5/29/2018 | | PASS |
Rob Patrick
|
|
|
|
1st review completed | | | 5/29/2018 | | DONE |
Rob Patrick
|
|
|
|
Case Summary (BLD) | | | 5/29/2018 | | DONE |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/29/2018 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 5/29/2018 | | DONE |
|
|
|
MET-
Need GC form (Ken did not check box on app)
|
Inspection Record Card- Bld | | | 5/29/2018 | | DONE |
|
|
|
|
Telephone call | | | 5/29/2018 | | DONE |
|
|
|
called and emailed ken permit is ready, fee due and need GC form
|
Routing - MECHANICAL | | | 5/24/2018 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 5/22/2018 | 5/25/2018 | 5/23/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PLANNING | | | 5/23/2018 | | PASS |
|
|
|
|
Routing - Addressing | 5/22/2018 | | 5/23/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | | | 5/23/2018 | | PASS |
|
|
|
EXISTING SERICE TO 1203 18TH IS GOING THROUGH 1812 LOT. EASEMENTS RECOMMENDED IF NOT ALREADY IN PLACE.
|
Plans ACCEPTED BY PLAN TECH | | | 5/22/2018 | | DONE |
|
|
|
|
Intake Approval | | | 5/22/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/22/2018 | | DONE |
|
|
|
|
Application received | | 5/22/2018 | | | |
|
|
|
|