Permit Information
Permit NumberBLD18-01839
StatusFinaled
Name BOISE BUILDING CO
Site Address 3834 N SANDPOINT WAY
Project NameHighlands Cove 7-3
Customer Number 
ePlanReviewYes
Description
W.U.I. Zone A, Class A Roof Required. Permit for the construction of a new 2,236 sq. ft., one story single family dwelling with 3 bedrooms, 2 and a half bathrooms, approximately 329 sq. ft. of covered patio/porch and an 808 sq. ft. attached garage per the approved plans and any notations. Prescriptive Energy Compliance. A-1 zoning and setbacks per planning. ***RDP***

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call 208-608-7070 to schedule an inspection.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Blower Door Test Results1/4/20191/4/20191/4/2019PPASS
DetailsTony Young
3.64
BLD-Final1/3/20191/4/20191/4/2019APASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Jessica Bradley
DOC - Permit Finaled1/4/20191/4/20191/4/2019PPASS
DetailsTony Young
PubWorks Occupancy Approval1/4/20191/4/20191/4/2019 DONE
DetailsMelissa Jannusch
A bond for the sites final grading and re-vegetation and drainage has been received by Public Works. Occupancy may be approved by the building department. Melissa Jannusch ###-####.
BLD-Final1/2/20191/3/20191/3/2019PPART
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Jessica Bradley// walk through,, needs hillside,, plumbing passed
BLD-Energy code compliance10/4/201810/5/201810/5/2018PPASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Jessica Bradley
BLD-Framing/Rough-in10/2/201810/2/201810/2/2018PPASS
DetailsMike Jordan
BLD-Other10/2/201810/2/201810/2/2018PPASS
DetailsMike Jordan
Fire rated soffits ok.
BLD-Wall Bracing9/20/20189/21/20189/21/2018PPASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Jessica Bradley
BLD-Wall Bracing9/20/20189/20/20189/20/2018PPART
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Jessica Bradley,, work in progress
BLD-Wall Bracing9/19/20189/20/20189/20/2018ACANC
DetailsTony Young
Phone #: ###-#### >> Inspection requested via web by Jessica Bradley Inspection cancelled from web by: Jessica Bradley
BLD-Foundation8/8/20188/8/20188/8/2018PPASS
DetailsMike Jordan
BLD-Foundation8/7/20188/8/20188/8/2018ANR
DetailsMike Jordan
Phone #: 2086971241 >> Inspection requested via mobile web by Heron. No inspection. Will need to rescedule.
BLD-Footing8/7/20188/7/20188/7/2018PPASS
DetailsTony Young
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
BLD-Footing8/6/20188/7/20188/7/2018APASS
DetailsTony Young
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
BLD-Footing8/5/20188/6/20188/6/2018PNR
DetailsTony Young
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
PubWorks Subgrade Approval8/6/20188/6/20188/6/2018 DONE
DetailsMelissa Jannusch

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
Issue PAID IN FULL permit  7/20/2018 DONE
Inspection Record Card- Bld  7/20/2018 DONE
OVERRIDE  7/18/2018  
Routing - FIRE7/18/20187/18/20187/18/2018 PASS
DetailsTim Frost
Fire flow reported as 1500 Gpm
Routing - PLAN CHECK7/18/2018 7/18/2018 PASS
DetailsMichael Hanson
PLANS/APPL TAKEN TO FRONT DESK  7/18/2018 DONE
DetailsMichael Hanson
Permit Ready to Issue  7/18/2018 DONE
DetailsChristina Prado
All requirements met
Plan assigned to (M_H)7/17/2018 7/18/2018 DONE
DetailsMichael Hanson
07/10 sfd L2 ePlan. 1st review completed - 7/9 Failed for multiple code callout corrections. RDP
Plan assigned to (RDP)6/21/20186/21/20187/17/2018 DEFR
DetailsRob Patrick
7/10 sfd L2 ePlan...7/9 Failed for multiple code callout corrections.
Routing - PLAN CHECK6/21/2018 7/9/2018 FAIL
DetailsRob Patrick
Corrections Required
1st review completed  7/9/2018 FAIL
DetailsRob Patrick
Corrections Required
Routing PW Grading-Hillside6/21/2018 6/27/2018 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
Route to Impact Fee Review6/21/20186/24/20186/25/2018 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - MECHANICAL6/21/2018 6/25/2018 PASS
DetailsChad Schwendiman
Routing - FIRE6/21/20186/21/20186/21/2018 FAIL
DetailsTim Frost
7/10 New SFH ePlan

Fire flow availability is missng.
Plans ACCEPTED BY PLAN TECH  6/21/2018 DONE
Recd Pcfee & Taken To Pln CK  6/21/2018 DONE
Intake Approval  6/21/2018 PASS
Routing - PLANNING6/21/2018 6/21/2018 PASS
DetailsNicolette Womack
Routing - Addressing6/21/2018 6/21/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS6/21/2018 6/21/2018 PASS
DetailsMorgan Webb
Routing - Erosion and Sediment6/21/2018 6/21/2018 PASS
DetailsMichael Zawacki
Foothills home, site prep inspection required.
Intake Approval  6/19/2018 FAIL
1. foundation plan needs to be stamped by an engineer
2. plans must be uploaded as individual sheet with correct file names
Intake Approval  6/11/2018 FAIL
Appeal period over 6/18 at 5pm
Application received  5/23/2018 DONE
Application submitted via PDS Online on May 23 2018 3:28PM