Second Notice | | 12/6/2019 | 12/3/2019 | | DONE |
|
|
|
This permit finaled on the web by Chrisie Paiz
|
First Notice | 11/13/2019 | 11/13/2019 | 11/26/2019 | | DONE |
Dave Hannah
|
|
|
mailed 12-2-19
|
BLD-Final | 11/12/2019 | 11/13/2019 | 11/13/2019 | A | PASS |
Dave Hannah
|
|
|
James Phone #: ###-####
|
DOC - Permit Finaled | 11/13/2019 | 11/13/2019 | 11/13/2019 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Foundation | 12/18/2018 | 12/18/2018 | 12/18/2018 | P | PASS |
Dave Hannah
|
|
|
Rod-wall Phone #: ###-####
|
BLD-Footing | 12/18/2018 | 12/18/2018 | 12/18/2018 | P | PASS |
Dave Hannah
|
|
|
Rod Phone #: ###-####
|
BLD-Foundation | 12/4/2018 | 12/4/2018 | 12/4/2018 | P | PASS |
Dave Hannah
|
|
|
Rowdy Phone #: ###-####
|
BLD-Footing | 11/29/2018 | 11/29/2018 | 11/30/2018 | P | DONE |
Dave Hannah
|
|
|
Rowdy Phone #: ###-####
|
BLD-Footing | 11/29/2018 | 11/30/2018 | 11/30/2018 | A | PASS |
Dave Hannah
|
|
|
Rowdy Phone #: ###-####
|
Issue PAID IN FULL permit | | | 10/18/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/18/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/17/2018 | | DONE |
|
|
|
|
Plan assigned to (BJM) | 5/31/2018 | 5/31/2018 | 10/10/2018 | | DONE |
Brian McGowan
|
|
|
River Park Building- Corrections needed for Design Review and Drainage.
|
OVERRIDE | | | 9/26/2018 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/26/2018 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 9/26/2018 | | |
|
|
|
|
Permit Ready to Issue | | | 9/26/2018 | | DONE |
|
|
|
all met and sign off card is in approved drawings-NEED
RP-met
GC FORM-met
REVISED VALUE-met
|
Routing - Design Review | 9/25/2018 | | 9/25/2018 | | PASS |
Josh Wilson
|
|
|
Floodplain permit approved under CFH18-00078
|
Routing PW Drainage | 9/24/2018 | | 9/24/2018 | | PASS |
Brian Murphy
|
|
|
|
Routing - Design Review | 8/14/2018 | | 8/14/2018 | | PASS |
Andrea Tuning
|
|
|
DRH18-00180 Andrea
Applicant is required to obtain a floodplain permit.
|
Route to Impact Fee Review | 7/18/2018 | 7/21/2018 | 7/19/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 7/18/2018 | | DONE |
Brian McGowan
|
|
|
See Drainage and Design Review corrections
|
Routing - PLAN CHECK | 5/31/2018 | | 7/18/2018 | | PASS |
Brian McGowan
|
|
|
|
Routing - FIRE | 5/31/2018 | 5/31/2018 | 6/18/2018 | | PASS |
Erika Akin
|
|
|
No fire life safety inspection required
|
Routing PW Drainage | 5/31/2018 | | 6/6/2018 | | FAIL |
|
|
|
need revisions
|
Routing - Erosion and Sediment | 5/31/2018 | | 6/4/2018 | | PASS |
Andy J. Long
|
|
|
ESC plan with narrative notes approved. ESC Responsible Person tbd. Site preparation inspection is required prior to excavation.
|
Routing PW Flood Plain | 5/31/2018 | | 6/1/2018 | | PASS |
Jason C. Taylor
|
|
|
Approved LOMR in file. No floodplain review required. JCT
|
Routing - PLANNING | 5/31/2018 | | 6/1/2018 | | PASS |
Nicolette Womack
|
|
|
|
Routing - Addressing | 5/31/2018 | | 5/31/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 5/31/2018 | | 5/31/2018 | | PASS |
Morgan Webb
|
|
|
|
Intake Approval | | | 5/31/2018 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/31/2018 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/31/2018 | | DONE |
|
|
|
|
Routing - Design Review | 5/31/2018 | | 5/31/2018 | | FAIL |
Andrea Tuning
|
|
|
DRH18-00180 Andrea
Applicant is required to obtain a floodplain permit.
|
Routing PW Street Lights | 5/31/2018 | | 5/31/2018 | | PASS |
Tom Marshall
|
|
|
|
Routing - PLUMBING | 5/31/2018 | | 5/31/2018 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Application received | | | 5/29/2018 | | DONE |
|
|
|
Application submitted via PDS Online on May 29 2018 3:54PM
|
Routing PW Drainage | 8/15/2018 | | | | FAIL |
|
|
|
needs insert
|