Print Statement | | | 2/8/2019 | | DONE |
|
|
|
|
Second Notice | | 12/24/2018 | 1/8/2019 | | DONE |
|
|
|
mailed 1-11-19
|
First Notice | 11/14/2018 | 11/14/2018 | 12/14/2018 | | DONE |
Brandon Shaw
|
|
|
mailed 12-17
|
BLD-Final | 11/13/2018 | 11/14/2018 | 11/14/2018 | A | PASS |
Brandon Shaw
|
|
|
please call me ahead of time for the final inspection ###-####
thanks Mike Teeter Phone #: ###-#### Inspection requested via web by Mike Teeter
|
DOC - Permit Finaled | 11/14/2018 | 11/14/2018 | 11/14/2018 | P | PASS |
Brandon Shaw
|
|
|
|
FIRE-Final Inspection | 11/9/2018 | 11/13/2018 | 11/13/2018 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. No sprinkler work
Please give me a call ahead of time ###-#### thanks Mike Teeter Inspection requested via web by Mike Teeter
|
BLD-Framing/Rough-in | 11/9/2018 | 11/13/2018 | 11/13/2018 | A | PASS |
Jim Sly
|
|
|
Please call me ahead of time ###-#### thanks Mike Teeter Inspection requested via web by Mike Teeter
|
Issue PAID IN FULL permit | | | 6/18/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/18/2018 | | DONE |
|
|
|
|
Plan assigned to (RMH) | 6/7/2018 | 6/7/2018 | 6/7/2018 | | PASS |
Ron Hill
|
|
|
6/06 L1 Albertsons ePlan**
|
Plan assigned to (JG) | 5/31/2018 | 5/31/2018 | 6/7/2018 | | DEFR |
Javier Guzman
|
|
|
6/06 L1 Albertsons ePlan**
|
Routing - PLAN CHECK | 5/31/2018 | | 6/7/2018 | | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 6/7/2018 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/7/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/7/2018 | | DONE |
|
|
|
MET
NEED
GC
Rev Cert of Val
|
Intake Approval | | | 5/31/2018 | | PASS |
Javier Guzman
|
|
|
|
Routing - PLUMBING | 5/31/2018 | | 5/31/2018 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing - Addressing | 5/31/2018 | | 5/31/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 5/31/2018 | | 5/31/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing - Design Review | 5/31/2018 | | 5/31/2018 | | PASS |
Andrea Tuning
|
|
|
No exterior modifications are proposed. Design Review is not required.
|
Intake Approval | | | 5/29/2018 | | FAIL |
Michael Hanson
|
|
|
This permit has failed prescreen due to the following:
1. 518 form not completed or signed.
2. Architectural sheets not stamped or signed.
3. Provide structural analysis that verifies CMU wall removed at front of building does not compromise structure.
4. Provide wall bracing detail for 15'-1 1/2" partition wall.
|
Application received | | | 5/25/2018 | | DONE |
|
|
|
Application submitted via PDS Online on May 25 2018 9:33AM
|