(SMITH + MALEK – US BANK BUILDING - 9TH FLOOR SUITE #930) This building is fire sprinklered because it is a high-rise. Permit to remodel an existing 2,397 sq. ft. on the 9th floor of an existing high-rise building. This permit is approved contingent upon adhering to the approved plans on file. Work to include: construction of select interior non-bearing walls to create (5) offices, a meditation room, a conference room, an IT/storage room, a reception area, a break room and open office area, select new door/door frames, interior windows, select new millwork, new light fixtures, electrical work, plumbing work, mechanical work and interior finishes in compliance with chapter 8 of the 2012 IBC. This building is fully fire sprinklered any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  10/25/2018 DONE
First Notice 9/30/201810/12/2018 DONE
mailed 10-15-18
Print Occupancy Form  9/20/2018 DONE
Permanent Occupancy  9/20/2018 DONE
BLD-Final9/18/20189/19/20189/19/2018APASS
DetailsDave Hannah
Larne Phone #: ###-####
CHANGE STATUS TO (ISS)  9/18/2018 DONE
no BLD final was scheduled, no activity showing permit was finaled. Reopened permit and scheduled final inspection
FIRE-Final Inspection9/6/20189/7/20189/7/2018APASS
DetailsJim Page
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are placed with current inspection tags. Final life fire safety inspection for area of work complete.

Larren Phone #: ###-####
BLD-Framing/Rough-in7/27/20187/27/20187/30/2018PPASS
DetailsDave Hannah
Lerren Phone #: ###-####
Issue PAID IN FULL permit  6/19/2018 DONE
Print Occupancy Form  6/19/2018 DONE
Print Occupancy Form  6/19/2018 DONE
Print Occupancy Form  6/19/2018 DONE
Plan assigned to (JG)5/25/20185/25/20186/13/2018 PASS
DetailsJavier Guzman
6/07 L2 Smith + Malek Suite #910 ePlan
Routing - PLAN CHECK5/25/2018 6/13/2018 PASS
DetailsJavier Guzman
Routing - Addressing5/25/2018 6/13/2018 PASS
DetailsDoug Chausow
signed off in ePlan by PW Addressing Doug Chausow
1st review completed  6/13/2018 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  6/13/2018 DONE
Permit Ready to Issue  6/13/2018 DONE
DetailsChristina Prado
Need - all met
GC Form
Revised Cert of value
Routing - MECHANICAL5/25/2018 6/4/2018 PASS
DetailsTroy James
Routing - PUBLIC WORKS5/25/2018 5/29/2018 PASS
DetailsMorgan Webb
Intake Approval  5/25/2018 PASS
DetailsJavier Guzman
Routing - PLUMBING5/25/2018 5/25/2018 PASS
DetailsBill VanDegrift
per plans and ISPC
Application received  5/23/2018 DONE