BLD-Framing/Rough-in | 6/5/2020 | 6/5/2020 | 6/5/2020 | A | PASS |
Dave Hannah
|
|
|
Conference with Forte on Elevator lobby shafts and cover first floor Linen shaft. Phone #: ###-#### Inspection requested via web by Mike Beeson
|
BLD-Wall cover | 5/28/2020 | 5/28/2020 | 5/28/2020 | P | CANC |
Jim Storey
|
|
|
Pool area cover/ 5th floor Fire assembly/fire caulking Phone #: ###-#### >> Inspection requested via web by Mike Beeson Inspection cancelled from web by: Adam Johnson
|
BLD-Wall cover | 5/18/2020 | 5/19/2020 | 5/19/2020 | A | PASS |
Dave Hannah
|
|
|
Third floor Framing, Front Street. Recap and Review EJ for plumbing assemblies. Possibly review shafts at other areas if complete. Call Adam when heading to site. Thanks. AKJ. Phone #: ###-#### Inspection requested via web by Adam Johnson Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Framing/Rough-in | 5/15/2020 | 5/18/2020 | 5/18/2020 | P | DEFR |
Jim Storey
|
|
|
Third floor Framing, Front Street. Recap and Review EJ for plumbing assemblies. Possibly review shafts at other areas if complete. Call Adam when heading to site. Thanks. AKJ. Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 3/4/2020 | 3/4/2020 | 3/4/2020 | P | DONE |
Brandon Shaw
|
|
|
Walk with Dave, Adam and Mike B, follow up to exit signage requirements of parking garage structure. Requesting for later in afternoon, Call adam when heading to site. AKJ ###-####. Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Framing/Rough-in | 3/4/2020 | 3/4/2020 | 3/4/2020 | A | PART |
Brandon Shaw
|
|
|
Conformation of roofing structural framing pre TPO installation. Want to walk L7 roof
|
BLD-Conference | 2/24/2020 | 2/25/2020 | 2/25/2020 | P | DONE |
Dave Hannah
|
|
|
Meet to pre-walk parking garage. Discuss TCO items, overall general items as we progress to final walks. Call Adam In advance. ###-####. Thanks, AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
|
FIRE-Conference | 2/24/2020 | 2/25/2020 | 2/25/2020 | P | DONE |
Jim Page
|
|
|
Fire conference complete.
Meet to pre-walk parking garage. Discuss TCO items, overall general items as we progress to final walks. Call Adam In advance. ###-####. Thanks, AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 1/30/2020 | 2/3/2020 | 2/3/2020 | A | DONE |
Dave Hannah
|
|
|
Call Adam when heading to site. Meet to review Garage TCO Plan. Need to look at NW stair tower Egress. Thanks. AKJ ###-#### Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Framing/Rough-in | 1/18/2020 | 1/21/2020 | 1/21/2020 | A | DONE |
Dave Hannah
|
|
|
2 hour floor to ceiling assembly mock up, for review. Phone #: ###-#### Inspection requested via web by Mike Beeson
|
BLD-Conference | 1/9/2020 | 1/9/2020 | 1/9/2020 | P | DONE |
Dave Hannah
|
|
|
adam Phone #: ###-####
|
BLD-Framing/Rough-in | 11/26/2019 | 11/26/2019 | 11/26/2019 | P | PART |
Dave Hannah
|
|
|
mock up rm ok
|
BLD-Conference | 11/26/2019 | 11/26/2019 | 11/26/2019 | A | DONE |
Dave Hannah
|
|
|
Want to review a few assemblies with Dave Hannah, please call Mike Beeson, ###-####. need to look at stair handrail and gap at curtianwall assembly. Call mike when on site. Thanks AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Framing/Rough-in | 11/19/2019 | 11/20/2019 | 11/20/2019 | A | CANC |
Dave Hannah
|
|
|
Framing walk with Forte. Call adam when heading to site. ###-####. Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 11/7/2019 | 11/8/2019 | 11/8/2019 | A | DONE |
Dave Hannah
|
|
|
Meet to review UL Listing for hotel ceiling assembly as discussed on Thursday. AKJ Call adam when heading to site. ###-####. Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Wall cover | 11/6/2019 | 11/7/2019 | 11/7/2019 | A | PASS |
Dave Hannah
|
|
|
Unit Mock Up permission to cover mock up, Room 223. Call Adam when heading to the site.Thanks AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Energy code compliance | 11/6/2019 | 11/7/2019 | 11/7/2019 | A | PASS |
Dave Hannah
|
|
|
Unit Mock Up energy Inspection, Room 223. Call Adam when heading to the site.Thanks AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Framing/Rough-in | 10/29/2019 | 10/30/2019 | 10/30/2019 | A | PEND |
Dave Hannah
|
|
|
Framing on level 1 Phone #: ###-#### Inspection requested via web by Mike Beeson
|
BLD-Other | 10/8/2019 | 10/9/2019 | 10/9/2019 | A | PASS |
Dave Hannah
|
|
|
Look at firestop caulk joints, CMU to Concrete in Parking Garage, L2 Demising walls with Mike B. and Adam J.. Call Adam when heading to site. AKJ 100819 Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 10/8/2019 | 10/9/2019 | 10/9/2019 | A | PASS |
Dave Hannah
|
|
|
Weekly inspection walk with Mike B. and Adam J.. Call Adam when heading to site. AKJ 100819 Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Framing/Rough-in | 9/30/2019 | 9/30/2019 | 10/1/2019 | P | PASS |
Dave Hannah
|
|
|
Level 2 framing inspection, SOMD for L 3 ready to place Wednesday. Call Adam when heading to the site. ###-####. Thanks, AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 9/26/2019 | 9/27/2019 | 9/27/2019 | A | CANC |
Tony Young
|
|
|
Job walk on Home 2, L2 with Forte and ESI. Call Adam when heading to site. Thanks, AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 9/13/2019 | 9/16/2019 | 9/16/2019 | A | PASS |
Dave Hannah
|
|
|
Check in on status, Discuss upcoming scope of work. Call Adam when heading to the site. Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 9/13/2019 | 9/13/2019 | 9/13/2019 | P | CANC |
Dave Hannah
|
|
|
Call Adam when heading to site. Meet at field office to discuss upcoming inspection needs. akj ###-####. Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Aging Inspection | 7/26/2019 | 7/26/2019 | 7/26/2019 | | PASS |
Dave Hannah
|
|
|
work in progress
|
BLD-Conference | 7/15/2019 | 7/16/2019 | 7/17/2019 | A | PASS |
Dave Hannah
|
|
|
Podium Deck, Level 2, area 2, pre placement walk for fire-stop assemblies. Call Adam when heading to site. ###-####.
Thanks. AKJ. Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 6/18/2019 | 6/18/2019 | 6/24/2019 | P | DONE |
Dave Hannah
|
|
|
Walk first round of PT Deck with Adam and Mike. Call adam cell, ###-#### before heading to site.
Thanks akj Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 3/26/2019 | 3/27/2019 | 3/27/2019 | A | DONE |
Dave Hannah
|
|
|
Meet with Adam and Mike to discuss project status, review future fire assembly design in field office. Call Adam when heading to site. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Footing | 3/12/2019 | 3/13/2019 | 3/14/2019 | P | PASS |
Dave Hannah
|
|
|
Inspection Request with Dave Hannah. Meet at ESI Field Office, 610 W. Front Street. Call Adam when heading to site. ###-#### Phone #: ###-#### Inspection requested via web by Adam Johnson
|
Issue PAID IN FULL permit | | | 2/5/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/5/2019 | | DONE |
|
|
|
|
Extend Review Timeline | | | 11/15/2018 | | DONE |
|
|
|
1st Approved 180 day extension per Adele. See documents
|
Meeting | | | 11/6/2018 | | DONE |
|
|
|
Sent in request for extension
|
Expiration Notice | 10/23/2018 | 11/14/2018 | 10/23/2018 | | DONE |
Brittany Hill
|
|
|
|
OVERRIDE | | | 10/5/2018 | | |
|
|
|
|
Plan assigned to (CJW) | 6/16/2018 | 6/16/2018 | 10/5/2018 | | PASS |
Carl Westfall
|
|
|
(3rd done) 07/17/18 (new - 25 days) (ePlan - 106 sheets) Front Street development
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/5/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/5/2018 | | DONE |
|
|
|
KOREYHALL@ESICONSTRUCTION.COM
MET
NEED
RP
GC Form
REVISED VALUE
|
Routing - Design Review | 10/2/2018 | | 10/3/2018 | | PASS |
Katelyn Menuge
|
|
|
DRH17-00530
|
Routing - PLAN CHECK | 10/1/2018 | | 10/2/2018 | | PASS |
Carl Westfall
|
|
|
Routed drawings
|
Routing PW Street Lights | 10/2/2018 | | 10/2/2018 | | PASS |
Tom Marshall
|
|
|
|
Plan resubmittals received | | | 10/1/2018 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 9/5/2018 | | 9/18/2018 | | PASS |
Carl Westfall
|
|
|
Jared Bauider (CH2M Hill)
|
Plan resubmittals requested | | | 9/18/2018 | | DONE |
|
|
|
|
Routing - FIRE | 9/5/2018 | | 9/10/2018 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Routing - PLUMBING | 9/5/2018 | | 9/10/2018 | | PASS |
Bill VanDegrift
|
|
|
per plans and ISPC
|
Routing PW Sewer Design | 9/5/2018 | | 9/7/2018 | | PASS |
DeAnn Brown
|
|
|
|
Routing - Design Review | 9/5/2018 | | 9/7/2018 | | FAIL |
Katelyn Menuge
|
|
|
See changemarks regarding pocket park. An approved lighting and photometric plan for the overall site shall be submitted prior to sign-off on any building permits.
|
Routing PW Street Lights | 9/5/2018 | | 9/5/2018 | | FAIL |
Evan Carpenter
|
|
|
Part numbers and drawing number need to be added to the drawing.
|
Routing - PLAN CHECK | 9/4/2018 | | 9/5/2018 | | PASS |
Carl Westfall
|
|
|
Pending approval by structural
|
Plan resubmittals received | | | 9/4/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 8/29/2018 | | 8/31/2018 | | FAIL |
Carl Westfall
|
|
|
Failed the plan intake for the 2nd review. Additional drawings need to be uploaded. Routed the workflow back to the applicant.
|
Plan resubmittals received | | | 8/29/2018 | | DONE |
|
|
|
|
Route to Impact Fee Review | 7/31/2018 | 8/3/2018 | 8/1/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Plan resubmittals requested | | | 7/31/2018 | | DONE |
|
|
|
|
Routing - FIRE | 6/18/2018 | 6/18/2018 | 7/30/2018 | | FAIL |
Erika Akin
|
|
|
Attached comments to case and emailed architect
|
1st review completed | | | 7/30/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/18/2018 | | 7/27/2018 | | FAIL |
Carl Westfall
|
|
|
1st review completed
|
Routing Off Site - STRUCTURAL | 6/18/2018 | | 7/10/2018 | | FAIL |
Carl Westfall
|
|
|
Jared Bauider (CH2M Hill)
|
Routing - PLUMBING | 6/18/2018 | | 6/26/2018 | | FAIL |
Bill VanDegrift
|
|
|
complete GRD18-00041 review prior to approval of this phase
|
Routing - Design Review | 6/18/2018 | | 6/20/2018 | | FAIL |
Katelyn Menuge
|
|
|
DRH17-00530 A copy of a signed and recorded ITD License Agreement is required for building over the property line along Front Street. The applicant shall submit a proposal for finishing of the exposed concrete to be reviewed and approved.
|
Routing PW Drainage | 6/18/2018 | | 6/19/2018 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Street Lights | 6/18/2018 | | 6/18/2018 | | FAIL |
Tom Marshall
|
|
|
|
Routing PW Sewer Design | 6/18/2018 | | 6/18/2018 | | FAIL |
DeAnn Brown
|
|
|
Revise utility and site plan per the changemarks in eplanreview. Changemarks are copied from GRD18-00041.
|
Routing PW Solid Waste | 6/18/2018 | | 6/18/2018 | | PASS |
Evan Carpenter
|
|
|
|
Routing PW Environmental | 6/18/2018 | | 6/18/2018 | | PASS |
Terry Alber
|
|
|
Connect ALL kitchen drains to Grease Interceptor, including dishwasher drain.
|
Routing - PLANNING | 6/18/2018 | | 6/18/2018 | | PASS |
Brent Moore
|
|
|
SUB18-00022
|
Routing - Addressing | 6/18/2018 | | 6/18/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 6/18/2018 | | 6/18/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing - Erosion and Sediment | 6/18/2018 | | 6/18/2018 | | PASS |
Michael Zawacki
|
|
|
Site prep inspection required, would like to do walk through with RP prior to construction activities.
|
Plans ACCEPTED BY PLAN TECH | | | 6/13/2018 | | DONE |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/13/2018 | | DONE |
Christina Prado
|
|
|
|
Plan Reviewer's activity | | | 6/13/2018 | | DONE |
|
|
|
Plan intake review approved per direction from Jason Blais, Building Official.
|
Intake Approval | | | 6/13/2018 | | PASS |
|
|
|
|
Intake Approval | | | 5/31/2018 | | FAIL |
|
|
|
(5-31-18) Please refer to the circled items in the plan intake checklist. Please resolve each item as directed. CJW
|
Intake Approval | | | 5/26/2018 | | FAIL |
|
|
|
(5-26-18) Please refer to the circled items in the plan intake checklist. Please resolve each item as directed. CJW
|
Application received | | | 5/23/2018 | | DONE |
|
|
|
Application submitted via PDS Online on May 23 2018 10:11AM
|